How to cite this paper
Bagherpour, M., Mardimamaqani, H., Fallahdizcheh, A & Steyn, H. (2019). Project scheduling and forecasting by laws of physical movement.Journal of Project Management, 4(2), 97-108.
Refrences
Bagherpour, M., Safari, M., & Mohammad Sharifi, M. (2016). Applying mechanical equilibrium rules in project cost management. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 230(6), 1156-1163.
Caron, F., & Ruggeri, F. (2016). Project Management in the Oil & Gas Industry-A Bayesian Ap-proach.
Caron, F., Ruggeri, F., & Pierini, B. (2016). A Bayesian approach to improving estimate to com-plete. International Journal of Project Management, 34(8), 1687-1702.
Elshaer, R. (2013). Impact of sensitivity information on the prediction of project's duration using earned schedule method. International Journal of Project Management, 31(4), 579-588.
Kim, B. C., & Reinschmidt, K. F. (2009). Probabilistic forecasting of project duration using Bayesian inference and the beta distribution. Journal of Construction Engineering and Man-agement, 135(3), 178-186.
Li, J., Moselhi, O., & Alkass, S. (2006). Forecasting project status by using fuzzy logic. Journal of construction engineering and management, 132(11), 1193-1202.
Hosseinian, S., & Reinschmidt, K. F. (2015). Finding Best Model to Forecast Construction Dura-tion of Road Tunnels with New Austrian Tunneling Method Using Bayesian Inference: Case Study of Niayesh Highway Tunnel in Iran. Transportation Research Record: Journal of the Transportation Research Board, (2522), 113-120.
Narbaev, T., & De Marco, A. (2014). An earned schedule-based regression model to improve cost estimate at completion. International Journal of Project Management, 32(6), 1007-1018.
Pewdum, W., Rujirayanyong, T., & Sooksatra, V. (2009). Forecasting final budget and duration of highway construction projects. Engineering, Construction and Architectural Manage-ment, 16(6), 544-557.
Vandevoorde, S., & Vanhoucke, M. (2006). A comparison of different project duration forecast-ing methods using earned value metrics. International journal of project management, 24(4), 289-302.
Vanhoucke, M., & Vandevoorde, S. (2007). A simulation and evaluation of earned value metrics to forecast the project duration. Journal of the Operational Research Society, 58(10), 1361-1374.
Warburton, R. D., & Cioffi, D. F. (2016). Estimating a project's earned and final dura-tion. International Journal of Project Management, 34(8), 1493-1504.
Yousefi, N. (2018). Considering financial issues to estimate the project final cost in earned dura-tion management. Iberoamerican Journal of Project Management, 9(2), 01-13.
Caron, F., & Ruggeri, F. (2016). Project Management in the Oil & Gas Industry-A Bayesian Ap-proach.
Caron, F., Ruggeri, F., & Pierini, B. (2016). A Bayesian approach to improving estimate to com-plete. International Journal of Project Management, 34(8), 1687-1702.
Elshaer, R. (2013). Impact of sensitivity information on the prediction of project's duration using earned schedule method. International Journal of Project Management, 31(4), 579-588.
Kim, B. C., & Reinschmidt, K. F. (2009). Probabilistic forecasting of project duration using Bayesian inference and the beta distribution. Journal of Construction Engineering and Man-agement, 135(3), 178-186.
Li, J., Moselhi, O., & Alkass, S. (2006). Forecasting project status by using fuzzy logic. Journal of construction engineering and management, 132(11), 1193-1202.
Hosseinian, S., & Reinschmidt, K. F. (2015). Finding Best Model to Forecast Construction Dura-tion of Road Tunnels with New Austrian Tunneling Method Using Bayesian Inference: Case Study of Niayesh Highway Tunnel in Iran. Transportation Research Record: Journal of the Transportation Research Board, (2522), 113-120.
Narbaev, T., & De Marco, A. (2014). An earned schedule-based regression model to improve cost estimate at completion. International Journal of Project Management, 32(6), 1007-1018.
Pewdum, W., Rujirayanyong, T., & Sooksatra, V. (2009). Forecasting final budget and duration of highway construction projects. Engineering, Construction and Architectural Manage-ment, 16(6), 544-557.
Vandevoorde, S., & Vanhoucke, M. (2006). A comparison of different project duration forecast-ing methods using earned value metrics. International journal of project management, 24(4), 289-302.
Vanhoucke, M., & Vandevoorde, S. (2007). A simulation and evaluation of earned value metrics to forecast the project duration. Journal of the Operational Research Society, 58(10), 1361-1374.
Warburton, R. D., & Cioffi, D. F. (2016). Estimating a project's earned and final dura-tion. International Journal of Project Management, 34(8), 1493-1504.
Yousefi, N. (2018). Considering financial issues to estimate the project final cost in earned dura-tion management. Iberoamerican Journal of Project Management, 9(2), 01-13.