How to cite this paper
Chiu, Y., Wang, Y., Yeh, T & Chiu, S. (2022). Fabrication runtime decision for a hybrid system incorporating probabilistic breakdowns, scrap, and overtime.International Journal of Industrial Engineering Computations , 13(3), 293-308.
Refrences
Abdul Halim, M., Paul, A., Mahmoud, M., Alshahrani, B., Alazzawi, A.Y.M., & Ismail, G.M. (2021). An overtime production inventory model for deteriorating items with nonlinear price and stock dependent demand. Alexandria Engineering Journal, 60(3), 2779-2786.
Astuty, W., Zufrizal, Pasaribu, F., & Rahayu, S. (2021). The effects of customer relationship management, human resource competence and internal control systems on the effectiveness of supply chain management in the Indonesian public sector. Uncertain Supply Chain Management, 9(3), 595-602.
Chiu, S.W., Chou, C-L., & Wu, W-K. (2013) Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown. Economic Modelling, 35, 330-337.
Chiu, Yuan-Shyi Peter, Jhan, J-H., Chiu, V., & Chou, C-L. (2020a) Incorporating outsourcing, stochastic failure, and scrap into batch fabrication planning. Alexandria Engineering Journal, 59(6), 5273-5284.
Chiu, S.W., Huang, Y-J., Chou, C-L., & Chiu, Y-S.P. (2020b) Manufacturing runtime problem with an expedited fabrication rate, random failures, and scrap. International Journal of Industrial Engineering Computations, 11(1), 35-50.
Chiu, S.W., Chiu, V., Hwang, M.-H., & Chiu, Y.-S.P. (2021). A delayed differentiation multiproduct model with the outsourcing of common parts, overtime strategy for end products, and quality reassurance. International Journal of Industrial Engineering Computations, 12(2), 143-158.
Choi, E.K. (2007). To outsource or not to outsource in an integrated world. International Review of Economics and Finance, 16(4), 521-527.
Conway, N., & Sturges, J. (2014). Investigating unpaid overtime working among the part-time workforce. British Journal of Management, 25(4), 755-771.
Daryanto, Y., & Christata, B.R. (2021). Optimal order quantity considering carbon emission costs, defective items, and partial backorder. Uncertain Supply Chain Management, 9(2), 307-316.
Dehayem Nodem, F.I., Kenne, J.-P., & Gharbi, A. (2011). Production planning and repair/replacement switching policy for deteriorating manufacturing systems. International Journal of Advanced Manufacturing Technology, 57(5-8), 827-840.
Grosfeld-Nir, A., & Gerchak, Y. (2002). Multistage production to order with rework capability. Management Science, 48(5), 652-664.
Khanna, A., Gautam, P., Hasan, A., & Jaggi, C.K. (2020). Inventory and pricing decisions for an imperfect production system with quality inspection, rework, and carbon-emissions. Yugoslav Journal of Operations Research, 30 (2), 337-358.
Lagodimos, A.G., & Mihiotis, A.N. (2010). Efficient overtime planning in packing shops with lines of identical manning. International Journal of Production Economics, 124(2), 453-462.
Larbi Rebaiaia, M., & Ait-kadi, D. (2021). Maintenance policies with minimal repair and replacement on failures: analysis and comparison. International Journal of Production Research, 59(23), 6995-7017.
Martorell, S., Ana Sanchez, S., & Serradell, V. (1999). Age dependent reliability model considering effects of maintenance and working conditions. Reliability Engineering and System Safety, 64(1), 19–31.
Moussawi-Haidar, L., Salameh, M., & Nasr, W. (2016). Production lot sizing with quality screening and rework. Applied Mathematical Modelling 40(4), 3242-3256.
Ouyang, L.-Y., Wu, K.-S., & Huang, C.-H. (2015). An integrated vendor–buyer inventory model with quality improvement and lead time reduction. International Journal of Production Economics, 108(1–2), 349-358.
Raut, R.D., Kharat, M.G., Kamble, S.S., Kamble, S.J., & Desai, R. (2018). Evaluation and selection of third-party logistics providers using an integrated multi-criteria decision making approach. International Journal of Services and Operations Management, 29(3), 373-392.
Shy, O, & Stenbacka, R. (2003). Strategic outsourcing. Journal of Economic Behavior & Organization, 50(2), 203-224.
Sumrit, D. (2020). Supplier selection for vendor-managed inventory in healthcare using fuzzy multi-criteria decision-making approach. Decision Science Letters, 9(2), 233-256.
Suroso, A.I., Tandra, H., Syaukat, Y., & Najib, M. (2021). The issue in Indonesian palm oil stock decision making: Sustainable and risk criteria. Decision Science Letters, 10(3), 241-246.
Terdpaopong, K., Puapradit, A., & Malisuwan, U. (2021). The effect of lean on the operational performance of medium-sized Thai manufacturing companies. Uncertain Supply Chain Management, 9(3), 647-658.
Van Mieghem, J.A. (1999). Coordinating investment, production and subcontracting. Management Science, 45, 954- 971.
Westphal, P., & Sohal, A. (2016). Outsourcing decision-making: does the process matter? Production Planning & Control, 27(11), 894-908.
Yeh, R.H., & Chen, T.-H. (2006). Optimal lot size and inspection policy for products sold with warranty. European Journal of Operational Research, 174(2), 766-776.
