How to cite this paper
Esmaeili, M. (2012). Optimization costs of the single-machine scheduling problem with maintenance activities by using genetic algorithm.Management Science Letters , 2(2), 673-680.
Refrences
Chen, W. J. (2006). Minimizing total flow time in the single-machine scheduling problem with periodic maintenance. Journal of the Operational Research Society. 57: 410–415.
Chen, W. J. (2009). Minimizing number of tardy jobs on a single machine subject to periodic maintenance, Omega, 37, 591–599.
Chang, P. C., Chen, S. H., & Fan, C. Y. (2009). A hybrid electromagnetism-like algorithm for single machine scheduling problem. Expert Systems with Applications 36, 1259–1267.
Hsu, C. J., Low., C. & Su, C. T. (2010). A single-machine scheduling problem with maintenance activities to minimize makespan. Applied Mathematics and Computation, 215, 3929-3935.
Low. C., Hsu, C. J., & Su, C. T. (2010). A modified particle swarm optimization algorithm for a single-machine scheduling problem with periodic maintenance. Expert Systems with Applications 37, 6429-6434.
Pinedo. M. (2002). Scheduling, Theory, Algorithms, and Systems, Prentice-Hall, New Jersey.
Sbihi, M., & Varnier, C. (2008). Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness. Computers and industrial Engineering, 55, 830–840.
Shasavari Pour, N., Esmaeili., M., & Esmaeili, R. (2011). Optimization of fuzzy multi-company workers assignment problem with penalty using genetic algorithm. Journal on Computer Science and Engineering, 3, 3148-3160.
Shasavari Pour, N., Modarres, M., Tavakkoli-Moghaddam, R., & Najafi, E. (2010). Optimizing a multi-objective time-cost-quality trade-off problem by a new hybrid genetic algorithm. Word Applied Journal 10(3), 335-363.
Chen, W. J. (2009). Minimizing number of tardy jobs on a single machine subject to periodic maintenance, Omega, 37, 591–599.
Chang, P. C., Chen, S. H., & Fan, C. Y. (2009). A hybrid electromagnetism-like algorithm for single machine scheduling problem. Expert Systems with Applications 36, 1259–1267.
Hsu, C. J., Low., C. & Su, C. T. (2010). A single-machine scheduling problem with maintenance activities to minimize makespan. Applied Mathematics and Computation, 215, 3929-3935.
Low. C., Hsu, C. J., & Su, C. T. (2010). A modified particle swarm optimization algorithm for a single-machine scheduling problem with periodic maintenance. Expert Systems with Applications 37, 6429-6434.
Pinedo. M. (2002). Scheduling, Theory, Algorithms, and Systems, Prentice-Hall, New Jersey.
Sbihi, M., & Varnier, C. (2008). Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness. Computers and industrial Engineering, 55, 830–840.
Shasavari Pour, N., Esmaeili., M., & Esmaeili, R. (2011). Optimization of fuzzy multi-company workers assignment problem with penalty using genetic algorithm. Journal on Computer Science and Engineering, 3, 3148-3160.
Shasavari Pour, N., Modarres, M., Tavakkoli-Moghaddam, R., & Najafi, E. (2010). Optimizing a multi-objective time-cost-quality trade-off problem by a new hybrid genetic algorithm. Word Applied Journal 10(3), 335-363.