How to cite this paper
Farsijani, H., Nikabadi, M & Amirimoghadam, H. (2015). Six sigma project selections using fuzzy network-analysis and fuzzy MADM.Decision Science Letters , 4(1), 87-96.
Refrences
Adams, C. W., Gupta, P., & Wilson, C. E. (2003). Six sigma deployment (Vol. 4). Routledge.
Azar, A., & Fraji, H. (2008). Fuzzy Management Sciences, Tehran: Mehran Nashar Publication, [In Persian].
Coronado, R. B., & Antony, J. (2002). Critical success factors for the successful implementation of six sigma projects in organisations. The TQM magazine, 14(2), 92-99.
Breyfogle III, F. W., Cupello, J. M., & Meadows, B. (2000). Managing Six Sigma: a practical guide to understanding, assessing, and implementing the strategy that yields bottom-line success. John Wiley Sons.
Cheng, J. L. (2008). Implementing Six Sigma via TQM improvement: an empirical study in Taiwan. The TQM Journal, 20(3), 182-195.
Büyük?zkan, G., & ?ztürkcan, D. (2010). An integrated analytic approach for Six Sigma project selection. Expert Systems with Applications, 37(8), 5835-5847.
Brun, A. (2011). Critical success factors of Six Sigma implementations in Italian companies. International Journal of Production Economics, 131(1), 158-164.
Eckes, G. (2002). The Six Sigma revolution: How General Electric and others turned process into profits. John Wiley & Sons.
Farsijani, H. (2010). World Class Manufacturing and Operations Techniques. Tehran: Samt Publication.
Han, C., & Lee, Y. H. (2002). Intelligent integrated plant operation system for Six Sigma. Annual Reviews in Control, 26(1), 27-43.
Ingle, S., & Roe, W. (2001). Six sigma black belt implementation. The TQM Magazine, 13(4), 273-280.
Johnson, A., & Swisher, B. (2003). How six sigma improves R & D. Research Technology Management, 46(2), 12-15.
K?ksalan, M. M., Wallenius, J., & Zionts, S. (2011). Multiple criteria decision making: from early history to the 21st century. World Scientific.
Linderman, K., Schroeder, R. G., Zaheer, S., & Choo, A. S. (2003). Six Sigma: a goal-theoretic perspective. Journal of Operations management, 21(2), 193-203.
Montgomery, D. C. (2001). Introduction to Statistical Quality Control, 4th Edition. John Wiley, NY.
Nonthaleerak, P., & Hendry, L. (2008). Exploring the Six Sigma phenomenon using multiple case study evidence. International Journal of Operations & Production Management, 28(3), 279-303.
Neuman, R. P., & Cavanagh, R. (2000). The six sigma way: How GE, Motorola, and other top companies are honing their performance. McGraw Hill Professional.
Pyzdek, T. (2003). The six sigma project planner. A Step by Step Guide to Leading a Six Sigma Project Through DMAIC.
Ruffa, S. A. (2008). Going lean: How the best companies apply lean manufacturing principles to shatter uncertainty, drive innovation, and maximize profits. AMACOM Div American Mgmt Assn.
Saaty, T. L., & Takizawa, M. (1986). Dependence and independence: From linear hierarchies to nonlinear networks. European Journal of Operational Research, 26(2), 229-237.
Snee, R. D. (2004). Six–Sigma: the evolution of 100 years of business improvement methodology. International Journal of Six Sigma and Competitive Advantage, 1(1), 4-20.
Srdjevic, B., & Medeiros, Y. D. P. (2008). Fuzzy AHP assessment of water management plans. Water Resources Management, 22(7), 877-894.
Szeto, A. Y., & Tsang, A. H. (2005). Antecedents to successful implementation of Six Sigma. International Journal of Six Sigma and Competitive Advantage,1(3), 307-322.
Tadikamalla, P. (1994). The confusion over six sigma. Quality Progress, 27(1183), 83-85.
Van Pelt, M. (2008). Fuzzy Logic Applied to Daily Life. Seattle, WA: ISBN 0-252-16341-9.
Wessel, G. (2003). A Comparison of Traditional TQM Methodologies with the Six Sigma Approach for Quality Management. Six-Sigma-Quality. de, Hamburg, available at: www. wesselgo. de/sixsigma/reference/SSQ2_Differ ence_TQM_SixSigma. pdf (accessed 15 April 2008).
