How to cite this paper
Chiu, Y., Zhao, Z., Chiu, S & Chiu, V. (2020). A vendor-buyer coordinated system featuring an unreliable machine, scrap, outsourcing, and multiple shipments.International Journal of Industrial Engineering Computations , 11(3), 341-358.
Refrences
Al-Odeh, M., & Altarazi, S. (2019). Supply chain management information systems survey for Jordanian companies. International Journal of Mathematical, Engineering and Management Sciences, 4(3), 567-579.
Alam, M., & Sarma, V.V.S. (1974). Optimum maintenance policy for an equipment subject to deterioration and random failure. IEEE Transactions on Systems, Man and Cybernetics, SMC-4(2), 172-175.
Alvarez-Vergas, R., Dallery, Y., & David, R. (1994). A study of the continuous flow-model of production lines with unreliable machines and finite buffers. Journal of Manufacturing Systems, 13(3), 221-234.
Bryce, D.J., & Useem, M. (1998). The impact of corporate outsourcing on company value. European Management Journal, 16(6), 635-643.
Chakravarthy, S. (1983). Reliability analysis of a parallel system with exponential life times and phase type repairs. OR Spektrum, 5(1), 25-32.
Chiu, Y-S.P., Liu, C-J., & Hwang, M-H. (2017). Optimal batch size considering partial outsourcing plan and rework. Jordan Journal of Mechanical and Industrial Engineering, 11(3), 195-200.
Chiu, Y-S.P., Chen, Y-R., Chiu, V., & Chiu, S.W. (2019a). Joint effects of stochastic machine failure, backorder of permissible shortage, rework, and scrap on stock replenishing decision. International Journal of Industrial Engineering Computations, 10(2), 263-280.
Chiu, Y-S.P., Chiu, V., Lin, H-D., & Chang, H-H. (2019b). Meeting multiproduct demand with a hybrid inventory replenishment system featuring quality reassurance. Operations Research Perspectives, 6, Art. No. 100112, 1-8.
Chiu, S.W., Wu, C-S., & Tseng, C-T. (2019c). Incorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system. Operations Research Perspectives, 6, Art. No. 100115, 1-12.
Çınar, E., & Güllü, R. (2012). An inventory model with capacity flexibility in the existence of advance capacity information. Decision Support Systems, 53, 320–330.
Díaz-Mateus, Y., Forero, B., López-Ospina, H., & Zambrano-Rey, G. (2018). Pricing and lot sizing optimization in a two-echelon supply chain with a constrained logit demand function. International Journal of Industrial Engineering Computations, 9(2), 205-220.
Golmakani, H.R., Moakedi, H. (2012). Periodic inspection optimization model for a two-component repairable system with failure interaction. Computers and Industrial Engineering, 63(3), 540-545.
Hill, R.M. (1996). Optimizing a production system with a fixed delivery schedule. Journal of the Operational Research Society, 47, 954-960.
Kamien, M.I., & Li, L. (1990). Subcontracting, Coordination, Flexibility, and Production Smoothing in Aggregate Planning. Management Science, 36(11), 1352-1363.
Köksal, G., Taşeli, A., Dolgun, L.E., & Batmaz, I. (2013). The effect of inspection error on quality and producer losses: The case of nominal-the-best type quality characteristic and rework European Journal of Industrial Engineering, 7(4), 497-528.
Kuhn, H., & Liske, T. (2011). Simultaneous supply and production planning. International Journal of Production Research, 49(13), 3795-3813.
Lee, I.S., & Sung, C.S. (2008). Single machine scheduling with outsourcing allowed. International Journal of Production Economics, 11(2), 623-634.
Levitin, G. (2003). Optimal allocation of multi-state elements in linear consecutively connected systems with vulnerable nodes. European Journal of Operational Research, 150(2), 406- 419.
Lin, H-D., Chen, Y-R., Chiu, V., & Chiu, Y-S.P. (2019). A decision model for a quality-assured EPQ-based intra-supply chain system considering overtime option. Journal of Applied Engineering Science 17(3), 361-371.
