How to cite this paper
Taleizadeh, A., Cárdenas-Barrón, L., Biabani, J & Nikousokhan, R. (2012). Multi products single machine EPQ model with immediate rework process.International Journal of Industrial Engineering Computations , 3(2), 93-102.
Refrences
Bayindir, Z.P., Birbil, S.I., & Frenk, J.B.G. (2007). A deterministic inventory/production model with general inventory cost rate function and piecewise linear concave production costs. European Journal of Operational Research, 179, 114-123.
C?rdenas-Barr?n, L.E., (2007). On optimal manufacturing batch size with rework process at single-stage production system. Computers and Industrial Engineering, 53, 196-198.
C?rdenas-Barr?n, L.E., (2008). Optimal manufacturing batch size with rework in a single-stage production system – A simple derivation, Computers and Industrial Engineering, 55, 758-765.
C?rdenas-Barr?n, L.E., (2009a). On optimal batch sizing in a multi-stage production system with rework consideration. European Journal of Operational Research, 196, 1238-1244.
C?rdenas-Barr?n, L.E., (2009b). Economic production quantity with rework process at a single-stage manufacturing system with planned backorders, Computers and Industrial Engineering, 57, 1105-1113.
Chan, W.M., Ibrahim, R.N., & Lochert, P.B. (2003). A new EPQ model: integrating lower pricing, rework and reject situations. Production Planning & Control, 14, 588 – 595.
Cheng, T.C.E. (1991). An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Transactions, 23, 23–28.
Chiu, S.W., Chiu, Y.P., & Wu, B.P. (2003). An economic production quantity model with the steady production rate of scrap items. The Journal of Chaoyang University of Technology, 8, 225–235.
Chiu, S.W., & Chiu, Y.P. (2003). Mathematical modeling for production system with backlogging and failure in repair. Journal of Scientific and Industrial Research, 65,499–506.
Chiu, Y.P. (2003). Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization, 35,427–437.
Chiu, S.W., Gong, D.C., & Wee, H.M. (2004). Effects of random defective rate and imperfect rework process on economic production quantity model. Japan Journal of Industrial and Applied Mathematics, 21, 375-389.
Chiu, S.W. (2007). Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging. Applied Stochastic Models in Business and Industry, 23,165–178.
Chiu, S.W., Wang, S.L., & Chiu, Y.S.P. (2007). Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research, 180,664-676.
Chiu, S.W. (2008). Production lot size problem with failure in repair and backlogging derived without derivatives. European Journal of Operational Research, 188,610-615.
Chung, K.J. (1997). Bounds for production lot sizing with machine breakdown. Computer & Industrial Engineering, 32,139–144.
Hayek, P.A., & Salameh, M.K. (2001). Production lot sizing with the reworking of imperfect quality items produced. Production Planning & Control, 12,584–590.
Hou, K.L. (2007). An EPQ model with setup cost and process quality as functions of capital expenditure. Applied Mathematical Modeling, 31, 10-17.
Islam, S., & Roy, T.K. (2006). A fuzzy EPQ model with flexibility and reliability consideration and demand dependent unit production cost under a space constraint: A fuzzy geometric programming approach. Applied Mathematics and Computations, 176,531-544.
Jamal, A.M.M., Sarker, B.R., & Mondal, S. (2004). Optimal manufacturing batch size with rework process at a single-stage production system. Computer & Industrial Engineering, 47, 77–89.
Lee, H.L., & Rosenblatt, M. (1987). Simultaneous determination of production cycle and inspection schedules in a production system. Management Science, 33, 1125–1136.
Li, J., Wang, S., & Cheng, T.C.E. (2008) Analysis of postponement strategy by EPQ-based models with planned backorders. Omega, 36,777-788.
Pentico, W.D., Drake, M.J., Toews, C. (2009). The deterministic EPQ with partial back ordering: A new approach. Omega, 37,624-636.
Rosenblatt, M.J., & Lee, H.L. (1986) Economic production cycles with imperfect production processes. IIE Transactions, 18, 48–55.
Sarker, B.R.J., Jamal, A.M.M., & Mondal, S. (2008). Optimal batch sizing in a process at multi-stage production system with network consideration, European Journal of Operational research, 184, 915-929.
Taleizadeh, A.A., Najafi, A.A., & Niaki, S.T.A. (2010a). Economic production quantity model with scraped items and limited production capacity. International Journal of Science and Technology (Scientia Iranica), 17, 58-69.
Taleizadeh, A.A., Niaki, S.T.A., & Najafi, A.A. (2010b). Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint. Journal of Computational and Applied Mathematics, 233, 1834-1849.
Taleizadeh, A.A., Wee, H.M., & Sadjadi S.J. (2010c). Multi-Product Production Quantity Model With Repair Failure and Partial Back-ordering, Computers and Industrial Engineering, 59:45-54.
Taleizadeh, A.A., Widyadana, G.A., Wee, H.M., & Biabani, J. (2011a). Multi products single machine economic production quantity model with multiple batch size. International Journal of Industrial Engineering Computations, 2, 213–224.
Taleizadeh, A.A., Sadjadi S.J., & Niaki S.T.A. (2011b). Multi-Product Single-Machine EPQ Model with Immediate Rework Process and Back-Ordering, European Journal of Industrial Engineering, In Press.
Teng J.T., & Chang, C.T. (2009). Optimal manufacturer’s replenishment policies in the EPQ model under two levels of trade credit policy. European Journal of Operational Research, 195:358-363.
