How to cite this paper
Chiu, Y., You, L., Chiu, T & Pai, F. (2022). The combined effect of rework, postponement, multiple shipments, and overtime producing common-component on a multiproduct vendor-client incorporated system.International Journal of Industrial Engineering Computations , 13(3), 329-342.
Refrences
Abukhader, K.M.S., & Onbaşıoğlu, D.Ç. (2021). The effects of total quality management practices on employee performance and the effect of training as a moderating variable. Uncertain Supply Chain Management, 9(3), 521-528.
Assia, S., Ikram, E.A., Abdellah, E.B., Moumen, D., & Ahmed, E.B. (2020). A genetic algorithm and B&B algorithm for integrated production scheduling, preventive and corrective maintenance to save energy. Management and Production Engineering Review, 11(4), 138-148.
Chiu, Y-S.P., Kuo, J-S., Chiu, S.W., & Hsieh, Y-T. (2016). Effect of delayed differentiation on a multi–product vendor–buyer integrated inventory system with rework. Advances in Production Engineering & Management, 11(4), 333-344.
Chiu, S.W., You, L.-W., Sung, P.-C., & Wang, Y. (2020). Determining the fabrication runtime for a buyer-vendor system with stochastic breakdown, accelerated rate, repairable items, and multi-delivery strategy. International Journal of Industrial Engineering Computations, 11(4), pp. 491-508.
Conway, N., & Sturges, J. (2014). Investigating unpaid overtime working among the part-time workforce. British Journal of Management, 25(4), 755-771.
Eskandari, H., & Hosseinzadeh, A. (2014). A variable neighbourhood search for hybrid flow-shop scheduling problem with rework and set-up times. Journal of the Operational Research Society, 65(8), 1221-1231.
Farmand, N., Zarei, H., & Rasti-Barzoki, M. (2021). Two meta-heuristic algorithms for optimizing a multi-objective supply chain scheduling problem in an identical parallel machines environment. International Journal of Industrial Engineering Computations, 12(3), 249-272.
Goldenhar, L.M., Hecker, S., Moir, S., & Rosecrance, J. (2003) The "goldilocks model" of overtime in construction: Not too much, not too little, but just right. Journal of Safety Research, 34(2), 215-226.
Gualandris, J., & Kalchschmidt, M. (2015). Mitigating the effect of risk conditions on supply disruptions: The role of manufacturing postponement enablers. Production Planning and Control, 26(8), 637-653.
Ivanov, V., Dehtiarov, I., Pavlenko, I., Kosov, I., & Kosov, M. (2019) Technology for complex parts machining in multiproduct manufacturing. Management and Production Engineering Review, 10(2), 25-36.
Karakaya, S., Savasaneril, S., & Serin, Y. (2021). Pricing with delivery time information sharing decisions in service systems. Computers and Industrial Engineering, 159, Art. No. 107459.
Keyvanshokooh, E., Shi, C., & van Oyen, M.P. (2021). Online advance scheduling with overtime: A primal-dual approach. Manufacturing and Service Operations Management, 23(1), 246-266.
Khan, M., Jaber, M.Y., & Ahmad, A.-R. (2014) An integrated supply chain model with errors in quality inspection and learning in production. Omega, 42(1), 16-24.
Lambooij, M., Flache, A., Sanders, K., & Siegers, J. (2007). Encouraging employees to co-operate: The effects of sponsored training and promotion practices on employees' willingness to work overtime. International Journal of Human Resource Management, 18(10), 1748-1767.
Mabrouk, N.B. (2020). Green supplier selection using fuzzy Delphi method for developing sustainable supply chain. Decision Science Letters, 10(1), 63-70.
Madeira, J. (2014) Overtime labor, employment frictions, and the New Keynesian phillips curve. Review of Economics and Statistics, 96(4), 767-778.
Mauri, G.R., Biajoli, F.L., Rabello, R.L., Chaves, A.A., Ribeiro, G.M., & Lorena, L.A.N. (2021). Hybrid metaheuristics to solve a multiproduct two-stage capacitated facility location problem. International Transactions in Operational Research, 28(6), 3069-3093.
Ponte, B., Cannella, S., Dominguez, R., Naim, M.M., & Syntetos, A.A. (2021). Quality grading of returns and the dynamics of remanufacturing. International Journal of Production Economics, 236, Art. No. 108129.
Qrunfleh, S., & Tarafdar, M. (2013). Lean and agile supply chain strategies and supply chain responsiveness: The role of strategic supplier partnership and postponement. Supply Chain Management, 18(6), 571-582.
