How to cite this paper
Chiu, Y., Lian, J., Pai, F., Chiu, T & Chiu, S. (2024). An operating cost minimization model for buyer-vendor coordination batch system with breakdowns, scrap, overtime, and an external source.International Journal of Industrial Engineering Computations , 15(1), 277-292.
Refrences
Abushaega, M.M., Daehy, Y.H., Alghamdi, S.Y., Krishnan, K.K., & Khamaj, A. (2021). Design of supply chain network to reduce impacts of damages during shipping. Management and Production Engineering Review, 12(2), 17-26.
Assid, M., Gharbi, A., & Dhouib, K. (2015). Joint production and subcontracting planning of unreliable multi-facility multi-product production systems. Omega, 50, 54-69.
Barak, S., & Javanmard, S. (2020). Outsourcing modelling using a novel interval-valued fuzzy quantitative strategic planning matrix (QSPM) and multiple criteria decision-making (MCDMs). International Journal of Production Economics, 222, Art. No. 107494.
Ben-Daya, M., Al-Nassar, A. (2008). An integrated inventory production system in a three-layer supply chain. Production Planning and Control, 19(2), 97-104.
Chiu, S. W., Lin, H. D., Song, M. S., Chen, H. M., & Chiu, Y. S. P. (2015). An extended EPQ-based problem with a discontinuous delivery policy, scrap rate, and random breakdown. The Scientific World Journal, 2015. Article ID 621978.
Chiu, Y-S.P., Zhao, Z-Y., Chiu, S.W., & Chiu, V. (2020). A vendor-buyer coordinated system featuring an unreliable machine, scrap, outsourcing, and multiple shipments. International Journal of Industrial Engineering Computations, 11(3), 341-358.
Chiu, Y.-S.P., Chiu, V., Lin, H.-D., & Chiu, T. (2021). Multiproduct fabrication-shipment decision making incorporating an accelerated rate and ensured product quality. Management and Production Engineering Review, 12(2), 33-44.
Chiu, Y.-S.P., Wang, Y., Yeh, T.-M., & Chiu, S.W. (2022). Fabrication runtime decision for a hybrid system incorporating probabilistic breakdowns, scrap, and overtime. International Journal of Industrial Engineering Computations, 13(3), 293-308.
Chiu Y-S.P., Yan T-F., Chiu S.W., Wang H.-C., & Chiu T. (2023). Impact of dual uptime-reducing strategies, postponement, multi-delivery, and rework on a multiproduct fabrication-shipping problem. International Journal of Industrial Engineering Computations, 14(2), 323-340.
Çömez-Dolgan, N., Moussawi-Haidar, L., & Jaber, M. Y. (2021). A buyer-vendor system with untimely delivery costs: Traditional coordination vs. VMI with consignment stock. Computers & Industrial Engineering, 154, Art. No. 107009.
Conway, N., Sturges, J. (2014). Investigating unpaid overtime working among the part-time workforce. British Journal of Management, 25(4), 755-771.
Cornelius, A., Dvorak, J., Jacobs, L., Penney, J., & Schmitz, T. (2021). Combination of structured light scanning and external fiducials for coordinate system transfer in hybrid manufacturing. Journal of Manufacturing Processes, 68, 1824-1836.
Das S., Mandal G., Manna A.K., Shaikh A.A., & Bhunia A.K. (2023). Effects of emission reduction and rework policy in a production system of green products: An interval valued optimal control theoretic approach. Computers and Industrial Engineering, 179, Art. No. 109212.
Dohi, T., Kaio, N., & Osaki, S. (1998). Minimal repair policies for an economic manufacturing process. Journal of Quality in Maintenance Engineering, 4(4), 248-262.
Golden, L., & Wiens-Tuers, B. (2008). Overtime work and wellbeing at home. Review of Social Economy, 66(1), 25-49.
Goyal, S. K., & Gupta, Y. P. (1989). Integrated inventory models: the buyer-vendor coordination. European journal of operational research, 41(3), 261-269.
Hashemi, M., Tavangar, M., & Asadi, M. (2022). Optimal preventive maintenance for coherent systems whose failure occurs due to aging or external shocks. Computers and Industrial Engineering, 163, Art. No. 107829.
Hou, K.-L. (2007). An EPQ model with setup cost and process quality as functions of capital expenditure. Applied Mathematical Modelling, 31(1), 10-17.
Hoque M.A., & Goyal S.K. (2006). A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer. International Journal of Production Economics, 102(2), 217-225.
Karakatsoulis, G., & Skouri, K. (2021). Optimal reorder level and lot size decisions for an inventory system with defective items. Applied Mathematical Modelling, 92, 651-668.
Karimpoor, M., Nasiri, G. R., & Monabbati, S. E. (2023). Production, distribution, and capacity planning for an integrated buyer-vendor system incorporating different production and shipping scenarios. Computers & Industrial Engineering, 184, Art. No. 109545.
Khan, M., Ajmal, M.M., Gunasekaran, A., AlMarzouqi, A.H., & AlNuaimi, B.K. (2021). Measures of greenness: An empirical study in service supply chains in the UAE. International Journal of Production Economics, 241, Art. No. 108257.
