How to cite this paper
Kumar, P & Tewari, P. (2017). Performance analysis and optimization for CSDGB filling system of a beverage plant using particle swarm optimization.International Journal of Industrial Engineering Computations , 8(3), 303-314.
Refrences
Arabi, A. A. Y., & Jahromi, A. E. (2012). Developing a new model for availability of a series repairable system with multiple cold-standby subsystems and optimization using simulated annealing considering redundancy and repair facility allocation. International Journal of System Assurance Engineering and Management, 3(4), 310-322.
Aggarwal, A. K., Singh, V., & Kumar, S. (2014). Availability analysis and performance optimization of a butter oil production system: a case study. International Journal of System Assurance Engineering and Management, 1-17.
Azaron, A., Perkgoz, C., Katagiri, H., Kato, K., & Sakawa, M. (2009). Multi-objective reliability optimization for dissimilar-unit cold-standby systems using a genetic algorithm. Computers & Operations Research, 36(5), 1562-1571.
Bose, D., Chattopadhyay, S., Bose, G., Adhikary, D., & Mitra, S. (2012). RAM investigation of coal-fired thermal power plants: a case study. International Journal of Industrial Engineering Computations, 3(3), 423-434.
Bourouni, K. (2013). Availability assessment of a reverse osmosis plant: comparison between reliability block diagram and fault tree analysis methods. Desalination, 313, 66-76.
Coit, D. W., Jin, T., & Wattanapongsakorn, N. (2004). System optimization with component reliability estimation uncertainty: a multi-criteria approach. IEEE transactions on reliability, 53(3), 369-380.
Carlos, S., Sánchez, A., Martorell, S., & Villanueva, J. F. (2012). Particle Swarm Optimization of safety components and systems of nuclear power plants under uncertain maintenance planning. Advances in Engineering Software, 50, 12-18.
Dhillon, B. S., & Singh, C. (1981). Engineering reliability: new techniques and applications (No. 04; TS173, D4.). New York: Wiley.
Gupta, P., Lal, A. K., Sharma, R. K., & Singh, J. (2005). Numerical analysis of reliability and availability of the serial processes in butter-oil processing plant. International Journal of Quality & Reliability Management, 22(3), 303-316.
Garg, D., Singh, J. & Kumar, K. (2009). Performance analysis of a cattle feed plant. ICFAI University Journal of Science and Technology, 5(2), 83-94.
Garg, S., Singh, J., & Singh, D. V. (2009). Availability and maintenance scheduling of a repairable block-board manufacturing system. International journal of reliability and safety, 4(1), 104-118.
Gowid, S., Dixon, R., & Ghani, S. (2014). Optimization of reliability and maintenance of liquefaction system on FLNG terminals using Markov modelling. International Journal Of Quality & Reliability Management, 31(3), 293-310.
Garg, H., & Rani, M. (2013). An approach for reliability analysis of industrial systems using PSO and IFS technique. ISA transactions, 52(6), 701-710.
Garg, H. (2013). Performance analysis of complex repairable industrial systems using PSO and fuzzy confidence interval based methodology. ISA transactions, 52(2), 171-183.
Huang, C. H., & Wang, C. H. (2014). Optimization of preventive maintenance for a multi-state degraded system by monitoring component performance. Journal of Intelligent Manufacturing, 1-20.
Kennedy J. & Eberhart R. C. (1995). Particle Swarm Optimization. In Proceedings of IEEE International Conference on Neural Network, 4, 942-948.
Kumar, D., Singh, J., & Pandey, P. C. (1989). Availability of a washing system in the paper industry. Microelectronics Reliability, 29(5), 775-778.
Kumar, S., Tewari, P. C. & Sharma, R. (2007). Simulated availability of co2 cooling system in a fertilizer plant. Industrial Engineering Journal, 36(10), 19-23.
Kumar, S., Tewari, P. C. & Kumar, S. (2009). Performance evaluation and availability analysis of ammonia synthesis unit in a fertilizer plant. Journal of Industrial Engineering International, 5( 9),17-26.
Kumar, S. & Tewari, P. C. (2011) Mathematical modeling and performance optimization of co2 cooling system of a fertilizer plant. International Journal of Industrial Engineering Computation, 2(3), 689-698.