Yager, R. R., & Filev, D. P. (1994). Essentials of fuzzy modeling and control. New York.
Zadeh, L. A. (1968). Fuzzy algorithms. Information and control, 12(2), 94-102.
Azar, A., & Fraji, H. (2008). Fuzzy Management Sciences, Tehran: Mehran Nashar Publication, [In Persian].
Coronado, R. B., & Antony, J. (2002). Critical success factors for the successful implementation of six sigma projects in organisations. The TQM magazine, 14(2), 92-99.
Breyfogle III, F. W., Cupello, J. M., & Meadows, B. (2000). Managing Six Sigma: a practical guide to understanding, assessing, and implementing the strategy that yields bottom-line success. John Wiley Sons.
Cheng, J. L. (2008). Implementing Six Sigma via TQM improvement: an empirical study in Taiwan. The TQM Journal, 20(3), 182-195.
Büyük?zkan, G., & ?ztürkcan, D. (2010). An integrated analytic approach for Six Sigma project selection. Expert Systems with Applications, 37(8), 5835-5847.
Brun, A. (2011). Critical success factors of Six Sigma implementations in Italian companies. International Journal of Production Economics, 131(1), 158-164.
Eckes, G. (2002). The Six Sigma revolution: How General Electric and others turned process into profits. John Wiley & Sons.
Farsijani, H. (2010). World Class Manufacturing and Operations Techniques. Tehran: Samt Publication.
Han, C., & Lee, Y. H. (2002). Intelligent integrated plant operation system for Six Sigma. Annual Reviews in Control, 26(1), 27-43.
Ingle, S., & Roe, W. (2001). Six sigma black belt implementation. The TQM Magazine, 13(4), 273-280.
Johnson, A., & Swisher, B. (2003). How six sigma improves R & D. Research Technology Management, 46(2), 12-15.
K?ksalan, M. M., Wallenius, J., & Zionts, S. (2011). Multiple criteria decision making: from early history to the 21st century. World Scientific.
Linderman, K., Schroeder, R. G., Zaheer, S., & Choo, A. S. (2003). Six Sigma: a goal-theoretic perspective. Journal of Operations management, 21(2), 193-203.
Montgomery, D. C. (2001). Introduction to Statistical Quality Control, 4th Edition. John Wiley, NY.
Nonthaleerak, P., & Hendry, L. (2008). Exploring the Six Sigma phenomenon using multiple case study evidence. International Journal of Operations & Production Management, 28(3), 279-303.
Neuman, R. P., & Cavanagh, R. (2000). The six sigma way: How GE, Motorola, and other top companies are honing their performance. McGraw Hill Professional.
Pyzdek, T. (2003). The six sigma project planner. A Step by Step Guide to Leading a Six Sigma Project Through DMAIC.
Ruffa, S. A. (2008). Going lean: How the best companies apply lean manufacturing principles to shatter uncertainty, drive innovation, and maximize profits. AMACOM Div American Mgmt Assn.
Saaty, T. L., & Takizawa, M. (1986). Dependence and independence: From linear hierarchies to nonlinear networks. European Journal of Operational Research, 26(2), 229-237.
Snee, R. D. (2004). Six–Sigma: the evolution of 100 years of business improvement methodology. International Journal of Six Sigma and Competitive Advantage, 1(1), 4-20.
Srdjevic, B., & Medeiros, Y. D. P. (2008). Fuzzy AHP assessment of water management plans. Water Resources Management, 22(7), 877-894.
Szeto, A. Y., & Tsang, A. H. (2005). Antecedents to successful implementation of Six Sigma. International Journal of Six Sigma and Competitive Advantage,1(3), 307-322.
Tadikamalla, P. (1994). The confusion over six sigma. Quality Progress, 27(1183), 83-85.
Van Pelt, M. (2008). Fuzzy Logic Applied to Daily Life. Seattle, WA: ISBN 0-252-16341-9.
Wessel, G. (2003). A Comparison of Traditional TQM Methodologies with the Six Sigma Approach for Quality Management. Six-Sigma-Quality. de, Hamburg, available at: www. wesselgo. de/sixsigma/reference/SSQ2_Differ ence_TQM_SixSigma. pdf (accessed 15 April 2008).
Yager, R. R., & Filev, D. P. (1994). Essentials of fuzzy modeling and control. New York.
Zadeh, L. A. (1968). Fuzzy algorithms. Information and control, 12(2), 94-102.