How to cite this paper
Chiu, S., Chiu, V., Hwang, M & Chiu, Y. (2021). A delayed differentiation multiproduct model with the outsourcing of common parts, overtime strategy for end products, and quality reassurance.International Journal of Industrial Engineering Computations , 12(2), 143-158.
Refrences
Akkermans, H., Van Oppen, W., Wynstra, F., & Voss, C. (2019). Contracting outsourced services with collaborative key performance indicators. Journal of Operations Management, 65(1), 22-47.
Aouam, T., & Kumar, K. (2019). On the effect of overtime and subcontracting on supply chain safety stocks. Omega, 89, 1-20.
Arun, P., Lincon, S.A., & Prabhakaran, N. (2019). An automated method for the analysis of bearing vibration based on spectrogram pattern matching. Journal of Applied Research and Technology, 17(2), 126-136.
Blecker, T., & Abdelkafi, N. (2006). Complexity and variety in mass customization systems: Analysis and recommendations. Management Decision, 44(7), 908-929.
Cerdá, J., Cafaro, V.G., Cafaro, D.C. (2020). Synchronizing Operations in Multiproduct Batch Facilities Producing Semifinished and Final Products. Industrial and Engineering Chemistry Research, 59 (29), 13113-13131.
Chakraborty, D., Jana, D.K., & Roy, T.K. (2020). Multi-warehouse partial backlogging inventory system with inflation for non-instantaneous deteriorating multi-item under imprecise environment. Soft Computing, 24(19), 14471-14490.
Chiu, Y-S.P., Chen, H-C., Chang, H-H., & Hwang, M-H. (2019a). Determining rotation cycle and distribution frequency for a vendor-buyer integrated multi-item system considering an external provider and rework. International Journal of Industrial Engineering Computations, 10(4), 505-520.
Chiu, Y-S.P., Chiu, V., Lin, H-D., & Chang, H-H. (2019b). Meeting multiproduct demand with a hybrid inventory replenishment system featuring quality reassurance. Operations Research Perspectives, 6, Art. No. 100112, 1-8.
Chiu, Y-S.P., Chiu, V., Wang, Y., & Hwang, M-H. (2020a). A postponement model for multi-item replenishment decision considering overtime, commonality, and quality reassurance. International Journal of Industrial Engineering Computations, 11(4), 509-524.
Chiu, Y.-S.P., Zhao, Z.-Y., Chiu, S.W., & Chiu, V. (2020b). A vendor-buyer coordinated system featuring an unreliable machine, scrap, outsourcing, and multiple shipments. International Journal of Industrial Engineering Computations, 11(3), 341-358.
Chiu, Y-S.P., Sung, P-C., & Chiu, V. (2020c) A two-phase solution approach for a manufacturing- distribution problem with rework, outsourcing, and multi-shipment policy. Journal of Applied Engineering Science, 18(4), 505-509.
Chiu, Y-S.P., Chang, H-H., Chiu, T., & Chiu, S.W. (2021). A multi-item batch fabrication problem featuring delayed product differentiation, outsourcing, and quality assurance. International Journal of Industrial Engineering Computations, 12(1), 64-78.
Dellaer, N.P., & Melo, M.T. (1998). Make-to-order policies for a stochastic lot-sizing problem using overtime. International Journal of Production Economics, 56–57, 79-97.
Hamers, H., Klijn, F., & Slikker, M. (2019). Implementation of optimal schedules in outsourcing with identical suppliers. Mathematical Methods of Operations Research, 89(2), 173-187.
Jabbarzadeh, A., Haughton, M., & Pourmehdi, F. (2019). A robust optimization model for efficient and green supply chain planning with postponement strategy. International Journal of Production Economics, 214, 266-283.
Jaramillo, F., & Erkoc, M. (2017). Minimizing total weighted tardiness and overtime costs for single machine preemptive scheduling. Computers and Industrial Engineering, 107, 109-119.