Mohammadi, M. (2017). The tradeoff between outsourcing and using more factories in a distributed flow shop system. Economic Computation and Economic Cybernetics Studies and Research, 51(4), 279-295.
Morales, F., Franco, C., & Mendez-Giraldo, G. (2018). Dynamic inventory routing problem: Policies considering network disruptions. International Journal of Industrial Engineering Computations, 9(4), 523-534.
Mosca, A., Vidyarthi, N., & Satir, A. (2019). Integrated transportation – inventory models: A review. Operations Research Perspectives, 6, Art. No. 100101.
Rahimi, M., & Fazlollahtabar, H. (2018). Optimization of a closed loop green supply chain using particle swarm and genetic algorithms. Jordan Journal of Mechanical and Industrial Engineering, 12(2), 77-91.
Sarkar, B. (2013). A production-inventory model with probabilistic deterioration in two-echelon supply chain management. Applied Mathematical Modelling, 37(5), 3138-3151.
Siajadi, H., Ibrahim, R.N., & Lochert, P.B. (2006). Joint economic lot size in distribution system with multiple shipment policy. International Journal of Production Economics, 102(2), 302-316.
Shakoor, M., Abu Jadayil, W., Jaber, N., & Jaber, S. (2017). Efficiency assessment in emergency department using lean thinking approach. Jordan Journal of Mechanical and Industrial Engineering, 11(2), 97-103.
Souha, B., Soufien, G., & Mtibaa, A. (2018). Using system generator to design a hardware implementation of a fault-tolerant control of induction motor for electrical vehicle. Journal of Engineering Research, 6(2), 138-154.
Stažnik, A., Babić, D., & Bajor, I. (2017). Identification and analysis of risks in transport chains. Journal of Applied Engineering Science, 15(1), 61-70.
Swenseth, S.R., & Olson, D.L. (2016). Trade-offs in lean vs. outsourced supply chains. International Journal of Production Research, 54(13), 4065-4080.
Taft, E.W. (1918). The most economical production lot. Iron Age, 101, 1410–1412.
Zahraee, S.M., Rohani, J.M., & Wong, K.Y. (2018). Application of computer simulation experiment and response surface methodology for productivity improvement in a continuous production line: Case study. Journal of King Saud University - Engineering Sciences, 30(3), 207-217.
Alam, M., & Sarma, V.V.S. (1974). Optimum maintenance policy for an equipment subject to deterioration and random failure. IEEE Transactions on Systems, Man and Cybernetics, SMC-4(2), 172-175.
Alvarez-Vergas, R., Dallery, Y., & David, R. (1994). A study of the continuous flow-model of production lines with unreliable machines and finite buffers. Journal of Manufacturing Systems, 13(3), 221-234.
Bryce, D.J., & Useem, M. (1998). The impact of corporate outsourcing on company value. European Management Journal, 16(6), 635-643.
Chakravarthy, S. (1983). Reliability analysis of a parallel system with exponential life times and phase type repairs. OR Spektrum, 5(1), 25-32.
Chiu, Y-S.P., Liu, C-J., & Hwang, M-H. (2017). Optimal batch size considering partial outsourcing plan and rework. Jordan Journal of Mechanical and Industrial Engineering, 11(3), 195-200.
Chiu, Y-S.P., Chen, Y-R., Chiu, V., & Chiu, S.W. (2019a). Joint effects of stochastic machine failure, backorder of permissible shortage, rework, and scrap on stock replenishing decision. International Journal of Industrial Engineering Computations, 10(2), 263-280.
Chiu, Y-S.P., Chiu, V., Lin, H-D., & Chang, H-H. (2019b). Meeting multiproduct demand with a hybrid inventory replenishment system featuring quality reassurance. Operations Research Perspectives, 6, Art. No. 100112, 1-8.
Chiu, S.W., Wu, C-S., & Tseng, C-T. (2019c). Incorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system. Operations Research Perspectives, 6, Art. No. 100115, 1-12.
Çınar, E., & Güllü, R. (2012). An inventory model with capacity flexibility in the existence of advance capacity information. Decision Support Systems, 53, 320–330.
