How to cite this paper
Sadeghi, H., Makui, A & Heydari, H. (2013). Determining the periodicity and planned lead time in serial-production systems with dependent demand and uncertain lead time.Uncertain Supply Chain Management, 1(2), 87-98.
Refrences
Ballou, D.P., & Pazer, H.L. (1982).The impact of inspector, fallibility on the inspection policy in serial production systems. Management Science, 28, 387-399.
Conway, R., Maxwell, W., McClain, J.O., & Thomas, L.J. (1988).The role of work-in-process inventory in serial production lines. Operations Research, 36, 229-241.
Elhafsi, M. (2002). Optimal lead times planning in serial production systems with earliness and tardiness costs. IIE Transactions, 34, 233-243.
Gong, L., de Kok, T., & Ding, J. (1994). Optimal lead times planning in a serial production system. Management Science, 40, 629-632.
Harrison, T.P., & Lewis, H.S. (1996). Lot sizing in serial assembly systems with multiple constrained resources. Management Science, 42, 19-36.
Hogg, R. V., McKean, J. W., & Craig, A. T. (2013). Introduction to mathematical statistics. Pearson.
Hnaien, F., Dolgui, A., & Louly, M. A. O. (2008). Planned lead time optimization in material requirement planning environment for multilevel production systems. Journal of Systems Science and Systems Engineering,17(2), 132-155.
Kaplan, R. S. (1970). A dynamic inventory model with stochastic lead times.Management Science, 16(7), 491-507.
Karimi, I.A. (1992). Optimal cycle times in multistage serial systems with set-up and inventory costs. Management Science, 38, 1467-1481.
Mohan, R.P., & Ritzman, L.P. (1998). Planned lead times in multistage systems. Decision Sciences, 29, 163-191.
Rebello, R., Agnetis, A., & Mirchandani, P.B. (1995). Specialized Inspection Problems in Serial Production Systems. European Journal of Operational Research, 80, 277-296
Sheldon, R. (2002). A First Course In Probability, 6/E. Pearson Education India.
Yano, C. A. (1987b). Planned leadtimes for serial production systems. IIE transactions, 19(3), 300-307.
Tang, C. S. (1990). The impact of uncertainty on a production line. Management Science, 36(12), 1518-1531.
Wein, A. S. (1992). Random yield, rework and scrap in a multistage batch manufacturing environment. Operations Research, 40(3), 551-563.
Yano, C.A. (1987). Setting planned lead-times in serial production systems with tardiness costs. Management Science, 33, 95-106.
Conway, R., Maxwell, W., McClain, J.O., & Thomas, L.J. (1988).The role of work-in-process inventory in serial production lines. Operations Research, 36, 229-241.
Elhafsi, M. (2002). Optimal lead times planning in serial production systems with earliness and tardiness costs. IIE Transactions, 34, 233-243.
Gong, L., de Kok, T., & Ding, J. (1994). Optimal lead times planning in a serial production system. Management Science, 40, 629-632.
Harrison, T.P., & Lewis, H.S. (1996). Lot sizing in serial assembly systems with multiple constrained resources. Management Science, 42, 19-36.
Hogg, R. V., McKean, J. W., & Craig, A. T. (2013). Introduction to mathematical statistics. Pearson.
Hnaien, F., Dolgui, A., & Louly, M. A. O. (2008). Planned lead time optimization in material requirement planning environment for multilevel production systems. Journal of Systems Science and Systems Engineering,17(2), 132-155.
Kaplan, R. S. (1970). A dynamic inventory model with stochastic lead times.Management Science, 16(7), 491-507.
Karimi, I.A. (1992). Optimal cycle times in multistage serial systems with set-up and inventory costs. Management Science, 38, 1467-1481.
Mohan, R.P., & Ritzman, L.P. (1998). Planned lead times in multistage systems. Decision Sciences, 29, 163-191.
Rebello, R., Agnetis, A., & Mirchandani, P.B. (1995). Specialized Inspection Problems in Serial Production Systems. European Journal of Operational Research, 80, 277-296
Sheldon, R. (2002). A First Course In Probability, 6/E. Pearson Education India.
Yano, C. A. (1987b). Planned leadtimes for serial production systems. IIE transactions, 19(3), 300-307.
Tang, C. S. (1990). The impact of uncertainty on a production line. Management Science, 36(12), 1518-1531.
Wein, A. S. (1992). Random yield, rework and scrap in a multistage batch manufacturing environment. Operations Research, 40(3), 551-563.
Yano, C.A. (1987). Setting planned lead-times in serial production systems with tardiness costs. Management Science, 33, 95-106.