How to cite this paper
Zahedi, Z., Samadhi, T., Suprayogi, S & Halim, A. (2016). Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint.International Journal of Industrial Engineering Computations , 7(2), 229-244.
Refrences
Barlow, R.E., & Prochan, P. (1965). Mathematical theory of reliability. John Wiley, New York.
Ben-Daya, M., & Noman, S. A. (2006). Lot sizing, preventive maintenance, and warranty decisions for imperfect production systems. Journal of Quality in Maintenance Engineering, 12(1), 68-80.
Chelbi, A., Rezg, N., & Radhoui, M. (2008). Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system. Journal of Quality in Maintenance Engineering, 14(2), 161-176.
Dobson, G., Karmarkar, U. S., & Rummel, J. L. (1987). Batching to minimize flow times on one machine. Management Science, 33(6), 784-799.
Dobson, G., Karmarkar, U. S., & Rummel, J. L. (1989). Batching to minimize flow times on parallel heterogeneous machines. Management Science, 35(5), 607-613.
Ebeling, C. E. (2004). An introduction to reliability and maintainability engineering. Tata McGraw-Hill Education.
El-Ferik, S., & Ben-Daya, M. (2010). Integrated production maintenance model under imperfect age-based maintenance policy and non-negligible maintenance times. Asia-Pacific Journal of Operational Research, 27(04), 539-558.
Fitouhi, M. C., & Nourelfath, M. (2012). Integrating noncyclical preventive maintenance scheduling and production planning for a single machine.International Journal of Production Economics, 136(2), 344-351.
Halim, A. H., & Ohta, H. (1993). Batch-scheduling problems through flow shop with both receiving and delivery just in time. International Journal of Production Research, 31, 1943-1955.
Halim, A. H., & Ohta, H. (1994). Batch-scheduling problems to minimize inventory cost in the shop with both receiving and delivery just-in-times.International Journal of Production Economics, 33(1), 185-194.
Hou, K. L., & Lin, L. C. (2005). EMQ model with maintenance actions for deteriorating production system. Information and Management Sciences, 16, 53-65.
Lee, H. L., & Rosenblatt, M. J. (1987). Simultaneous determination of production cycle and inspection schedules in a production system.Management science, 33(9), 1125-1136.
Rigdon, S. E., & Basu, A. P. (2000). Statistical methods for the reliability of repairable systems (pp. 116-118). New York: Wiley.
Suliman, S. M., & Jawad, S. H. (2012). Optimization of preventive maintenance schedule and production lot size. International Journal of Production Economics, 137(1), 19-28.
Sherwin, D. J., & Bossche, A. (2012). The reliability, availability and productiveness of systems. Springer Science & Business Media.
Tseng, S. T. (1996). Optimal preventive maintenance policy for deteriorating production systems. IIE transactions, 28(8), 687-694.
Wang, C. H., & Sheu, S. H. (2001). Simultaneous determination of the optimal production–inventory and product inspection policies for a deteriorating production system. Computers & Operations Research, 28(11), 1093-1110.
Winston, W. L., & Goldberg, J. B. (2004). Operations research: applications and algorithms (Vol. 3). Boston: Duxbury press.
Yusriski, R., Sukoyo, S., Samadhi, T., & Halim, A. (2015). Integer batch scheduling problems for a single-machine with simultaneous effect of learning and forgetting to minimize total actual flow time. International Journal of Industrial Engineering Computations, 6(3), 365-378.
Zahedi, Z., Samadhi, T.M.A., Suprayogi, S., & Halim, A.H. (2014). Integrating batch production and maintenance scheduling on a deteriorating machine to minimize production and maintenance costs in just in time environment. Proceedings 15th Asia Pacific Industrial Engineering and Management System (APIEMS), 12-15 October, Jeju, South Korea, 2061-2069.
Ben-Daya, M., & Noman, S. A. (2006). Lot sizing, preventive maintenance, and warranty decisions for imperfect production systems. Journal of Quality in Maintenance Engineering, 12(1), 68-80.
Chelbi, A., Rezg, N., & Radhoui, M. (2008). Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system. Journal of Quality in Maintenance Engineering, 14(2), 161-176.
Dobson, G., Karmarkar, U. S., & Rummel, J. L. (1987). Batching to minimize flow times on one machine. Management Science, 33(6), 784-799.
Dobson, G., Karmarkar, U. S., & Rummel, J. L. (1989). Batching to minimize flow times on parallel heterogeneous machines. Management Science, 35(5), 607-613.
Ebeling, C. E. (2004). An introduction to reliability and maintainability engineering. Tata McGraw-Hill Education.
El-Ferik, S., & Ben-Daya, M. (2010). Integrated production maintenance model under imperfect age-based maintenance policy and non-negligible maintenance times. Asia-Pacific Journal of Operational Research, 27(04), 539-558.
Fitouhi, M. C., & Nourelfath, M. (2012). Integrating noncyclical preventive maintenance scheduling and production planning for a single machine.International Journal of Production Economics, 136(2), 344-351.
Halim, A. H., & Ohta, H. (1993). Batch-scheduling problems through flow shop with both receiving and delivery just in time. International Journal of Production Research, 31, 1943-1955.
Halim, A. H., & Ohta, H. (1994). Batch-scheduling problems to minimize inventory cost in the shop with both receiving and delivery just-in-times.International Journal of Production Economics, 33(1), 185-194.
Hou, K. L., & Lin, L. C. (2005). EMQ model with maintenance actions for deteriorating production system. Information and Management Sciences, 16, 53-65.
Lee, H. L., & Rosenblatt, M. J. (1987). Simultaneous determination of production cycle and inspection schedules in a production system.Management science, 33(9), 1125-1136.
Rigdon, S. E., & Basu, A. P. (2000). Statistical methods for the reliability of repairable systems (pp. 116-118). New York: Wiley.
Suliman, S. M., & Jawad, S. H. (2012). Optimization of preventive maintenance schedule and production lot size. International Journal of Production Economics, 137(1), 19-28.
Sherwin, D. J., & Bossche, A. (2012). The reliability, availability and productiveness of systems. Springer Science & Business Media.
Tseng, S. T. (1996). Optimal preventive maintenance policy for deteriorating production systems. IIE transactions, 28(8), 687-694.
Wang, C. H., & Sheu, S. H. (2001). Simultaneous determination of the optimal production–inventory and product inspection policies for a deteriorating production system. Computers & Operations Research, 28(11), 1093-1110.
Winston, W. L., & Goldberg, J. B. (2004). Operations research: applications and algorithms (Vol. 3). Boston: Duxbury press.
Yusriski, R., Sukoyo, S., Samadhi, T., & Halim, A. (2015). Integer batch scheduling problems for a single-machine with simultaneous effect of learning and forgetting to minimize total actual flow time. International Journal of Industrial Engineering Computations, 6(3), 365-378.
Zahedi, Z., Samadhi, T.M.A., Suprayogi, S., & Halim, A.H. (2014). Integrating batch production and maintenance scheduling on a deteriorating machine to minimize production and maintenance costs in just in time environment. Proceedings 15th Asia Pacific Industrial Engineering and Management System (APIEMS), 12-15 October, Jeju, South Korea, 2061-2069.