Growing Science » Tags cloud » Rework
Authors: Yuan-Shyi Peter Chiu, Yu-Ru Chen, Victoria Chiu, Singa Wang Chiu
DOI: 10.5267/j.ijiec.2018.6.005
Keywords: Operations Management, Fabrication cycle length, Stochastic failure, Backlog, Rework, Scrap, Acceptable service level
Journal: IJIEC | Year: 2019 | Volume: 10 | Issue: 2 | Views: 1468 | Reviews: 0
Authors: Singa Wang Chiu, Hong-Dar Lin, Chung-Li Chou, Yuan-Shyi Peter Chiu
DOI: 10.5267/j.ijiec.2017.11.004
Keywords: Optimization, Replenishment lot-size and shipments, Overtime, Rework, Economic manufacturing quantity, Mathematical modeling, Discontinuous issuing policy
Journal: IJIEC | Year: 2018 | Volume: 9 | Issue: 4 | Views: 2020 | Reviews: 0
Authors: Preeti Jawla, S. R. Singh
DOI: 10.5267/j.ijiec.2016.2.003
Keywords: Multi-item, Selling price dependent demand, Preservation, Variable holding cost, Volume flexibility, Learning, Rework, Inflation, Multiple production setups
Journal: IJIEC | Year: 2016 | Volume: 7 | Issue: 4 | Views: 1932 | Reviews: 0
Authors: Soumita Kundu, Tripti Chakrabarti
DOI: 10.5267/j.ijiec.2015.4.002
Keywords: Integrated supply chain, Multi-buyer, Rework, Shipment
Journal: IJIEC | Year: 2015 | Volume: 6 | Issue: 4 | Views: 1938 | Reviews: 0
Authors: T. Sekar, R. Uthayakumar
DOI: 10.5267/j.uscm.2017.6.001
Keywords: Manufacturer’s inventory, Buyer’s inventory, Rework, Integrated demand, Total relevant cost
Journal: USCM | Year: 2018 | Volume: 6 | Issue: 1 | Views: 2245 | Reviews: 0
Authors: S.R. Singh, Shalini Jain, S. Pareek
DOI: 10.5267/j.ijiec.2013.10.003
Keywords: Multiple production setups, Production models, Rework, Time dependent demand
Journal: IJIEC | Year: 2014 | Volume: 5 | Issue: 2 | Views: 2145 | Reviews: 0
® 2010-2024 GrowingScience.Com