How to cite this paper
Chiu, Y., Chiu, S., Pai, F & Chiu, V. (2023). Minimizing operating expenditures for a manufacturing system featuring quality reassurances, probabilistic failures, overtime, and outsourcing.International Journal of Industrial Engineering Computations , 14(1), 83-98.
Refrences
Chiu, S.W. (2010). Robust planning in optimization for production system subject to random machine breakdown and failure in rework. Computers & Operations Research, 37(5), 899-908.
Chiu, S.W., You, L-W., Sung, P-C., & Wang, Y. (2020) Determining the fabrication runtime for a buyer-vendor system with stochastic breakdown, accelerated rate, repairable items, and multi-delivery strategy. International Journal of Industrial Engineering Computations, 11(4), 491-508.
Chiu, S.W., Wu, H.-Y., Yeh, T.-M., & Wang, Y. (2021a). Solving a hybrid batch production problem with unreliable equipment and quality reassurance. International Journal of Industrial Engineering Computations, 12(3), 235-248.
Chiu, Y.-S.P., Chiu, T., Pai, F.-Y., & Wu, H.Y. (2021b). A producer-retailer incorporated multi-item EPQ problem with delayed differentiation, the expedited rate for common parts, multi-delivery and scrap. International Journal of Industrial Engineering Computations, 12(4), 427-440.
Çimen, T., Baykasoğlu, A., & Akyol, S.D. (2022). Assembly line rebalancing and worker assignment considering ergonomic risks in an automotive parts manufacturing plant. International Journal of Industrial Engineering Computations, 13(3), 363-384.
Dekker, H.C., Mooi, E., & Visser, A. (2020). Firm enablement through outsourcing: A longitudinal analysis of how outsourcing enables process improvement under financial and competence constraints. Industrial Marketing Management, 90, 124-132.
Dewi, Hajadi, F., Handranata, Y.W., & Herlina, M.G. (2021). The effect of service quality and customer satisfaction toward customer loyalty in service industry. Uncertain Supply Chain Management, 9(3), 631-636.
Di Nardo, M., Madonna, M., Addonizio, P., & Gallab, M. (2021). A mapping analysis of maintenance in Industry 4.0. Journal of Applied Research and Technology, 19(6), 653-675.
Ebrahim, Z., & Abdul Rasib, A.H. (2017). Unnecessary overtime as a component of time loss measures in assembly processes. Journal of Advanced Manufacturing Technology, 11(1), 37-47.
Gupta, P., Chawla, V.K., Jain, V., & Angra, S. (2022). Green operations management for sustainable development: An explicit analysis by using fuzzy best-worst method. Decision Science Letters, 11(3), 357-366.
Heydari, J., Govindan, K., Ebrahimi Nasab, H.R., & Taleizadeh, A.A. (2020). Coordination by quantity flexibility contract in a two-echelon supply chain system: Effect of outsourcing decisions. International Journal of Production Economics, 225, Art. No. 107586.
Iqbal, T. (2020). Investigating logistics issues in service quality of smes in Saudi Arabia. Uncertain Supply Chain Management, 8(4), 875-886.
Ishida, Y., Murayama, H., & Fukuda, Y. (2020). Association Between Overtime-Working Environment and Psychological Distress Among Japanese Workers: A Multilevel Analysis. Journal of occupational and environmental medicine, 62(8), 641-646.
Jaehn, F., Kovalev, S., Kovalyov, M.Y., & Pesch, E. (2014). Multiproduct batching and scheduling with buffered rework: The case of a car paint shop. Naval Research Logistics, 61(6), 458-471.
Kahar, A., Muh. Ikbal, A., Tampang, Masdar, R., & Masrudin (2022). Value chain analysis of total quality control, quality performance and competitive advantage of agricultural SMEs. Uncertain Supply Chain Management, 10(2), 551-558.
Kaviyarasu, V., & Sivakumar, P. (2022). Optimization of bayesian repetitive group sampling plan for quality determination in pharmaceutical products and related materials. International Journal of Industrial Engineering Computations, 13(1), 31-42.
Lusa, A., Pastor, R., & Corominas, A. (2008). Determining the most appropriate set of weekly working hours for planning annualised working time. International Journal of Production Economics, 111, 697-706.
Mabrouk, N.B. (2020). Green supplier selection using fuzzy delphi method for developing sustainable supply chain. Decision Science Letters, 10(1), 63-70.
Moon, Y. (2010). Efforts and efficiency in partial outsourcing and investment timing strategy under market uncertainty. Computers & Industrial Engineering, 59(1), 24-33.
