How to cite this paper
Chiu, Y., Lo, Y., Pai, F., Chiu, V & Chiu, S. (2024). Optimization of a hybrid multi-item fabricating-shipping integrated system considering scrap, adjustable-rate, and postponement.International Journal of Industrial Engineering Computations , 15(1), 89-104.
Refrences
Altug, M.S. (2016). Supply chain contracting for vertically differentiated products. International Journal of Production Economics, 171, 34-45.
Ameknassi, L., Aït-Kadi, D., & Rezg, N. (2016). Integration of logistics outsourcing decisions in a green supply chain design: A stochastic multi-objective multi-period multi-product programming model. International Journal of Production Economics, 182, 165-184.
Bernard, C., & Mitraille, S. (2023). Outsourcing horizontally differentiated tasks under asymmetric information. International Journal of Industrial Organization, 89, Art. No. 102971.
Bugatti, M., Semeraro, Q., & Colosimo, B.M. (2022). Effect of overhanging surfaces on the evolution of substrate topography and internal defects formation in laser powder bed fusion. Journal of Manufacturing Processes, 77, 588-606.
Chiu, Y.-S.P., You, L.-W., Chiu, T., & Pai, F.-Y. (2022a). The combined effect of rework, postponement, multiple shipments, and overtime producing common-component on a multiproduct vendor-client incorporated system. International Journal of Industrial Engineering Computations, 13(3), 329-342.
Chiu, Y.-S.P., Ke, C.-Y., Chiu, T., & Yeh, T.-M. (2022b). Optimizing an FPR-based supplier-retailer integrated problem with an outsourcer, rework, expedited rate, and probabilistic breakdown. International Journal of Industrial Engineering Computations, 13(4), 601-616
Chiu, S.W., Chiu, V., Hwang, M.-H., & Chiu, Y.-S.P. (2021). A delayed differentiation multiproduct model with the outsourcing of common parts, overtime strategy for end products, and quality reassurance. International Journal of Industrial Engineering Computations, 12(2), 143-158.
Ebben, M.J.R., Van Der Heijden, M.C., & Van Harten, A. (2005). Dynamic transport scheduling under multiple resource constraints. European Journal of Operational Research, 167(2), 320-335.
Eben-Chaime, M. (2004). The effect of discreteness in vendor-buyer relationships. IIE Transactions, 36(6), 583-589.
Eiamkanchanalai, S., & Banerjee, A. (1999) Production lot sizing with variable production rate and explicit idle capacity cost. International Journal of Production Economics, 59(1), 251-259.
Gambal, M.-J., Asatiani, A., & Kotlarsky, J. (2022). Strategic innovation through outsourcing – A theoretical review. Journal of Strategic Information Systems, 31(2), Art. No. 101718.
Ganjabi, M.A., Farrahi, G.H., Reza Kashyzadeh, K., & Amiri, N. (2023) Effects of various strength defects of spot weld on the connection strength under both static and cyclic loading conditions: empirical and numerical investigation. International Journal of Advanced Manufacturing Technology, 127(11-12), 5665 – 5678.
Geetha, K.V., & Prabha, M. (2022). Effective inventory management using postponement strategy with fuzzy cost. Journal of Management Analytics, 9(2), 232-260.
Glock, C.H., & Grosse, E.H. (2021). The impact of controllable production rates on the performance of inventory systems: A systematic review of the literature. European Journal of Operational Research, 288(3), 703-720.
Hinkka, V., Aminoff, A., Palmgren, R., Heikkilä, P., & Harlin, A. (2023) Investigating postponement and speculation approaches to the end-of-life textile supply chain. Journal of Cleaner Production, 422, Art. No. 138431.
Kandil, N., Hammami, R., & Battaïa, O. (2022). Insourcing versus outsourcing decision under environmental considerations and different contract arrangements. International Journal of Production Economics, 253, Art. No. 108589.
Karamemis, G., Zhang, J., & Chen, Y. (2023). Consignment and turnkey sourcing and outsourcing analysis for a three-player supply chain in various power dynamics. European Journal of Operational Research, 311(1), 125 – 138.
Kavčič, K., Gošnik, D., Beker, I., & Suklan, J. (2015). How does logistics outsourcing influence organisation performance? International Journal of Industrial Engineering and Management, 6(3), 101-107.
Kiani, M., Eksioglu, B., Isik, T., Thomas, A., & Gilpin, J. (2022). Evaluating appointment postponement in scheduling patients at a diagnostic clinic. Naval Research Logistics, 69(1), 76-91.
Kisperska-Moron, D., & Swierczek, A. (2011). The selected determinants of manufacturing postponement within supply chain context: An international study. International Journal of Production Economics, 133, 192-200.
Kumar, V., Holt, D., Ghobadian, A., & Garza-Reyes, J.A. (2015). Developing green supply chain management taxonomy-based decision support system. International Journal of Production Research, 53(21), 6372-6389.
Lin, H.-D., Chiu, V., Wu, H.-Y., & Chiu, Y.-S.P. (2022a). Multiproduct manufacturer-retailer coordinated supply chain with adjustable rate for common parts, delayed differentiation, and multi-shipment. Uncertain Supply Chain Management, 10(1), 83-94.