Khanduja, R., Tewari, P. C. & Chauhan, R. S. (2012). Performance modeling and optimization for the stock preparation unit of a paper plant using genetic algorithm. International Journal of Quality Reliability and Management, 28(6), 688-703.
Khanduja, R., Tewari, P. C. & Gupta, M. (2012). Performance enhancement for crystallization unit of sugar plant using genetic algorithm technique. Journal of Industrial Engineering International, 28(6), 688-703.
Kumar, R., Sharma, A., & Tewari, P. (2012). Markov approach to evaluate the availability simulation model for power generation system in a thermal power plant. International Journal of Industrial Engineering Computations, 3(5), 743-750.
Kumar, R. (2014). Availability analysis of thermal power plant boiler air circulation system using Markov approach. Decision Science Letters, 3(1), 65-72.
Li, Y. F., & Peng, R. (2014). Availability modeling and optimization of dynamic multi-state series–parallel systems with random reconfiguration. Reliability Engineering & System Safety, 127, 47-57.
Modgil, V., Sharma, S. K., & Singh, J. (2013). Performance modeling and availability analysis of shoe upper manufacturing unit. International Journal of Quality & Reliability Management, 30(8), 816-831.
Sachdeva, A., Kumar, D., & Kumar, P. (2008). Planning and optimizing the maintenance of paper production systems in a paper plant. Computers & Industrial Engineering, 55(4), 817-829.
Tewari, P. C., Joshi, D., & Rao, M. S. (2005). Mathematical modeling and behavioral analysis of a refining system using genetic algorithm. In Proceedings of national conference on Competitive Manufacturing Technology and Management for Global Marketing, Chennai.
Usubamatov, R., Ismail, K. A., & Sah, J. M. (2013). Mathematical models for productivity and availability of automated lines. The International Journal of Advanced Manufacturing Technology, 66(1-4), 59-69.
Juang, Y. S., Lin, S. S., & Kao, H. P. (2008). A knowledge management system for series-parallel availability optimization and design. Expert Systems with Applications, 34(1), 181-193.
Waintraub, M., Schirru, R., & Pereira, C. M. (2009). Multiprocessor modeling of parallel Particle Swarm Optimization applied to nuclear engineering problems. Progress in Nuclear Energy, 51(6), 680-688.
Zhang, H., Innal, F., Dufour, F., & Dutuit, Y. (2014). Piecewise Deterministic Markov Processes based approach applied to an offshore oil production system. Reliability Engineering & System Safety, 126, 126-134.
Aggarwal, A. K., Singh, V., & Kumar, S. (2014). Availability analysis and performance optimization of a butter oil production system: a case study. International Journal of System Assurance Engineering and Management, 1-17.
Azaron, A., Perkgoz, C., Katagiri, H., Kato, K., & Sakawa, M. (2009). Multi-objective reliability optimization for dissimilar-unit cold-standby systems using a genetic algorithm. Computers & Operations Research, 36(5), 1562-1571.
Bose, D., Chattopadhyay, S., Bose, G., Adhikary, D., & Mitra, S. (2012). RAM investigation of coal-fired thermal power plants: a case study. International Journal of Industrial Engineering Computations, 3(3), 423-434.
Bourouni, K. (2013). Availability assessment of a reverse osmosis plant: comparison between reliability block diagram and fault tree analysis methods. Desalination, 313, 66-76.
Coit, D. W., Jin, T., & Wattanapongsakorn, N. (2004). System optimization with component reliability estimation uncertainty: a multi-criteria approach. IEEE transactions on reliability, 53(3), 369-380.
Carlos, S., Sánchez, A., Martorell, S., & Villanueva, J. F. (2012). Particle Swarm Optimization of safety components and systems of nuclear power plants under uncertain maintenance planning. Advances in Engineering Software, 50, 12-18.
Dhillon, B. S., & Singh, C. (1981). Engineering reliability: new techniques and applications (No. 04; TS173, D4.). New York: Wiley.
Gupta, P., Lal, A. K., Sharma, R. K., & Singh, J. (2005). Numerical analysis of reliability and availability of the serial processes in butter-oil processing plant. International Journal of Quality & Reliability Management, 22(3), 303-316.
Garg, D., Singh, J. & Kumar, K. (2009). Performance analysis of a cattle feed plant. ICFAI University Journal of Science and Technology, 5(2), 83-94.