Najafi, M., Ghodratnama, A., Pasandideh, S.H.R. (2018). Solving a deterministic multi-product single-machine EPQ model with partial backordering, scrapped products and rework. International Journal of Supply and Operations Management, 5(1), 11-27.
Ouaddi, K., Mhada, F.-Z., & Benadada, Y. (2020). Memetic algorithm for multi-tours dynamic vehicle routing problem with overtime (Mdvrpot). International Journal of Industrial Engineering Computations, 11(4), 643-662.
Patil, A.S., Pisal, M.V., & Suryavanshi, C.T. (2021). Application of value stream mapping to enhance productivity by reducing manufacturing lead time in a manufacturing company: A case study. Journal of Applied Research and Technology, 19(1), 11-22.
Rafiee, K., Rabbani, M., Rafiei, H., & Rahimi-Vahed, A. (2011) A new approach towards integrated cell formation and inventory lot sizing in an unreliable cellular manufacturing system. Applied Mathematical Modelling, 35(4), 1810-1819.
Ramasubbu, N., Shang, J., May, J.H., Tjader, Y., & Vargas, L. (2019). Task interdependence and firm performance in outsourced service operations. Manufacturing and Service Operations Management, 21(3), 658-673.
Reynard, P.C. (1998). Manufacturing strategies in the eighteenth century: Subcontracting for growth among papermakers in the Auvergne. Journal of Economic History, 58(1), 155-182.
Rouhani, S., Pishvaee, M.S., & Zarrinpoor, N. (2021). A fuzzy optimization approach to strategic organ transplantation network design problem: A real case study. Decision Science Letters, 10(3), 195-216.
Sung, P.-C., Lai, C.-M., Wang, Y., & Chiu, Y.-S.P. (2022). Minimization of multiproduct fabrication cost featuring rework, commonality, external provider, and postponement. Uncertain Supply Chain Management, 10(2), 353-364.
Waiyawuththanapoom, P., Jermsittiparsert, K. (2022). The role of sustainable HRM in supply chain, profitability and resource utilization. Uncertain Supply Chain Management, 10(2), 365-374.
Youssef, A.M.A., ElMaraghy, M.A. (2008). Performance analysis of manufacturing systems composed of modular machines using the universal generating function. Journal of Manufacturing Systems, 27(2), 55-69.
Zhu, S.X. (2015). Dynamic replenishment from two sources with different yields, costs, and lead times. International Journal of Production Economics, 165(C), 79-89.
Chiu, S.W., You, L-W., Sung, P-C., & Wang, Y. (2020) Determining the fabrication runtime for a buyer-vendor system with stochastic breakdown, accelerated rate, repairable items, and multi-delivery strategy. International Journal of Industrial Engineering Computations, 11(4), 491-508.
Chiu, S.W., Wu, H.-Y., Yeh, T.-M., & Wang, Y. (2021a). Solving a hybrid batch production problem with unreliable equipment and quality reassurance. International Journal of Industrial Engineering Computations, 12(3), 235-248.
Chiu, Y.-S.P., Chiu, T., Pai, F.-Y., & Wu, H.Y. (2021b). A producer-retailer incorporated multi-item EPQ problem with delayed differentiation, the expedited rate for common parts, multi-delivery and scrap. International Journal of Industrial Engineering Computations, 12(4), 427-440.
Çimen, T., Baykasoğlu, A., & Akyol, S.D. (2022). Assembly line rebalancing and worker assignment considering ergonomic risks in an automotive parts manufacturing plant. International Journal of Industrial Engineering Computations, 13(3), 363-384.
Dekker, H.C., Mooi, E., & Visser, A. (2020). Firm enablement through outsourcing: A longitudinal analysis of how outsourcing enables process improvement under financial and competence constraints. Industrial Marketing Management, 90, 124-132.
Dewi, Hajadi, F., Handranata, Y.W., & Herlina, M.G. (2021). The effect of service quality and customer satisfaction toward customer loyalty in service industry. Uncertain Supply Chain Management, 9(3), 631-636.
Di Nardo, M., Madonna, M., Addonizio, P., & Gallab, M. (2021). A mapping analysis of maintenance in Industry 4.0. Journal of Applied Research and Technology, 19(6), 653-675.
Ebrahim, Z., & Abdul Rasib, A.H. (2017). Unnecessary overtime as a component of time loss measures in assembly processes. Journal of Advanced Manufacturing Technology, 11(1), 37-47.