Díaz-Mateus, Y., Forero, B., López-Ospina, H., & Zambrano-Rey, G. (2018). Pricing and lot sizing optimization in a two-echelon supply chain with a constrained logit demand function. International Journal of Industrial Engineering Computations, 9(2), 205-220.
Golmakani, H.R., Moakedi, H. (2012). Periodic inspection optimization model for a two-component repairable system with failure interaction. Computers and Industrial Engineering, 63(3), 540-545.
Hill, R.M. (1996). Optimizing a production system with a fixed delivery schedule. Journal of the Operational Research Society, 47, 954-960.
Kamien, M.I., & Li, L. (1990). Subcontracting, Coordination, Flexibility, and Production Smoothing in Aggregate Planning. Management Science, 36(11), 1352-1363.
Köksal, G., Taşeli, A., Dolgun, L.E., & Batmaz, I. (2013). The effect of inspection error on quality and producer losses: The case of nominal-the-best type quality characteristic and rework European Journal of Industrial Engineering, 7(4), 497-528.
Kuhn, H., & Liske, T. (2011). Simultaneous supply and production planning. International Journal of Production Research, 49(13), 3795-3813.
Lee, I.S., & Sung, C.S. (2008). Single machine scheduling with outsourcing allowed. International Journal of Production Economics, 11(2), 623-634.
Levitin, G. (2003). Optimal allocation of multi-state elements in linear consecutively connected systems with vulnerable nodes. European Journal of Operational Research, 150(2), 406- 419.
Lin, H-D., Chen, Y-R., Chiu, V., & Chiu, Y-S.P. (2019). A decision model for a quality-assured EPQ-based intra-supply chain system considering overtime option. Journal of Applied Engineering Science 17(3), 361-371.
Mohammadi, M. (2017). The tradeoff between outsourcing and using more factories in a distributed flow shop system. Economic Computation and Economic Cybernetics Studies and Research, 51(4), 279-295.
Morales, F., Franco, C., & Mendez-Giraldo, G. (2018). Dynamic inventory routing problem: Policies considering network disruptions. International Journal of Industrial Engineering Computations, 9(4), 523-534.
Mosca, A., Vidyarthi, N., & Satir, A. (2019). Integrated transportation – inventory models: A review. Operations Research Perspectives, 6, Art. No. 100101.
Rahimi, M., & Fazlollahtabar, H. (2018). Optimization of a closed loop green supply chain using particle swarm and genetic algorithms. Jordan Journal of Mechanical and Industrial Engineering, 12(2), 77-91.
Sarkar, B. (2013). A production-inventory model with probabilistic deterioration in two-echelon supply chain management. Applied Mathematical Modelling, 37(5), 3138-3151.
Siajadi, H., Ibrahim, R.N., & Lochert, P.B. (2006). Joint economic lot size in distribution system with multiple shipment policy. International Journal of Production Economics, 102(2), 302-316.
Shakoor, M., Abu Jadayil, W., Jaber, N., & Jaber, S. (2017). Efficiency assessment in emergency department using lean thinking approach. Jordan Journal of Mechanical and Industrial Engineering, 11(2), 97-103.
Souha, B., Soufien, G., & Mtibaa, A. (2018). Using system generator to design a hardware implementation of a fault-tolerant control of induction motor for electrical vehicle. Journal of Engineering Research, 6(2), 138-154.
Stažnik, A., Babić, D., & Bajor, I. (2017). Identification and analysis of risks in transport chains. Journal of Applied Engineering Science, 15(1), 61-70.
Swenseth, S.R., & Olson, D.L. (2016). Trade-offs in lean vs. outsourced supply chains. International Journal of Production Research, 54(13), 4065-4080.
Taft, E.W. (1918). The most economical production lot. Iron Age, 101, 1410–1412.
Zahraee, S.M., Rohani, J.M., & Wong, K.Y. (2018). Application of computer simulation experiment and response surface methodology for productivity improvement in a continuous production line: Case study. Journal of King Saud University - Engineering Sciences, 30(3), 207-217.