Yera, Y.G., Lillo, R.E., Nielsen, B.F., Ramírez-Cobo, P., & Ruggeri, F. (2021). A bivariate two-state Markov modulated Poisson process for failure modeling. Reliability Engineering and System Safety, 208, Art. No. 107318.
Astuty, W., Zufrizal, Pasaribu, F., & Rahayu, S. (2021). The effects of customer relationship management, human resource competence and internal control systems on the effectiveness of supply chain management in the Indonesian public sector. Uncertain Supply Chain Management, 9(3), 595-602.
Chiu, S.W., Chou, C-L., & Wu, W-K. (2013) Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown. Economic Modelling, 35, 330-337.
Chiu, Yuan-Shyi Peter, Jhan, J-H., Chiu, V., & Chou, C-L. (2020a) Incorporating outsourcing, stochastic failure, and scrap into batch fabrication planning. Alexandria Engineering Journal, 59(6), 5273-5284.
Chiu, S.W., Huang, Y-J., Chou, C-L., & Chiu, Y-S.P. (2020b) Manufacturing runtime problem with an expedited fabrication rate, random failures, and scrap. International Journal of Industrial Engineering Computations, 11(1), 35-50.
Chiu, S.W., Chiu, V., Hwang, M.-H., & Chiu, Y.-S.P. (2021). A delayed differentiation multiproduct model with the outsourcing of common parts, overtime strategy for end products, and quality reassurance. International Journal of Industrial Engineering Computations, 12(2), 143-158.
Choi, E.K. (2007). To outsource or not to outsource in an integrated world. International Review of Economics and Finance, 16(4), 521-527.
Conway, N., & Sturges, J. (2014). Investigating unpaid overtime working among the part-time workforce. British Journal of Management, 25(4), 755-771.
Daryanto, Y., & Christata, B.R. (2021). Optimal order quantity considering carbon emission costs, defective items, and partial backorder. Uncertain Supply Chain Management, 9(2), 307-316.
Dehayem Nodem, F.I., Kenne, J.-P., & Gharbi, A. (2011). Production planning and repair/replacement switching policy for deteriorating manufacturing systems. International Journal of Advanced Manufacturing Technology, 57(5-8), 827-840.
Grosfeld-Nir, A., & Gerchak, Y. (2002). Multistage production to order with rework capability. Management Science, 48(5), 652-664.
Khanna, A., Gautam, P., Hasan, A., & Jaggi, C.K. (2020). Inventory and pricing decisions for an imperfect production system with quality inspection, rework, and carbon-emissions. Yugoslav Journal of Operations Research, 30 (2), 337-358.
Lagodimos, A.G., & Mihiotis, A.N. (2010). Efficient overtime planning in packing shops with lines of identical manning. International Journal of Production Economics, 124(2), 453-462.
Larbi Rebaiaia, M., & Ait-kadi, D. (2021). Maintenance policies with minimal repair and replacement on failures: analysis and comparison. International Journal of Production Research, 59(23), 6995-7017.
Martorell, S., Ana Sanchez, S., & Serradell, V. (1999). Age dependent reliability model considering effects of maintenance and working conditions. Reliability Engineering and System Safety, 64(1), 19–31.
Moussawi-Haidar, L., Salameh, M., & Nasr, W. (2016). Production lot sizing with quality screening and rework. Applied Mathematical Modelling 40(4), 3242-3256.
Ouyang, L.-Y., Wu, K.-S., & Huang, C.-H. (2015). An integrated vendor–buyer inventory model with quality improvement and lead time reduction. International Journal of Production Economics, 108(1–2), 349-358.
Raut, R.D., Kharat, M.G., Kamble, S.S., Kamble, S.J., & Desai, R. (2018). Evaluation and selection of third-party logistics providers using an integrated multi-criteria decision making approach. International Journal of Services and Operations Management, 29(3), 373-392.
Shy, O, & Stenbacka, R. (2003). Strategic outsourcing. Journal of Economic Behavior & Organization, 50(2), 203-224.
Sumrit, D. (2020). Supplier selection for vendor-managed inventory in healthcare using fuzzy multi-criteria decision-making approach. Decision Science Letters, 9(2), 233-256.
Suroso, A.I., Tandra, H., Syaukat, Y., & Najib, M. (2021). The issue in Indonesian palm oil stock decision making: Sustainable and risk criteria. Decision Science Letters, 10(3), 241-246.
Terdpaopong, K., Puapradit, A., & Malisuwan, U. (2021). The effect of lean on the operational performance of medium-sized Thai manufacturing companies. Uncertain Supply Chain Management, 9(3), 647-658.
Van Mieghem, J.A. (1999). Coordinating investment, production and subcontracting. Management Science, 45, 954- 971.
Westphal, P., & Sohal, A. (2016). Outsourcing decision-making: does the process matter? Production Planning & Control, 27(11), 894-908.
Yeh, R.H., & Chen, T.-H. (2006). Optimal lot size and inspection policy for products sold with warranty. European Journal of Operational Research, 174(2), 766-776.
Yera, Y.G., Lillo, R.E., Nielsen, B.F., Ramírez-Cobo, P., & Ruggeri, F. (2021). A bivariate two-state Markov modulated Poisson process for failure modeling. Reliability Engineering and System Safety, 208, Art. No. 107318.