Khorshidvand, B., Soleimani, H., Sibdari, S., & Mehdi Seyyed Esfahani, M. (2021). A hybrid modeling approach for green and sustainable closed-loop supply chain considering price, advertisement and uncertain demands. Computers and Industrial Engineering, 157, Art. No. 107326.
Mawandiya, B.K., Jha, J. K., & Thakkar, J. (2017). Production-inventory model for two-echelon closed-loop supply chain with finite manufacturing and remanufacturing rates. International Journal of Systems Science: Operations & Logistics, 4(3), 199-218.
Morita, T. (2010). Dynamic analysis of outsourcing. Journal of Economics, 100(2), 117-140.
Papachristos, S., & Konstantaras, I. (2006). Economic ordering quantity models for items with imperfect quality. International Journal of Production Economics, 100(1), 148-154.
Perarasi, T., Leeban Moses, M., & Raju, C. (2021). Energy optimization by green sensing methodology for channel design in a cognitive radio network. Journal of Applied Research and Technology, 19(2), 153-162.
Pichka, K., Alwan, L.C., & Yue, X. (2022). Fulfillment and pricing optimization for omni-channel retailers considering shipment of in-store demand. Transportation Research Part E: Logistics and Transportation Review, 167, Art. No. 102912.
Porto, A.F., Henao, C.A., Lusa, A., Polo Mejía, O., & Porto Solano, R. (2022). Solving a staffing problem with annualized hours, multiskilling with 2-chaining, and overtime: A retail industry case. Computers and Industrial Engineering, 167, Art. No. 107999.
Salehi, H., Taleizadeh, A.A., & Tavakkoli-Moghaddam, R. (2016). An EOQ model with random disruption and partial backordering. International Journal of Production Research, 54(9), 2600-2609.
Sarmah, S. P., Acharya, D., & Goyal, S. K. (2006). Buyer vendor coordination models in supply chain management. European journal of operational research, 175(1), 1-15.
Shekar, K.C., & Nataraj M. (2023). Subcontracting and enterprise development in India's informal manufacturing sector. Journal of Small Business and Enterprise Development, 30(3), 448 – 474.
Tseng, C-T., Wu, M-F., Lin, H-D., & Chiu, Y.S.P. (2014). Solving a vendor-buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach. Economic Modelling, 36, 30-36.
Yera, Y.G., Lillo, R.E., Nielsen, B.F., Ramírez-Cobo, P., Ruggeri, F. (2021). A bivariate two-state Markov modulated Poisson process for failure modeling. Reliability Engineering and System Safety, 208, Art. No. 107318.
Zhang, Q., Luo, J., & Duan, Y. (2016). Buyer–vendor coordination for fixed lifetime product with quantity discount under finite production rate. International Journal of Systems Science, 47(4), 821-834.
Assid, M., Gharbi, A., & Dhouib, K. (2015). Joint production and subcontracting planning of unreliable multi-facility multi-product production systems. Omega, 50, 54-69.
Barak, S., & Javanmard, S. (2020). Outsourcing modelling using a novel interval-valued fuzzy quantitative strategic planning matrix (QSPM) and multiple criteria decision-making (MCDMs). International Journal of Production Economics, 222, Art. No. 107494.
Ben-Daya, M., Al-Nassar, A. (2008). An integrated inventory production system in a three-layer supply chain. Production Planning and Control, 19(2), 97-104.
Chiu, S. W., Lin, H. D., Song, M. S., Chen, H. M., & Chiu, Y. S. P. (2015). An extended EPQ-based problem with a discontinuous delivery policy, scrap rate, and random breakdown. The Scientific World Journal, 2015. Article ID 621978.
Chiu, Y-S.P., Zhao, Z-Y., Chiu, S.W., & Chiu, V. (2020). A vendor-buyer coordinated system featuring an unreliable machine, scrap, outsourcing, and multiple shipments. International Journal of Industrial Engineering Computations, 11(3), 341-358.
Chiu, Y.-S.P., Chiu, V., Lin, H.-D., & Chiu, T. (2021). Multiproduct fabrication-shipment decision making incorporating an accelerated rate and ensured product quality. Management and Production Engineering Review, 12(2), 33-44.
Chiu, Y.-S.P., Wang, Y., Yeh, T.-M., & Chiu, S.W. (2022). Fabrication runtime decision for a hybrid system incorporating probabilistic breakdowns, scrap, and overtime. International Journal of Industrial Engineering Computations, 13(3), 293-308.
Chiu Y-S.P., Yan T-F., Chiu S.W., Wang H.-C., & Chiu T. (2023). Impact of dual uptime-reducing strategies, postponement, multi-delivery, and rework on a multiproduct fabrication-shipping problem. International Journal of Industrial Engineering Computations, 14(2), 323-340.
Çömez-Dolgan, N., Moussawi-Haidar, L., & Jaber, M. Y. (2021). A buyer-vendor system with untimely delivery costs: Traditional coordination vs. VMI with consignment stock. Computers & Industrial Engineering, 154, Art. No. 107009.