Gupta, P., Chawla, V.K., Jain, V., & Angra, S. (2022). Green operations management for sustainable development: An explicit analysis by using fuzzy best-worst method. Decision Science Letters, 11(3), 357-366.
Heydari, J., Govindan, K., Ebrahimi Nasab, H.R., & Taleizadeh, A.A. (2020). Coordination by quantity flexibility contract in a two-echelon supply chain system: Effect of outsourcing decisions. International Journal of Production Economics, 225, Art. No. 107586.
Iqbal, T. (2020). Investigating logistics issues in service quality of smes in Saudi Arabia. Uncertain Supply Chain Management, 8(4), 875-886.
Ishida, Y., Murayama, H., & Fukuda, Y. (2020). Association Between Overtime-Working Environment and Psychological Distress Among Japanese Workers: A Multilevel Analysis. Journal of occupational and environmental medicine, 62(8), 641-646.
Jaehn, F., Kovalev, S., Kovalyov, M.Y., & Pesch, E. (2014). Multiproduct batching and scheduling with buffered rework: The case of a car paint shop. Naval Research Logistics, 61(6), 458-471.
Kahar, A., Muh. Ikbal, A., Tampang, Masdar, R., & Masrudin (2022). Value chain analysis of total quality control, quality performance and competitive advantage of agricultural SMEs. Uncertain Supply Chain Management, 10(2), 551-558.
Kaviyarasu, V., & Sivakumar, P. (2022). Optimization of bayesian repetitive group sampling plan for quality determination in pharmaceutical products and related materials. International Journal of Industrial Engineering Computations, 13(1), 31-42.
Lusa, A., Pastor, R., & Corominas, A. (2008). Determining the most appropriate set of weekly working hours for planning annualised working time. International Journal of Production Economics, 111, 697-706.
Mabrouk, N.B. (2020). Green supplier selection using fuzzy delphi method for developing sustainable supply chain. Decision Science Letters, 10(1), 63-70.
Moon, Y. (2010). Efforts and efficiency in partial outsourcing and investment timing strategy under market uncertainty. Computers & Industrial Engineering, 59(1), 24-33.
Najafi, M., Ghodratnama, A., Pasandideh, S.H.R. (2018). Solving a deterministic multi-product single-machine EPQ model with partial backordering, scrapped products and rework. International Journal of Supply and Operations Management, 5(1), 11-27.
Ouaddi, K., Mhada, F.-Z., & Benadada, Y. (2020). Memetic algorithm for multi-tours dynamic vehicle routing problem with overtime (Mdvrpot). International Journal of Industrial Engineering Computations, 11(4), 643-662.
Patil, A.S., Pisal, M.V., & Suryavanshi, C.T. (2021). Application of value stream mapping to enhance productivity by reducing manufacturing lead time in a manufacturing company: A case study. Journal of Applied Research and Technology, 19(1), 11-22.
Rafiee, K., Rabbani, M., Rafiei, H., & Rahimi-Vahed, A. (2011) A new approach towards integrated cell formation and inventory lot sizing in an unreliable cellular manufacturing system. Applied Mathematical Modelling, 35(4), 1810-1819.
Ramasubbu, N., Shang, J., May, J.H., Tjader, Y., & Vargas, L. (2019). Task interdependence and firm performance in outsourced service operations. Manufacturing and Service Operations Management, 21(3), 658-673.
Reynard, P.C. (1998). Manufacturing strategies in the eighteenth century: Subcontracting for growth among papermakers in the Auvergne. Journal of Economic History, 58(1), 155-182.
Rouhani, S., Pishvaee, M.S., & Zarrinpoor, N. (2021). A fuzzy optimization approach to strategic organ transplantation network design problem: A real case study. Decision Science Letters, 10(3), 195-216.
Sung, P.-C., Lai, C.-M., Wang, Y., & Chiu, Y.-S.P. (2022). Minimization of multiproduct fabrication cost featuring rework, commonality, external provider, and postponement. Uncertain Supply Chain Management, 10(2), 353-364.
Waiyawuththanapoom, P., Jermsittiparsert, K. (2022). The role of sustainable HRM in supply chain, profitability and resource utilization. Uncertain Supply Chain Management, 10(2), 365-374.
Youssef, A.M.A., ElMaraghy, M.A. (2008). Performance analysis of manufacturing systems composed of modular machines using the universal generating function. Journal of Manufacturing Systems, 27(2), 55-69.
Zhu, S.X. (2015). Dynamic replenishment from two sources with different yields, costs, and lead times. International Journal of Production Economics, 165(C), 79-89.