How to cite this paper
Singh, N., Vaish, B & Singh, S. (2014). Coordination policy for a three echelon supply chain considering imperfect quality items.International Journal of Industrial Engineering Computations , 5(4), 589-602.
Refrences
Banerjee, A. (1986). A joint economic lot size model for purchaser and vendor. Decision Sciences, 17, 292–311.
Ben-Daya, M. & Hariga, M. (2000). Economic lot scheduling problem with imperfect production processes. Journal of the Operational Research Society, 51, 875–881.
Biswas, P. & Sarker, B.R. (2008). Optimal batch quantity models for a lean production system with in-cycle rework and scrap. International Journal of Production Research, 46, 6585–6610.
Clark, A.J. & Scarf, H., (1960). Optimal policies for a multi echelon inventory problem. Management Science, 6, 475–490.
Cheng, C. E. (1989). An economic production quantity model with flexibility and reliability considerations. European Journal of Operational Research, 39, 174–179.
Chung, K.J. & Hou, K. L. (2003). An optimal production run time with imperfect production processes and allowable shortages. Computers & Operations Research, 20, 483–490.
Chiu, Y.S.P., Ting, C.K., Cheng, C.B. & Lin, F.Y. (2007). Alternative approach for realistic lot size problem with random scrap rate and backlogging. WSEAS Transactions on Mathematics, 6, 736-740.
C?rdenas-Barr?n, L.E., (2008). Optimal manufacturing batch size with rework in a single stage production system - A simple derivation. Computers and Industrial Engineering Journal, 55, 758–765.
Cardenas-Barron, L. E. (2009). Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Computers and Industrial Engineering, 57, 1105–1113.
Eroglu, A. & Ozdemir, G. (2007). An economic order quantity model with defective items and shortages. International Journal of Production Economics, 106, 544–549.
Jaber, M.Y. & Guiffrida, A. L. (2004). Learning curves for processes generating defects requiring reworks. European Journal of Operational Research, 159, 663–672.
Khouja, M. & Mehrez, A. (1994). An economic production lot size model with imperfect quality and variable production rate. Journal of the Operational Research Society, 45, 1405–1417.
Khouja, M. (1999). A note on deliberately slowing down output in a family production context. International Journal of Production Research, 37, 4067–4077.
Lee, H. L. & Rosenblatt, M. J. (1987). Simultaneous determination of production cycle and inspection schedules in a production system. Management Sciences, 3, 1125–1136.
Liao, G. L. (2007). Optimal production correction and maintenance policy for imperfect process. European Journal of Operational Research, 182, 1140–1149.
Lo, S.T., Wee, H.M. & Huang, W. C. (2007). An integrated production inventory model with imperfect production processes and Weibull distribution deterioration under inflation. International Journal of Production Economics, 106, 248–260.
Lee, H. H. (2008). The investment model in preventive maintenance in multi-level production systems. International Journal of Production Economics, 112, 816–828.
Liao, G. L. Chen, Y. H. & Sheu, S. H. (2009). Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance. European Journal of Operational Research, 195, 348–357.
Pal, B., Sana, S. S. & Chaudhari, K. (2012). Three-layer supply chain production inventory model for reworkable items. Applied Mathematics and Computation, 219, 530-543
Pal, B., Sana, S. S. & Chaudhari, K. (2012). A multi-echelon supply chain model for reworkable items in multiple-markets with supply disruption. Economic Modelling, 29, 1891-1898.
Rosenblatt, M. J. & Lee, H. L. (1986). Economic production cycles with imperfect production processes, IIE Transactions, 18, 48–55.
Salameh, M. K. & Jaber, M. Y. (2000). Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 64, 59–64.
Sheu, S. H., Chen, J.A., (2004) Optimal lot-sizing problem with imperfect maintenance and imperfect production. International Journal of Systems Science 35, 69–77.
Sarker, B. R., Jamal, A. M. M. & Mondal, S. (2008). Optimal batch sizing in a multi-stage production system with rework consideration, European Journal of Operational Research, 184, 915–929.
Sana, S. S. & Chaudhuri, K. S. (2010). An EMQ model in an imperfect production process. International Journal of Systems Science, 41 (6), 635–646.
Sana, S. S. (2010). A production-inventory model in an imperfect production process. European Journal of Operational Research, 200 (2), 451–464.
Sarkar, B., Sana, S. S. & Chaudhuri, K. S. (2010). Optimal reliability, production lot size and safety stock in an imperfect production system. International Journal of Mathematics in Operational Research, 2, 467–490.
Sana, S. S. (2011). A production-inventory model of imperfect quality products in a three-layer supply chain. Decision Support Systems, 50, 539–547.
Sarkar, B. (2012). An inventory model with reliability in an imperfect production process. Applied Mathematics and Computation, 218, 4881-4891.
Singh, N., Vaish, B. & Singh, S. R. (2012). An economic production lot-size (EPLS) model with rework and flexibility under allowable shortages. International Journal of Procurement Management, 5(1), 104-122.
Wang, C. H. (2004). The impact of a free-repair warranty policy on EMQ model for imperfect production systems. Computers & Operations Research, 31, 2021–2035.