Conway, N., Sturges, J. (2014). Investigating unpaid overtime working among the part-time workforce. British Journal of Management, 25(4), 755-771.
Cornelius, A., Dvorak, J., Jacobs, L., Penney, J., & Schmitz, T. (2021). Combination of structured light scanning and external fiducials for coordinate system transfer in hybrid manufacturing. Journal of Manufacturing Processes, 68, 1824-1836.
Das S., Mandal G., Manna A.K., Shaikh A.A., & Bhunia A.K. (2023). Effects of emission reduction and rework policy in a production system of green products: An interval valued optimal control theoretic approach. Computers and Industrial Engineering, 179, Art. No. 109212.
Dohi, T., Kaio, N., & Osaki, S. (1998). Minimal repair policies for an economic manufacturing process. Journal of Quality in Maintenance Engineering, 4(4), 248-262.
Golden, L., & Wiens-Tuers, B. (2008). Overtime work and wellbeing at home. Review of Social Economy, 66(1), 25-49.
Goyal, S. K., & Gupta, Y. P. (1989). Integrated inventory models: the buyer-vendor coordination. European journal of operational research, 41(3), 261-269.
Hashemi, M., Tavangar, M., & Asadi, M. (2022). Optimal preventive maintenance for coherent systems whose failure occurs due to aging or external shocks. Computers and Industrial Engineering, 163, Art. No. 107829.
Hou, K.-L. (2007). An EPQ model with setup cost and process quality as functions of capital expenditure. Applied Mathematical Modelling, 31(1), 10-17.
Hoque M.A., & Goyal S.K. (2006). A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer. International Journal of Production Economics, 102(2), 217-225.
Karakatsoulis, G., & Skouri, K. (2021). Optimal reorder level and lot size decisions for an inventory system with defective items. Applied Mathematical Modelling, 92, 651-668.
Karimpoor, M., Nasiri, G. R., & Monabbati, S. E. (2023). Production, distribution, and capacity planning for an integrated buyer-vendor system incorporating different production and shipping scenarios. Computers & Industrial Engineering, 184, Art. No. 109545.
Khan, M., Ajmal, M.M., Gunasekaran, A., AlMarzouqi, A.H., & AlNuaimi, B.K. (2021). Measures of greenness: An empirical study in service supply chains in the UAE. International Journal of Production Economics, 241, Art. No. 108257.
Khorshidvand, B., Soleimani, H., Sibdari, S., & Mehdi Seyyed Esfahani, M. (2021). A hybrid modeling approach for green and sustainable closed-loop supply chain considering price, advertisement and uncertain demands. Computers and Industrial Engineering, 157, Art. No. 107326.
Mawandiya, B.K., Jha, J. K., & Thakkar, J. (2017). Production-inventory model for two-echelon closed-loop supply chain with finite manufacturing and remanufacturing rates. International Journal of Systems Science: Operations & Logistics, 4(3), 199-218.
Morita, T. (2010). Dynamic analysis of outsourcing. Journal of Economics, 100(2), 117-140.
Papachristos, S., & Konstantaras, I. (2006). Economic ordering quantity models for items with imperfect quality. International Journal of Production Economics, 100(1), 148-154.
Perarasi, T., Leeban Moses, M., & Raju, C. (2021). Energy optimization by green sensing methodology for channel design in a cognitive radio network. Journal of Applied Research and Technology, 19(2), 153-162.
Pichka, K., Alwan, L.C., & Yue, X. (2022). Fulfillment and pricing optimization for omni-channel retailers considering shipment of in-store demand. Transportation Research Part E: Logistics and Transportation Review, 167, Art. No. 102912.
Porto, A.F., Henao, C.A., Lusa, A., Polo Mejía, O., & Porto Solano, R. (2022). Solving a staffing problem with annualized hours, multiskilling with 2-chaining, and overtime: A retail industry case. Computers and Industrial Engineering, 167, Art. No. 107999.
Salehi, H., Taleizadeh, A.A., & Tavakkoli-Moghaddam, R. (2016). An EOQ model with random disruption and partial backordering. International Journal of Production Research, 54(9), 2600-2609.
Sarmah, S. P., Acharya, D., & Goyal, S. K. (2006). Buyer vendor coordination models in supply chain management. European journal of operational research, 175(1), 1-15.
Shekar, K.C., & Nataraj M. (2023). Subcontracting and enterprise development in India's informal manufacturing sector. Journal of Small Business and Enterprise Development, 30(3), 448 – 474.
Tseng, C-T., Wu, M-F., Lin, H-D., & Chiu, Y.S.P. (2014). Solving a vendor-buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach. Economic Modelling, 36, 30-36.
Yera, Y.G., Lillo, R.E., Nielsen, B.F., Ramírez-Cobo, P., Ruggeri, F. (2021). A bivariate two-state Markov modulated Poisson process for failure modeling. Reliability Engineering and System Safety, 208, Art. No. 107318.
Zhang, Q., Luo, J., & Duan, Y. (2016). Buyer–vendor coordination for fixed lifetime product with quantity discount under finite production rate. International Journal of Systems Science, 47(4), 821-834.