Garg, S., Singh, J., & Singh, D. V. (2009). Availability and maintenance scheduling of a repairable block-board manufacturing system. International journal of reliability and safety, 4(1), 104-118.
Gowid, S., Dixon, R., & Ghani, S. (2014). Optimization of reliability and maintenance of liquefaction system on FLNG terminals using Markov modelling. International Journal Of Quality & Reliability Management, 31(3), 293-310.
Garg, H., & Rani, M. (2013). An approach for reliability analysis of industrial systems using PSO and IFS technique. ISA transactions, 52(6), 701-710.
Garg, H. (2013). Performance analysis of complex repairable industrial systems using PSO and fuzzy confidence interval based methodology. ISA transactions, 52(2), 171-183.
Huang, C. H., & Wang, C. H. (2014). Optimization of preventive maintenance for a multi-state degraded system by monitoring component performance. Journal of Intelligent Manufacturing, 1-20.
Kennedy J. & Eberhart R. C. (1995). Particle Swarm Optimization. In Proceedings of IEEE International Conference on Neural Network, 4, 942-948.
Kumar, D., Singh, J., & Pandey, P. C. (1989). Availability of a washing system in the paper industry. Microelectronics Reliability, 29(5), 775-778.
Kumar, S., Tewari, P. C. & Sharma, R. (2007). Simulated availability of co2 cooling system in a fertilizer plant. Industrial Engineering Journal, 36(10), 19-23.
Kumar, S., Tewari, P. C. & Kumar, S. (2009). Performance evaluation and availability analysis of ammonia synthesis unit in a fertilizer plant. Journal of Industrial Engineering International, 5( 9),17-26.
Kumar, S. & Tewari, P. C. (2011) Mathematical modeling and performance optimization of co2 cooling system of a fertilizer plant. International Journal of Industrial Engineering Computation, 2(3), 689-698.
Khanduja, R., Tewari, P. C. & Chauhan, R. S. (2012). Performance modeling and optimization for the stock preparation unit of a paper plant using genetic algorithm. International Journal of Quality Reliability and Management, 28(6), 688-703.
Khanduja, R., Tewari, P. C. & Gupta, M. (2012). Performance enhancement for crystallization unit of sugar plant using genetic algorithm technique. Journal of Industrial Engineering International, 28(6), 688-703.
Kumar, R., Sharma, A., & Tewari, P. (2012). Markov approach to evaluate the availability simulation model for power generation system in a thermal power plant. International Journal of Industrial Engineering Computations, 3(5), 743-750.
Kumar, R. (2014). Availability analysis of thermal power plant boiler air circulation system using Markov approach. Decision Science Letters, 3(1), 65-72.
Li, Y. F., & Peng, R. (2014). Availability modeling and optimization of dynamic multi-state series–parallel systems with random reconfiguration. Reliability Engineering & System Safety, 127, 47-57.
Modgil, V., Sharma, S. K., & Singh, J. (2013). Performance modeling and availability analysis of shoe upper manufacturing unit. International Journal of Quality & Reliability Management, 30(8), 816-831.
Sachdeva, A., Kumar, D., & Kumar, P. (2008). Planning and optimizing the maintenance of paper production systems in a paper plant. Computers & Industrial Engineering, 55(4), 817-829.
Tewari, P. C., Joshi, D., & Rao, M. S. (2005). Mathematical modeling and behavioral analysis of a refining system using genetic algorithm. In Proceedings of national conference on Competitive Manufacturing Technology and Management for Global Marketing, Chennai.
Usubamatov, R., Ismail, K. A., & Sah, J. M. (2013). Mathematical models for productivity and availability of automated lines. The International Journal of Advanced Manufacturing Technology, 66(1-4), 59-69.
Juang, Y. S., Lin, S. S., & Kao, H. P. (2008). A knowledge management system for series-parallel availability optimization and design. Expert Systems with Applications, 34(1), 181-193.
Waintraub, M., Schirru, R., & Pereira, C. M. (2009). Multiprocessor modeling of parallel Particle Swarm Optimization applied to nuclear engineering problems. Progress in Nuclear Energy, 51(6), 680-688.
Zhang, H., Innal, F., Dufour, F., & Dutuit, Y. (2014). Piecewise Deterministic Markov Processes based approach applied to an offshore oil production system. Reliability Engineering & System Safety, 126, 126-134.