Yeh, R. H., Ho, W. T. & Tseng, S. T. (2000). Optimal production run length for products sold with warranty. European Journal Operational Research, 120, 575–582.
Ben-Daya, M. & Hariga, M. (2000). Economic lot scheduling problem with imperfect production processes. Journal of the Operational Research Society, 51, 875–881.
Biswas, P. & Sarker, B.R. (2008). Optimal batch quantity models for a lean production system with in-cycle rework and scrap. International Journal of Production Research, 46, 6585–6610.
Clark, A.J. & Scarf, H., (1960). Optimal policies for a multi echelon inventory problem. Management Science, 6, 475–490.
Cheng, C. E. (1989). An economic production quantity model with flexibility and reliability considerations. European Journal of Operational Research, 39, 174–179.
Chung, K.J. & Hou, K. L. (2003). An optimal production run time with imperfect production processes and allowable shortages. Computers & Operations Research, 20, 483–490.
Chiu, Y.S.P., Ting, C.K., Cheng, C.B. & Lin, F.Y. (2007). Alternative approach for realistic lot size problem with random scrap rate and backlogging. WSEAS Transactions on Mathematics, 6, 736-740.
C?rdenas-Barr?n, L.E., (2008). Optimal manufacturing batch size with rework in a single stage production system - A simple derivation. Computers and Industrial Engineering Journal, 55, 758–765.
Cardenas-Barron, L. E. (2009). Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Computers and Industrial Engineering, 57, 1105–1113.
Eroglu, A. & Ozdemir, G. (2007). An economic order quantity model with defective items and shortages. International Journal of Production Economics, 106, 544–549.
Jaber, M.Y. & Guiffrida, A. L. (2004). Learning curves for processes generating defects requiring reworks. European Journal of Operational Research, 159, 663–672.
Khouja, M. & Mehrez, A. (1994). An economic production lot size model with imperfect quality and variable production rate. Journal of the Operational Research Society, 45, 1405–1417.
Khouja, M. (1999). A note on deliberately slowing down output in a family production context. International Journal of Production Research, 37, 4067–4077.
Lee, H. L. & Rosenblatt, M. J. (1987). Simultaneous determination of production cycle and inspection schedules in a production system. Management Sciences, 3, 1125–1136.
Liao, G. L. (2007). Optimal production correction and maintenance policy for imperfect process. European Journal of Operational Research, 182, 1140–1149.
Lo, S.T., Wee, H.M. & Huang, W. C. (2007). An integrated production inventory model with imperfect production processes and Weibull distribution deterioration under inflation. International Journal of Production Economics, 106, 248–260.
Lee, H. H. (2008). The investment model in preventive maintenance in multi-level production systems. International Journal of Production Economics, 112, 816–828.
Liao, G. L. Chen, Y. H. & Sheu, S. H. (2009). Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance. European Journal of Operational Research, 195, 348–357.
Pal, B., Sana, S. S. & Chaudhari, K. (2012). Three-layer supply chain production inventory model for reworkable items. Applied Mathematics and Computation, 219, 530-543
Pal, B., Sana, S. S. & Chaudhari, K. (2012). A multi-echelon supply chain model for reworkable items in multiple-markets with supply disruption. Economic Modelling, 29, 1891-1898.
Rosenblatt, M. J. & Lee, H. L. (1986). Economic production cycles with imperfect production processes, IIE Transactions, 18, 48–55.
Salameh, M. K. & Jaber, M. Y. (2000). Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 64, 59–64.
Sheu, S. H., Chen, J.A., (2004) Optimal lot-sizing problem with imperfect maintenance and imperfect production. International Journal of Systems Science 35, 69–77.
Sarker, B. R., Jamal, A. M. M. & Mondal, S. (2008). Optimal batch sizing in a multi-stage production system with rework consideration, European Journal of Operational Research, 184, 915–929.
Sana, S. S. & Chaudhuri, K. S. (2010). An EMQ model in an imperfect production process. International Journal of Systems Science, 41 (6), 635–646.
Sana, S. S. (2010). A production-inventory model in an imperfect production process. European Journal of Operational Research, 200 (2), 451–464.
Sarkar, B., Sana, S. S. & Chaudhuri, K. S. (2010). Optimal reliability, production lot size and safety stock in an imperfect production system. International Journal of Mathematics in Operational Research, 2, 467–490.
Sana, S. S. (2011). A production-inventory model of imperfect quality products in a three-layer supply chain. Decision Support Systems, 50, 539–547.
Sarkar, B. (2012). An inventory model with reliability in an imperfect production process. Applied Mathematics and Computation, 218, 4881-4891.
Singh, N., Vaish, B. & Singh, S. R. (2012). An economic production lot-size (EPLS) model with rework and flexibility under allowable shortages. International Journal of Procurement Management, 5(1), 104-122.
Wang, C. H. (2004). The impact of a free-repair warranty policy on EMQ model for imperfect production systems. Computers & Operations Research, 31, 2021–2035.
Yeh, R. H., Ho, W. T. & Tseng, S. T. (2000). Optimal production run length for products sold with warranty. European Journal Operational Research, 120, 575–582.