Growing Science » Authors » Singa Wang Chiu
Authors: Yuan-Shyi P. Chiu, Ya-Lei Lo, Fan-Yun Pai, Victoria Chiu, Singa Wang Chiu
DOI: 10.5267/j.ijiec.2023.11.002
Keywords: Fabricating-shipping system, Hybrid multi-item batch system, Adjustable rate, Postponement, Scrap, Multiple shipments, Subcontracting
Journal: IJIEC | Year: 2024 | Volume: 15 | Issue: 1 | Views: 349 | Reviews: 0
Authors: Yuan-Shyi P. Chiu, Jian-Hua Lian, Fan-Yun Pai, Tiffany Chiu, Singa Wang Chiu
DOI: 10.5267/j.ijiec.2023.9.010
Keywords: Buyer-vendor coordination, Runtime planning, Scrap, Multi-shipment, Breakdowns, Overtime, External source
Journal: IJIEC | Year: 2024 | Volume: 15 | Issue: 1 | Views: 482 | Reviews: 0
Authors: Yuan-Shyi P. Chiu, Hung-Yi Chen, Victoria Chiu, Singa Wang Chiu, Hsiao-Chun Wu
DOI: 10.5267/j.ijiec.2023.6.002
Keywords: Multi-item manufacturing-delivery, Postponement, Subcontracting, Quality assurance, Supply-chain, Multiple deliveries
Journal: IJIEC | Year: 2023 | Volume: 14 | Issue: 4 | Views: 436 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Ting-Fang Yan, Singa Wang Chiu, Hui-Chi Wang, Tiffany Chiu
DOI: 10.5267/j.ijiec.2023.1.001
Keywords: Multiproduct production-shipping problem, Delayed differentiation, Rework, Multi-delivery, Overtime, Outsourcing
Journal: IJIEC | Year: 2023 | Volume: 14 | Issue: 2 | Views: 682 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Singa Wang Chiu, Fan-Yun Pai, Victoria Chiu
DOI: 10.5267/j.ijiec.2022.10.001
Keywords: Manufacturing planning, Operating expenditures, Quality reassurances, Probabilistic failures, Overtime, Outsourcing
Journal: IJIEC | Year: 2023 | Volume: 14 | Issue: 1 | Views: 746 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Yunsen Wang, Tsu-Ming Yeh, Singa Wang Chiu
DOI: 10.5267/j.ijiec.2022.4.001
Keywords: Fabricating runtime, Probabilistic breakdowns, Overtime, Scrap, Outsourcing
Journal: IJIEC | Year: 2022 | Volume: 13 | Issue: 3 | Views: 1043 | Reviews: 0
Authors: Singa Wang Chiu, Hua-Yao Wu, Tsu-Ming Yeh, Yunsen Wang
DOI: 10.5267/j.ijiec.2021.4.001
Keywords: Hybrid economic production quantity, Poisson-distributed breakdown, Random scrap, Rework, Outsourcing, Production planning
Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 3 | Views: 1011 | Reviews: 0
Authors: Singa Wang Chiu, Victoria Chiu, Ming-Hon Hwang, Yuan-Shyi Peter Chiu
DOI: 10.5267/j.ijiec.2021.1.001
Keywords: Multiproduct batch manufacturing, Delayed differentiation, Overtime, Outsourcing, Quality reassurance
Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 2 | Views: 1295 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Huei-Hsin Chang, Tiffany Chiu, Singa Wang Chiu
DOI: 10.5267/j.ijiec.2020.9.003
Keywords: Multi-item manufacturing, Outsourcing, Delayed differentiation, Rework, Scrap, Batch fabrication
Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 1 | Views: 1085 | Reviews: 0
Authors: Singa Wang Chiu, Liang-Wei You, Peng-Cheng Sung, Yunsen Wang
DOI: 10.5267/j.ijiec.2020.6.002
Keywords: Production runtime, Stochastic breakdown, Accelerated manufacturing rate, Repairable items, Multi-delivery plan
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 4 | Views: 999 | Reviews: 0
® 2010-2024 GrowingScience.Com