Wee, H.M., Jonas, Y.u., & Chen, M.C. (2007). Optimal inventory model for items with imperfect quality and shortage backordering. Omega, 35, 7-11.
C?rdenas-Barr?n, L.E., (2007). On optimal manufacturing batch size with rework process at single-stage production system. Computers and Industrial Engineering, 53, 196-198.
C?rdenas-Barr?n, L.E., (2008). Optimal manufacturing batch size with rework in a single-stage production system – A simple derivation, Computers and Industrial Engineering, 55, 758-765.
C?rdenas-Barr?n, L.E., (2009a). On optimal batch sizing in a multi-stage production system with rework consideration. European Journal of Operational Research, 196, 1238-1244.
C?rdenas-Barr?n, L.E., (2009b). Economic production quantity with rework process at a single-stage manufacturing system with planned backorders, Computers and Industrial Engineering, 57, 1105-1113.
Chan, W.M., Ibrahim, R.N., & Lochert, P.B. (2003). A new EPQ model: integrating lower pricing, rework and reject situations. Production Planning & Control, 14, 588 – 595.
Cheng, T.C.E. (1991). An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Transactions, 23, 23–28.
Chiu, S.W., Chiu, Y.P., & Wu, B.P. (2003). An economic production quantity model with the steady production rate of scrap items. The Journal of Chaoyang University of Technology, 8, 225–235.
Chiu, S.W., & Chiu, Y.P. (2003). Mathematical modeling for production system with backlogging and failure in repair. Journal of Scientific and Industrial Research, 65,499–506.
Chiu, Y.P. (2003). Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization, 35,427–437.
Chiu, S.W., Gong, D.C., & Wee, H.M. (2004). Effects of random defective rate and imperfect rework process on economic production quantity model. Japan Journal of Industrial and Applied Mathematics, 21, 375-389.
Chiu, S.W. (2007). Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging. Applied Stochastic Models in Business and Industry, 23,165–178.
Chiu, S.W., Wang, S.L., & Chiu, Y.S.P. (2007). Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research, 180,664-676.
Chiu, S.W. (2008). Production lot size problem with failure in repair and backlogging derived without derivatives. European Journal of Operational Research, 188,610-615.
Chung, K.J. (1997). Bounds for production lot sizing with machine breakdown. Computer & Industrial Engineering, 32,139–144.
Hayek, P.A., & Salameh, M.K. (2001). Production lot sizing with the reworking of imperfect quality items produced. Production Planning & Control, 12,584–590.
Hou, K.L. (2007). An EPQ model with setup cost and process quality as functions of capital expenditure. Applied Mathematical Modeling, 31, 10-17.
Islam, S., & Roy, T.K. (2006). A fuzzy EPQ model with flexibility and reliability consideration and demand dependent unit production cost under a space constraint: A fuzzy geometric programming approach. Applied Mathematics and Computations, 176,531-544.
Jamal, A.M.M., Sarker, B.R., & Mondal, S. (2004). Optimal manufacturing batch size with rework process at a single-stage production system. Computer & Industrial Engineering, 47, 77–89.
Lee, H.L., & Rosenblatt, M. (1987). Simultaneous determination of production cycle and inspection schedules in a production system. Management Science, 33, 1125–1136.
Li, J., Wang, S., & Cheng, T.C.E. (2008) Analysis of postponement strategy by EPQ-based models with planned backorders. Omega, 36,777-788.
Pentico, W.D., Drake, M.J., Toews, C. (2009). The deterministic EPQ with partial back ordering: A new approach. Omega, 37,624-636.
Rosenblatt, M.J., & Lee, H.L. (1986) Economic production cycles with imperfect production processes. IIE Transactions, 18, 48–55.
Sarker, B.R.J., Jamal, A.M.M., & Mondal, S. (2008). Optimal batch sizing in a process at multi-stage production system with network consideration, European Journal of Operational research, 184, 915-929.
Taleizadeh, A.A., Najafi, A.A., & Niaki, S.T.A. (2010a). Economic production quantity model with scraped items and limited production capacity. International Journal of Science and Technology (Scientia Iranica), 17, 58-69.
Taleizadeh, A.A., Niaki, S.T.A., & Najafi, A.A. (2010b). Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint. Journal of Computational and Applied Mathematics, 233, 1834-1849.
Taleizadeh, A.A., Wee, H.M., & Sadjadi S.J. (2010c). Multi-Product Production Quantity Model With Repair Failure and Partial Back-ordering, Computers and Industrial Engineering, 59:45-54.
Taleizadeh, A.A., Widyadana, G.A., Wee, H.M., & Biabani, J. (2011a). Multi products single machine economic production quantity model with multiple batch size. International Journal of Industrial Engineering Computations, 2, 213–224.
Taleizadeh, A.A., Sadjadi S.J., & Niaki S.T.A. (2011b). Multi-Product Single-Machine EPQ Model with Immediate Rework Process and Back-Ordering, European Journal of Industrial Engineering, In Press.
Teng J.T., & Chang, C.T. (2009). Optimal manufacturer’s replenishment policies in the EPQ model under two levels of trade credit policy. European Journal of Operational Research, 195:358-363.
Wee, H.M., Jonas, Y.u., & Chen, M.C. (2007). Optimal inventory model for items with imperfect quality and shortage backordering. Omega, 35, 7-11.