How to cite this paper
Ulugbek, F., Buyun, S., Zheng, X & Ismael, T. (2018). A reliability-based preventive maintenance methodology for the projection spot welding machine.Management Science Letters , 8(6), 497-506.
Refrences
Adhikary, D., Bose, D., Chattopadhyay, S., Bose, G., & Mitra, S. (2012). RAM investigation of coal-fired thermal power plants: a case study. International Journal of Industrial Engineering Computations, 3(3), 423-434.
Aggarwal, A., K., Kumar, S., & Singh, V. (2017). Mathematical modeling and reliability analysis of the serial processes in feeding system of a sugar plant. International Journal of System Assurance Engi-neering and Management, 8(1), 435-450.
Ahmad, R. (2018). Reliability analysis comparison on punching tool sets due to different maintenance de-cisions: a case study from the pulp manufacturing industry. The International Journal of Advanced Manufacturing Technology, 94(5-8), 1969-1979.
Amsc, N., & Sess, A. A. (2011). Department of Defense Handbook Reliability Growth Management. Menachem.
Barringer, H. P. (1997). Availability, reliability, maintainability, and capability. Triplex Chapter of the Vi-brations Institute. Humble, TX: Barringer and Associated Inc.
Khoshalan, H. A., Torabi, S. R., & Maleki, D. (2015). RAM analysis of hydraulic system of earth pressure balance tunnel boring machine. Indian Journal of Science and Technology, 8(28).
Kobbacy, K. A. H., & Murthy, D. P. (Eds.). (2008). Complex system maintenance handbook. Springer Science & Business Media.
Kimchi, M., & Phillips, D. H. (2017). Resistance Spot Welding: Fundamentals and Applications for the Automotive Industry. Synthesis Lectures on Mechanical Engineering, 1(2), i-115.
Li, W., Cheng, S., Hu, S. J., & Shriver, J. (2001). Statistical investigation on resistance spot welding quali-ty using a two-state, sliding-level experiment. Journal of manufacturing science and engineer-ing, 123(3), 513-520.
GölbAşı, O., & Demirel, N. (2017). Risk-based reliability allocation methodology to set a maintenance priority among system components: A case study in Mining. Eksploatacja i niezawodnosc, 19(2), 191.
Garg, H. (2014). Reliability, availability and maintainability analysis of industrial systems using PSO and fuzzy methodology. Mapan, 29(2), 115-129.
Hadi Hoseinie, S., Ataei, M., Khalokakaie, R., Ghodrati, B., & Kumar, U. (2012). Reliability analysis of drum shearer machine at mechanized longwall mines. Journal of quality in maintenance engineer-ing, 18(1), 98-119.
Puertollano, I. D. J., Macapuno, M. J. V., & Chien, Y. C. (2015). Determination of Burn-in Period Based on Reliability Target for Product Failure Time with Weibull Distribution. Proceedings of the 2015 In-ternational Conference on Industrial Engineering and Operations Management Dubai, UAE.
Rahimdel, M. J., Ataei, M., Khalokakaei, R., & Hoseinie, S. H. (2013). Reliability-based maintenance scheduling of hydraulic system of rotary drilling machines. International Journal of Mining Science and Technology, 23(5), 771-775.
Seyed, H. H., Mohammad, A., Reza, K., & Uday, K. (2011). Reliability and maintainability analysis of electrical system of drum shearers. Journal of Coal Science and Engineering (China), 17(2), 192-197.
Smith, R., & Mobley, R. K. (2011). Rules of thumb for maintenance and reliability engineers. Butter-worth-Heinemann.
Tomasevicz, C. L., & Asgarpoor, S. (2006, September). Preventive maintenance using continuous-time semi-Markov processes. In Power Symposium, 2006. NAPS 2006. 38th North American (pp. 3-8). IEEE.
Tsarouhas, P. H., & Fourlas, G. (2015). Reliability and maintainability analysis of a robotic system for in-dustrial applications: a case study. International Journal of Perform Engineering, 11(5), 453-462.