Martin, F., Hemmelmayr, V.C., & Wakolbinger, T. (2021). Integrated express shipment service network design with customer choice and endogenous delivery time restrictions. European Journal of Operational Research, 294 (2), 590-603.
Megoze Pongha P., Kibouka G.-R., Kenné J.-P., & Hof L.A. (2022). Production, maintenance and quality inspection planning of a hybrid manufacturing/remanufacturing system under production rate-dependent deterioration. International Journal of Advanced Manufacturing Technology, 121(1-2), 1289-1314.
Neves-Moreira, F., Almada-Lobo, B., Guimarães, L., & Amorim, P. (2022). The multi-product inventory-routing problem with pickups and deliveries: Mitigating fluctuating demand via rolling horizon heuristics. Transportation Research Part E: Logistics and Transportation Review, 164, Art. No. 102791.
Osei-Bryson, K.-M., & Ngwenyama, O.K. (2006). Managing risks in information systems outsourcing: An approach to analyzing outsourcing risks and structuring incentive contracts. European Journal of Operational Research, 174(1), 245-264.
Park, Y.-J., Pan, R., & Montgomery, D.C. (2023) A novel hybrid resampling for semiconductor wafer defect bin classification. Quality and Reliability Engineering International, 39(1), 67 – 80.
Nugroho, Y.K. (2013). Developing price and production postponement strategies of substitutable product. Journal of Modelling in Management, 8(2), 190-211.
Savsar M. (2008). Calculating production rate of a flexible manufacturing module. International Journal of Advanced Manufacturing Technology, 37(7-8), 760-769.
Scavarda, M., Seok, H., Puranik, A.S., & Nof, S.Y. (2015). Adaptive direct/indirect delivery decision protocol by collaborative negotiation among manufacturers, distributors, and retailers. International Journal of Production Economics, 167, 232-245.
Soto-Ferrari, M., Bhattacharyya, K., & Schikora, P. (2023) POST-BaLSTM: A Bagged LSTM forecasting ensemble embedded with a postponement framework to target the semiconductor shortage in the automotive industry. Computers and Industrial Engineering, 185, Art. No. 109602.
Taleizadeh, A.A., Niaki, S.T.A., & Najafi, A.A. (2010). Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint. Journal of Computational and Applied Mathematics, 223(8), 1834-1849.
Yang, B., Burns, N.D., & Backhouse, C.J. (2005) The application of postponement in industry. IEEE Transactions on Engineering Management, 52(2), 238-248.
Zehtabian, S., Larsen, C., Wøhlk, S. (2022). Estimation of the arrival time of deliveries by occasional drivers in a crowd-shipping setting. European Journal of Operational Research, 303(2), 616-632.
Ameknassi, L., Aït-Kadi, D., & Rezg, N. (2016). Integration of logistics outsourcing decisions in a green supply chain design: A stochastic multi-objective multi-period multi-product programming model. International Journal of Production Economics, 182, 165-184.
Bernard, C., & Mitraille, S. (2023). Outsourcing horizontally differentiated tasks under asymmetric information. International Journal of Industrial Organization, 89, Art. No. 102971.
Bugatti, M., Semeraro, Q., & Colosimo, B.M. (2022). Effect of overhanging surfaces on the evolution of substrate topography and internal defects formation in laser powder bed fusion. Journal of Manufacturing Processes, 77, 588-606.
Chiu, Y.-S.P., You, L.-W., Chiu, T., & Pai, F.-Y. (2022a). The combined effect of rework, postponement, multiple shipments, and overtime producing common-component on a multiproduct vendor-client incorporated system. International Journal of Industrial Engineering Computations, 13(3), 329-342.
Chiu, Y.-S.P., Ke, C.-Y., Chiu, T., & Yeh, T.-M. (2022b). Optimizing an FPR-based supplier-retailer integrated problem with an outsourcer, rework, expedited rate, and probabilistic breakdown. International Journal of Industrial Engineering Computations, 13(4), 601-616
Chiu, S.W., Chiu, V., Hwang, M.-H., & Chiu, Y.-S.P. (2021). A delayed differentiation multiproduct model with the outsourcing of common parts, overtime strategy for end products, and quality reassurance. International Journal of Industrial Engineering Computations, 12(2), 143-158.
Ebben, M.J.R., Van Der Heijden, M.C., & Van Harten, A. (2005). Dynamic transport scheduling under multiple resource constraints. European Journal of Operational Research, 167(2), 320-335.
Eben-Chaime, M. (2004). The effect of discreteness in vendor-buyer relationships. IIE Transactions, 36(6), 583-589.
Eiamkanchanalai, S., & Banerjee, A. (1999) Production lot sizing with variable production rate and explicit idle capacity cost. International Journal of Production Economics, 59(1), 251-259.
Gambal, M.-J., Asatiani, A., & Kotlarsky, J. (2022). Strategic innovation through outsourcing – A theoretical review. Journal of Strategic Information Systems, 31(2), Art. No. 101718.