Rardin, R.L. (1998). Optimization in Operations Research. Prentice-Hall; New Jersey, USA.
Raviv, T. (2013). An efficient algorithm for maximizing the expected profit from a serial production line with inspection stations and rework. OR Spectrum, 35(3), 609-638.
Ren, Y., Dessouky, M., & Ordóñez, F. (2010) The multi-shift vehicle routing problem with overtime. Computers and Operations Research, 37 (11), 1987-1998.
Sahebi, I.G., Masoomi, B., Ghorbani, S., & Uslu, T. (2019). Scenario-based designing of closed-loop supply chain with uncertainty in returned products. Decision Science Letters, 8(4), 505-518.
Sazvar, Z., Tafakkori, K., Oladzad, N., & Nayeri, S. (2021). A capacity planning approach for sustainable-resilient supply chain network design under uncertainty: A case study of vaccine supply chain. Computers and Industrial Engineering, 159, Art. No. 107406.
Son, N.H., & Van Hop, N. (2021). A hybrid meta-heuristics approach for supplier selection and order allocation problem for supplying risks of recyclable raw materials. International Journal of Industrial Engineering Computations, 12(2), 177-190.
Soriano, J., Jalao, E.R., & Martinez, I.A. (2020). Integrated employee scheduling with known employee demand, including breaks, overtime, and employee preferences. Journal of Industrial Engineering and Management, 13(3), 451-463.
Sumrit, D. (2020). Supplier selection for vendor-managed inventory in healthcare using fuzzy multi-criteria decision-making approach. Decision Science Letters, 9(2), 233-256.
Sztorc, M., & Savenkovs, K. (2020) The use of lean management instruments to shape business models of service companies. Management and Production Engineering Review, 11(3), 128-140.
Tran, M.D., Phan, T.T.H., Ha, H.H., Hoang, T.T.H. (2020). The impact of supply chain quality integration on green supply chain management and environmental performance in Vietnam’s tourism industries. Uncertain Supply Chain Management, 8(4), 693-704.
Van Mieghem, J.A. (2004) Note - Commonality Strategies: Value Drivers and Equivalence with Flexible Capacity and Inventory Substitution, Management Science, 50 (3), 419-424.
Wadhwa, S., Bhoon, K.S., & Chan, F.T.S. (2006) Postponement strategies through business process redesign in automotive manufacturing: Knowledge innovation. Industrial Management and Data Systems, 106(3), 307-326.
Assia, S., Ikram, E.A., Abdellah, E.B., Moumen, D., & Ahmed, E.B. (2020). A genetic algorithm and B&B algorithm for integrated production scheduling, preventive and corrective maintenance to save energy. Management and Production Engineering Review, 11(4), 138-148.
Chiu, Y-S.P., Kuo, J-S., Chiu, S.W., & Hsieh, Y-T. (2016). Effect of delayed differentiation on a multi–product vendor–buyer integrated inventory system with rework. Advances in Production Engineering & Management, 11(4), 333-344.
Chiu, S.W., You, L.-W., Sung, P.-C., & Wang, Y. (2020). Determining the fabrication runtime for a buyer-vendor system with stochastic breakdown, accelerated rate, repairable items, and multi-delivery strategy. International Journal of Industrial Engineering Computations, 11(4), pp. 491-508.
Conway, N., & Sturges, J. (2014). Investigating unpaid overtime working among the part-time workforce. British Journal of Management, 25(4), 755-771.
Eskandari, H., & Hosseinzadeh, A. (2014). A variable neighbourhood search for hybrid flow-shop scheduling problem with rework and set-up times. Journal of the Operational Research Society, 65(8), 1221-1231.
Farmand, N., Zarei, H., & Rasti-Barzoki, M. (2021). Two meta-heuristic algorithms for optimizing a multi-objective supply chain scheduling problem in an identical parallel machines environment. International Journal of Industrial Engineering Computations, 12(3), 249-272.
Goldenhar, L.M., Hecker, S., Moir, S., & Rosecrance, J. (2003) The "goldilocks model" of overtime in construction: Not too much, not too little, but just right. Journal of Safety Research, 34(2), 215-226.
Gualandris, J., & Kalchschmidt, M. (2015). Mitigating the effect of risk conditions on supply disruptions: The role of manufacturing postponement enablers. Production Planning and Control, 26(8), 637-653.
