Authors: Seung-Kil Lim
DOI: 10.5267/j.ijiec.2020.3.001
Keywords: Sequential batching, Minimum quantity commitment, Non-exclusiveness, Agglomerative hierarchical clustering structure
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 3 | Views: 1058 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Zhong-Yun Zhao, Singa Wang Chiu, Victoria Chiu
DOI: 10.5267/j.ijiec.2020.1.004
Keywords: Fabrication runtime, Unreliable machine, Outsourcing, Vendor-buyer coordinated system, Multi-shipment, Scrap
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 3 | Views: 1125 | Reviews: 0
Authors: Robert Ojstersek, Miran Brezocnik, Borut Buchmeister
DOI: 10.5267/j.ijiec.2020.1.003
Keywords: Multi-objective optimization, Production scheduling, Evolutionary computation
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 3 | Views: 5268 | Reviews: 0
Authors: Umangi Pathak, Ravi Kant, Ravi Shankar
DOI: 10.5267/j.ijiec.2020.1.002
Keywords: Dual-supply chain, E-Commerce, Cooperative advertisement, Lead time, Free-riding
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 3 | Views: 1842 | Reviews: 0
Authors: Marcello Fera, Roberto Macchiaroli, Fabio Fruggiero, Alfredo Lambiase
DOI: 10.5267/j.ijiec.2020.1.001
Keywords: Additive Manufacturing, Scheduling, Heuristics, Production Planning
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 3 | Views: 1664 | Reviews: 0
Authors: Aseem K. Mishra, Divya Shrivastava
DOI: 10.5267/j.ijiec.2019.12.001
Keywords: Jaya algorithm, Permutation flow-shop scheduling problem, Makespan minimization
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 3 | Views: 1517 | Reviews: 0
Authors: Alberto Portioli-Staudacher, Federica Costa, Matthias Thürer
DOI: 10.5267/j.ijiec.2019.11.004
Keywords: Labour Flexibility, Workload Control, Output Control, Simulation, Flow shop
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 3 | Views: 1939 | Reviews: 0
Authors: Juan Camilo Paz Roa, John Willmer Escobar, Cesar Augusto Marín Moreno
DOI: 10.5267/j.ijiec.2019.11.003
Keywords: Ambulances, Emergency Medical Vehicles, Relocation, Dispatch, Matheuristic Algorithm, Optimization, Discrete event simulation
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 3 | Views: 2507 | Reviews: 0
Authors: Mauricio Iwama Takano, Marcelo Seido Nagano
DOI: 10.5267/j.ijiec.2019.11.002
Keywords: Scheduling, Flow shop, Blocking, Setup time constraints, Mixed-integer programming model, Iterated Greedy
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 3 | Views: 1297 | Reviews: 0
Authors: Paolo Renna, Matthias Thürer, Mark Stevenson
DOI: 10.5267/j.ijiec.2019.11.001
Keywords: Dual-resource constrained (DRC) shops, Flexible job shop scheduling, Game theory, Gale-Shapley, Simulation
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 2 | Views: 3009 | Reviews: 0
® 2010-2024 GrowingScience.Com