Jha, K.K., Thakkar, J.J., &Thanki, S.J. (2020). Cycle time reduction in outsourcing process: case of an Indian aerospace industry. International Journal of Advanced Manufacturing Technology, 106(9-10), 4355-4373.
Jimmy, J., Roesyadi, A., Suprapto, S., Kurniawansyah, F., Anggraini, W., & Rahmawati, R. (2020). Activated carbon from bamboo waste: Effect of activation sequences and iron-cobalt impregnation to material properties and catalyst performance. Journal of Applied Engineering Science, 18(1), 1-9.
Jirjahn, U. (2008). On the determinants of shift work and overtime work: Evidence from German establishment data. British Journal of Industrial Relations, 46(1), 133-168.
Kamien, M.I., Li, L., & Samet, D. (1989). Bertrand competition with subcontracting. RAND Journal of Economics, 20, 553-567.
Kenyon, G.N., Meixell, M.J., & Westfall, P.H. (2016). Production outsourcing and operational performance: An empirical study using secondary data. International Journal of Production Economics, 171(3), 336-349.
Kikuchi, H., Odagiri, Y., Ohya, Y., Nakanishi, Y., Shimomitsu, T., Theorell, T., & Inoue, S. (2020). Association of overtime work hours with various stress responses in 59,021 Japanese workers: Retrospective cross-sectional study. PLoS ONE, 15(3), Art. No. e0229506.
Kim, J.-S., Shin, K.-C., & Park, S.-K. (2000). An optimal algorithm for repairable-item inventory system with depot spares. Journal of the Operational Research Society, 51(3), 350-357.
Larkin, E.V., & Privalov, A.N. (2019). Engineering method of fault -tolerant system simulations. Journal of Applied Engineering Science, 17(3), 295-303.
Lin, H-D., Chen, Y-R., Chiu, V., & Chiu, Y-S.P. (2019). A decision model for a quality-assured EPQ-based intra-supply chain system considering overtime option. Journal of Applied Engineering Science 17(3), 362-371.
Mabude, K., Malela-Majika, J.-C., & Shongwe, S.C. (2020). A new distribution-free generally weighted moving average monitoring scheme for detecting unknown shifts in the process location. International Journal of Industrial Engineering Computations, 11(2), 235-254.
Mojeed, H.A., Bajeh, A.O., Balogun, A.O., & Adeleke, H.O. (2019). Memetic approach for multi-objective overtime planning in software engineering projects. Journal of Engineering Science and Technology, 14(6), 3213-3233.
Nahmias, S. (2009). Production & Operations Analysis. McGraw-Hill Inc. New York.
Nachiappan, S.P., Jawahar, N., & Kumar, N.K. (2008). Operating parameters for a single-vendor multiple-buyers Vendor Managed Inventory System with Outsourcing. International Journal of Operational Research, 3(3), 336-361.
Ouaddi, K., Mhada, F.-Z., & Benadada, Y. (2020). Memetic algorithm for multi-tours dynamic vehicle routing problem with overtime (Mdvrpot). International Journal of Industrial Engineering Computations, 11(4), 643-662.
Roy, A., Maity, K., Kar, S., & Maiti, M. (2009). A production–inventory model with remanufacturing for defective and usable items in fuzzy-environment. Computers & Industrial Engineering, 56(1), 87-96.
Seth, D., & Panigrahi, A. (2015). Application and evaluation of packaging postponement strategy to boost supply chain responsiveness: A case study. Production Planning and Control, 26, 1069-1089.
Sonntag, D., & Kiesmüller, G.P. (2018). Disposal versus rework – Inventory control in a production system with random yield. European Journal of Operational Research, 267(1), 138-149.
Uniyal, N., Pant, S., & Kumar, A. (2020). An overview of few nature inspired optimization techniques and its reliability applications. International Journal of Mathematical, Engineering and Management Sciences, 5(4), 732-743.