Ivanov, V., Dehtiarov, I., Pavlenko, I., Kosov, I., & Kosov, M. (2019) Technology for complex parts machining in multiproduct manufacturing. Management and Production Engineering Review, 10(2), 25-36.
Karakaya, S., Savasaneril, S., & Serin, Y. (2021). Pricing with delivery time information sharing decisions in service systems. Computers and Industrial Engineering, 159, Art. No. 107459.
Keyvanshokooh, E., Shi, C., & van Oyen, M.P. (2021). Online advance scheduling with overtime: A primal-dual approach. Manufacturing and Service Operations Management, 23(1), 246-266.
Khan, M., Jaber, M.Y., & Ahmad, A.-R. (2014) An integrated supply chain model with errors in quality inspection and learning in production. Omega, 42(1), 16-24.
Lambooij, M., Flache, A., Sanders, K., & Siegers, J. (2007). Encouraging employees to co-operate: The effects of sponsored training and promotion practices on employees' willingness to work overtime. International Journal of Human Resource Management, 18(10), 1748-1767.
Mabrouk, N.B. (2020). Green supplier selection using fuzzy Delphi method for developing sustainable supply chain. Decision Science Letters, 10(1), 63-70.
Madeira, J. (2014) Overtime labor, employment frictions, and the New Keynesian phillips curve. Review of Economics and Statistics, 96(4), 767-778.
Mauri, G.R., Biajoli, F.L., Rabello, R.L., Chaves, A.A., Ribeiro, G.M., & Lorena, L.A.N. (2021). Hybrid metaheuristics to solve a multiproduct two-stage capacitated facility location problem. International Transactions in Operational Research, 28(6), 3069-3093.
Ponte, B., Cannella, S., Dominguez, R., Naim, M.M., & Syntetos, A.A. (2021). Quality grading of returns and the dynamics of remanufacturing. International Journal of Production Economics, 236, Art. No. 108129.
Qrunfleh, S., & Tarafdar, M. (2013). Lean and agile supply chain strategies and supply chain responsiveness: The role of strategic supplier partnership and postponement. Supply Chain Management, 18(6), 571-582.
Rardin, R.L. (1998). Optimization in Operations Research. Prentice-Hall; New Jersey, USA.
Raviv, T. (2013). An efficient algorithm for maximizing the expected profit from a serial production line with inspection stations and rework. OR Spectrum, 35(3), 609-638.
Ren, Y., Dessouky, M., & Ordóñez, F. (2010) The multi-shift vehicle routing problem with overtime. Computers and Operations Research, 37 (11), 1987-1998.
Sahebi, I.G., Masoomi, B., Ghorbani, S., & Uslu, T. (2019). Scenario-based designing of closed-loop supply chain with uncertainty in returned products. Decision Science Letters, 8(4), 505-518.
Sazvar, Z., Tafakkori, K., Oladzad, N., & Nayeri, S. (2021). A capacity planning approach for sustainable-resilient supply chain network design under uncertainty: A case study of vaccine supply chain. Computers and Industrial Engineering, 159, Art. No. 107406.
Son, N.H., & Van Hop, N. (2021). A hybrid meta-heuristics approach for supplier selection and order allocation problem for supplying risks of recyclable raw materials. International Journal of Industrial Engineering Computations, 12(2), 177-190.
Soriano, J., Jalao, E.R., & Martinez, I.A. (2020). Integrated employee scheduling with known employee demand, including breaks, overtime, and employee preferences. Journal of Industrial Engineering and Management, 13(3), 451-463.
Sumrit, D. (2020). Supplier selection for vendor-managed inventory in healthcare using fuzzy multi-criteria decision-making approach. Decision Science Letters, 9(2), 233-256.
Sztorc, M., & Savenkovs, K. (2020) The use of lean management instruments to shape business models of service companies. Management and Production Engineering Review, 11(3), 128-140.
Tran, M.D., Phan, T.T.H., Ha, H.H., Hoang, T.T.H. (2020). The impact of supply chain quality integration on green supply chain management and environmental performance in Vietnam’s tourism industries. Uncertain Supply Chain Management, 8(4), 693-704.
Van Mieghem, J.A. (2004) Note - Commonality Strategies: Value Drivers and Equivalence with Flexible Capacity and Inventory Substitution, Management Science, 50 (3), 419-424.
Wadhwa, S., Bhoon, K.S., & Chan, F.T.S. (2006) Postponement strategies through business process redesign in automotive manufacturing: Knowledge innovation. Industrial Management and Data Systems, 106(3), 307-326.