Waghmode, L. Y., & Patil, R. B. (2016). Reliability analysis and life cycle cost optimization: a case study from Indian industry. International Journal of Quality & Reliability Management, 33(3), 414-429.
Aggarwal, A., K., Kumar, S., & Singh, V. (2017). Mathematical modeling and reliability analysis of the serial processes in feeding system of a sugar plant. International Journal of System Assurance Engi-neering and Management, 8(1), 435-450.
Ahmad, R. (2018). Reliability analysis comparison on punching tool sets due to different maintenance de-cisions: a case study from the pulp manufacturing industry. The International Journal of Advanced Manufacturing Technology, 94(5-8), 1969-1979.
Amsc, N., & Sess, A. A. (2011). Department of Defense Handbook Reliability Growth Management. Menachem.
Barringer, H. P. (1997). Availability, reliability, maintainability, and capability. Triplex Chapter of the Vi-brations Institute. Humble, TX: Barringer and Associated Inc.
Khoshalan, H. A., Torabi, S. R., & Maleki, D. (2015). RAM analysis of hydraulic system of earth pressure balance tunnel boring machine. Indian Journal of Science and Technology, 8(28).
Kobbacy, K. A. H., & Murthy, D. P. (Eds.). (2008). Complex system maintenance handbook. Springer Science & Business Media.
Kimchi, M., & Phillips, D. H. (2017). Resistance Spot Welding: Fundamentals and Applications for the Automotive Industry. Synthesis Lectures on Mechanical Engineering, 1(2), i-115.
Li, W., Cheng, S., Hu, S. J., & Shriver, J. (2001). Statistical investigation on resistance spot welding quali-ty using a two-state, sliding-level experiment. Journal of manufacturing science and engineer-ing, 123(3), 513-520.
GölbAşı, O., & Demirel, N. (2017). Risk-based reliability allocation methodology to set a maintenance priority among system components: A case study in Mining. Eksploatacja i niezawodnosc, 19(2), 191.
Garg, H. (2014). Reliability, availability and maintainability analysis of industrial systems using PSO and fuzzy methodology. Mapan, 29(2), 115-129.
Hadi Hoseinie, S., Ataei, M., Khalokakaie, R., Ghodrati, B., & Kumar, U. (2012). Reliability analysis of drum shearer machine at mechanized longwall mines. Journal of quality in maintenance engineer-ing, 18(1), 98-119.
Puertollano, I. D. J., Macapuno, M. J. V., & Chien, Y. C. (2015). Determination of Burn-in Period Based on Reliability Target for Product Failure Time with Weibull Distribution. Proceedings of the 2015 In-ternational Conference on Industrial Engineering and Operations Management Dubai, UAE.
Rahimdel, M. J., Ataei, M., Khalokakaei, R., & Hoseinie, S. H. (2013). Reliability-based maintenance scheduling of hydraulic system of rotary drilling machines. International Journal of Mining Science and Technology, 23(5), 771-775.
Seyed, H. H., Mohammad, A., Reza, K., & Uday, K. (2011). Reliability and maintainability analysis of electrical system of drum shearers. Journal of Coal Science and Engineering (China), 17(2), 192-197.
Smith, R., & Mobley, R. K. (2011). Rules of thumb for maintenance and reliability engineers. Butter-worth-Heinemann.
Tomasevicz, C. L., & Asgarpoor, S. (2006, September). Preventive maintenance using continuous-time semi-Markov processes. In Power Symposium, 2006. NAPS 2006. 38th North American (pp. 3-8). IEEE.
Tsarouhas, P. H., & Fourlas, G. (2015). Reliability and maintainability analysis of a robotic system for in-dustrial applications: a case study. International Journal of Perform Engineering, 11(5), 453-462.
Waghmode, L. Y., & Patil, R. B. (2016). Reliability analysis and life cycle cost optimization: a case study from Indian industry. International Journal of Quality & Reliability Management, 33(3), 414-429.