Van Hoek, R.I. (1999). Postponement and the reconfiguration challenge for food supply chains. Supply Chain Management, 4(1), 18-34.
Van Mieghem, J.A. (1999). Coordinating investment, production and subcontracting. Management Science, 45, 954-971.
Aouam, T., & Kumar, K. (2019). On the effect of overtime and subcontracting on supply chain safety stocks. Omega, 89, 1-20.
Arun, P., Lincon, S.A., & Prabhakaran, N. (2019). An automated method for the analysis of bearing vibration based on spectrogram pattern matching. Journal of Applied Research and Technology, 17(2), 126-136.
Blecker, T., & Abdelkafi, N. (2006). Complexity and variety in mass customization systems: Analysis and recommendations. Management Decision, 44(7), 908-929.
Cerdá, J., Cafaro, V.G., Cafaro, D.C. (2020). Synchronizing Operations in Multiproduct Batch Facilities Producing Semifinished and Final Products. Industrial and Engineering Chemistry Research, 59 (29), 13113-13131.
Chakraborty, D., Jana, D.K., & Roy, T.K. (2020). Multi-warehouse partial backlogging inventory system with inflation for non-instantaneous deteriorating multi-item under imprecise environment. Soft Computing, 24(19), 14471-14490.
Chiu, Y-S.P., Chen, H-C., Chang, H-H., & Hwang, M-H. (2019a). Determining rotation cycle and distribution frequency for a vendor-buyer integrated multi-item system considering an external provider and rework. International Journal of Industrial Engineering Computations, 10(4), 505-520.
Chiu, Y-S.P., Chiu, V., Lin, H-D., & Chang, H-H. (2019b). Meeting multiproduct demand with a hybrid inventory replenishment system featuring quality reassurance. Operations Research Perspectives, 6, Art. No. 100112, 1-8.
Chiu, Y-S.P., Chiu, V., Wang, Y., & Hwang, M-H. (2020a). A postponement model for multi-item replenishment decision considering overtime, commonality, and quality reassurance. International Journal of Industrial Engineering Computations, 11(4), 509-524.
Chiu, Y.-S.P., Zhao, Z.-Y., Chiu, S.W., & Chiu, V. (2020b). A vendor-buyer coordinated system featuring an unreliable machine, scrap, outsourcing, and multiple shipments. International Journal of Industrial Engineering Computations, 11(3), 341-358.
Chiu, Y-S.P., Sung, P-C., & Chiu, V. (2020c) A two-phase solution approach for a manufacturing- distribution problem with rework, outsourcing, and multi-shipment policy. Journal of Applied Engineering Science, 18(4), 505-509.
Chiu, Y-S.P., Chang, H-H., Chiu, T., & Chiu, S.W. (2021). A multi-item batch fabrication problem featuring delayed product differentiation, outsourcing, and quality assurance. International Journal of Industrial Engineering Computations, 12(1), 64-78.
Dellaer, N.P., & Melo, M.T. (1998). Make-to-order policies for a stochastic lot-sizing problem using overtime. International Journal of Production Economics, 56–57, 79-97.
Hamers, H., Klijn, F., & Slikker, M. (2019). Implementation of optimal schedules in outsourcing with identical suppliers. Mathematical Methods of Operations Research, 89(2), 173-187.
Jabbarzadeh, A., Haughton, M., & Pourmehdi, F. (2019). A robust optimization model for efficient and green supply chain planning with postponement strategy. International Journal of Production Economics, 214, 266-283.
Jaramillo, F., & Erkoc, M. (2017). Minimizing total weighted tardiness and overtime costs for single machine preemptive scheduling. Computers and Industrial Engineering, 107, 109-119.
Jha, K.K., Thakkar, J.J., &Thanki, S.J. (2020). Cycle time reduction in outsourcing process: case of an Indian aerospace industry. International Journal of Advanced Manufacturing Technology, 106(9-10), 4355-4373.