Ganjabi, M.A., Farrahi, G.H., Reza Kashyzadeh, K., & Amiri, N. (2023) Effects of various strength defects of spot weld on the connection strength under both static and cyclic loading conditions: empirical and numerical investigation. International Journal of Advanced Manufacturing Technology, 127(11-12), 5665 – 5678.
Geetha, K.V., & Prabha, M. (2022). Effective inventory management using postponement strategy with fuzzy cost. Journal of Management Analytics, 9(2), 232-260.
Glock, C.H., & Grosse, E.H. (2021). The impact of controllable production rates on the performance of inventory systems: A systematic review of the literature. European Journal of Operational Research, 288(3), 703-720.
Hinkka, V., Aminoff, A., Palmgren, R., Heikkilä, P., & Harlin, A. (2023) Investigating postponement and speculation approaches to the end-of-life textile supply chain. Journal of Cleaner Production, 422, Art. No. 138431.
Kandil, N., Hammami, R., & Battaïa, O. (2022). Insourcing versus outsourcing decision under environmental considerations and different contract arrangements. International Journal of Production Economics, 253, Art. No. 108589.
Karamemis, G., Zhang, J., & Chen, Y. (2023). Consignment and turnkey sourcing and outsourcing analysis for a three-player supply chain in various power dynamics. European Journal of Operational Research, 311(1), 125 – 138.
Kavčič, K., Gošnik, D., Beker, I., & Suklan, J. (2015). How does logistics outsourcing influence organisation performance? International Journal of Industrial Engineering and Management, 6(3), 101-107.
Kiani, M., Eksioglu, B., Isik, T., Thomas, A., & Gilpin, J. (2022). Evaluating appointment postponement in scheduling patients at a diagnostic clinic. Naval Research Logistics, 69(1), 76-91.
Kisperska-Moron, D., & Swierczek, A. (2011). The selected determinants of manufacturing postponement within supply chain context: An international study. International Journal of Production Economics, 133, 192-200.
Kumar, V., Holt, D., Ghobadian, A., & Garza-Reyes, J.A. (2015). Developing green supply chain management taxonomy-based decision support system. International Journal of Production Research, 53(21), 6372-6389.
Lin, H.-D., Chiu, V., Wu, H.-Y., & Chiu, Y.-S.P. (2022a). Multiproduct manufacturer-retailer coordinated supply chain with adjustable rate for common parts, delayed differentiation, and multi-shipment. Uncertain Supply Chain Management, 10(1), 83-94.
Martin, F., Hemmelmayr, V.C., & Wakolbinger, T. (2021). Integrated express shipment service network design with customer choice and endogenous delivery time restrictions. European Journal of Operational Research, 294 (2), 590-603.
Megoze Pongha P., Kibouka G.-R., Kenné J.-P., & Hof L.A. (2022). Production, maintenance and quality inspection planning of a hybrid manufacturing/remanufacturing system under production rate-dependent deterioration. International Journal of Advanced Manufacturing Technology, 121(1-2), 1289-1314.
Neves-Moreira, F., Almada-Lobo, B., Guimarães, L., & Amorim, P. (2022). The multi-product inventory-routing problem with pickups and deliveries: Mitigating fluctuating demand via rolling horizon heuristics. Transportation Research Part E: Logistics and Transportation Review, 164, Art. No. 102791.
Osei-Bryson, K.-M., & Ngwenyama, O.K. (2006). Managing risks in information systems outsourcing: An approach to analyzing outsourcing risks and structuring incentive contracts. European Journal of Operational Research, 174(1), 245-264.
Park, Y.-J., Pan, R., & Montgomery, D.C. (2023) A novel hybrid resampling for semiconductor wafer defect bin classification. Quality and Reliability Engineering International, 39(1), 67 – 80.
Nugroho, Y.K. (2013). Developing price and production postponement strategies of substitutable product. Journal of Modelling in Management, 8(2), 190-211.
Savsar M. (2008). Calculating production rate of a flexible manufacturing module. International Journal of Advanced Manufacturing Technology, 37(7-8), 760-769.
Scavarda, M., Seok, H., Puranik, A.S., & Nof, S.Y. (2015). Adaptive direct/indirect delivery decision protocol by collaborative negotiation among manufacturers, distributors, and retailers. International Journal of Production Economics, 167, 232-245.
Soto-Ferrari, M., Bhattacharyya, K., & Schikora, P. (2023) POST-BaLSTM: A Bagged LSTM forecasting ensemble embedded with a postponement framework to target the semiconductor shortage in the automotive industry. Computers and Industrial Engineering, 185, Art. No. 109602.
Taleizadeh, A.A., Niaki, S.T.A., & Najafi, A.A. (2010). Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint. Journal of Computational and Applied Mathematics, 223(8), 1834-1849.
Yang, B., Burns, N.D., & Backhouse, C.J. (2005) The application of postponement in industry. IEEE Transactions on Engineering Management, 52(2), 238-248.
Zehtabian, S., Larsen, C., Wøhlk, S. (2022). Estimation of the arrival time of deliveries by occasional drivers in a crowd-shipping setting. European Journal of Operational Research, 303(2), 616-632.