Jimmy, J., Roesyadi, A., Suprapto, S., Kurniawansyah, F., Anggraini, W., & Rahmawati, R. (2020). Activated carbon from bamboo waste: Effect of activation sequences and iron-cobalt impregnation to material properties and catalyst performance. Journal of Applied Engineering Science, 18(1), 1-9.
Jirjahn, U. (2008). On the determinants of shift work and overtime work: Evidence from German establishment data. British Journal of Industrial Relations, 46(1), 133-168.
Kamien, M.I., Li, L., & Samet, D. (1989). Bertrand competition with subcontracting. RAND Journal of Economics, 20, 553-567.
Kenyon, G.N., Meixell, M.J., & Westfall, P.H. (2016). Production outsourcing and operational performance: An empirical study using secondary data. International Journal of Production Economics, 171(3), 336-349.
Kikuchi, H., Odagiri, Y., Ohya, Y., Nakanishi, Y., Shimomitsu, T., Theorell, T., & Inoue, S. (2020). Association of overtime work hours with various stress responses in 59,021 Japanese workers: Retrospective cross-sectional study. PLoS ONE, 15(3), Art. No. e0229506.
Kim, J.-S., Shin, K.-C., & Park, S.-K. (2000). An optimal algorithm for repairable-item inventory system with depot spares. Journal of the Operational Research Society, 51(3), 350-357.
Larkin, E.V., & Privalov, A.N. (2019). Engineering method of fault -tolerant system simulations. Journal of Applied Engineering Science, 17(3), 295-303.
Lin, H-D., Chen, Y-R., Chiu, V., & Chiu, Y-S.P. (2019). A decision model for a quality-assured EPQ-based intra-supply chain system considering overtime option. Journal of Applied Engineering Science 17(3), 362-371.
Mabude, K., Malela-Majika, J.-C., & Shongwe, S.C. (2020). A new distribution-free generally weighted moving average monitoring scheme for detecting unknown shifts in the process location. International Journal of Industrial Engineering Computations, 11(2), 235-254.
Mojeed, H.A., Bajeh, A.O., Balogun, A.O., & Adeleke, H.O. (2019). Memetic approach for multi-objective overtime planning in software engineering projects. Journal of Engineering Science and Technology, 14(6), 3213-3233.
Nahmias, S. (2009). Production & Operations Analysis. McGraw-Hill Inc. New York.
Nachiappan, S.P., Jawahar, N., & Kumar, N.K. (2008). Operating parameters for a single-vendor multiple-buyers Vendor Managed Inventory System with Outsourcing. International Journal of Operational Research, 3(3), 336-361.
Ouaddi, K., Mhada, F.-Z., & Benadada, Y. (2020). Memetic algorithm for multi-tours dynamic vehicle routing problem with overtime (Mdvrpot). International Journal of Industrial Engineering Computations, 11(4), 643-662.
Roy, A., Maity, K., Kar, S., & Maiti, M. (2009). A production–inventory model with remanufacturing for defective and usable items in fuzzy-environment. Computers & Industrial Engineering, 56(1), 87-96.
Seth, D., & Panigrahi, A. (2015). Application and evaluation of packaging postponement strategy to boost supply chain responsiveness: A case study. Production Planning and Control, 26, 1069-1089.
Sonntag, D., & Kiesmüller, G.P. (2018). Disposal versus rework – Inventory control in a production system with random yield. European Journal of Operational Research, 267(1), 138-149.
Uniyal, N., Pant, S., & Kumar, A. (2020). An overview of few nature inspired optimization techniques and its reliability applications. International Journal of Mathematical, Engineering and Management Sciences, 5(4), 732-743.
Van Hoek, R.I. (1999). Postponement and the reconfiguration challenge for food supply chains. Supply Chain Management, 4(1), 18-34.
Van Mieghem, J.A. (1999). Coordinating investment, production and subcontracting. Management Science, 45, 954-971.