How to cite this paper
Chiu, S., Lin, H., Chou, C & Chiu, Y. (2018). Mathematical modeling for exploring the effects of overtime option, rework, and discontinuous inventory issuing policy on EMQ model.International Journal of Industrial Engineering Computations , 9(4), 479-490.
Refrences
Abdul-Jalbar, B., Gutiérrez, J., & Sicilia, J. (2005). Integer-ratio policies for distribution/ inventory systems. International Journal of Production Economics, 93-94, 407-415.
Aboumasoudi, A.S., Mirzamohammadi, S., Makui, A., & Tamosaitiene, J. (2016). Development of network-ranking model to create the best production line value chain: A case study in Textile industry. Economic Computation and Economic Cybernetics Studies and Research, 50(1), 215-234.
Axsater, S. (1981). Economic order quantities and variations in production load: Interpretation of capacity costs as costs for regular capacity and overtime. International Journal of Production Research, 19(4), 439-440.
Balaji, M., Velmurugan, V., & Subashree, C. (2015). TADS: An assessment methodology for agile supply chains. Journal of Applied Research and Technology 13(5), 504-509.
Bazdar, A., Kazemzadeh, R.B., & Niaki, S.T.A. (2015). Variation source identification of multistage manufacturing processes through discriminant analysis and stream of variation methodology: A case study in automotive industry. Journal of Engineering Research, 3(2), 96-108.
Boone, T., Ganeshan, R., Guo, Y., & Ord, J.K. (2000). The impact of imperfect processes on production run times. Decision Sciences, 31(4), 773-785.
Campbell, G.M. (2012). On-call overtime for service workforce scheduling when demand is uncertain. Decision Sciences, 43(5), 817-850.
Cao, J., Chen, Y., & Zhou, G. (2015). A novel statistical prediction technique based on the dynamic relationship identification algorithm to forecast supply chain demand. Economic Computation and Economic Cybernetics Studies and Research, 49(1), 5-22.
Cetinkaya, S., & Lee, C.Y. (2000). Stock replenishment and shipment scheduling for vendor managed inventory systems. Management Science, 46 (2), 217-232.
Chiu, Y.-S.P., Wu, M.-F., Chiu, S.W., & Chang, H.-H. (2015). A simplified approach to the multi-item economic production quantity model with scrap, rework, and multi-delivery. Journal of Applied Research and Technology, 13(4), 472-476.
Chiu, S.W., Chen, S.-W., Chiu, Y.-S.P., & Li, T.-W. (2016a). Producer–retailer integrated EMQ system with machine breakdown, rework failures, and a discontinuous inventory issuing policy. SpringerPlus, 5(1), art. no. 339.
Chiu, Y-S.P., Kuo, J-S., Chiu, S.W., & Hsieh, Y-T. (2016b). Effect of delayed differentiation on a multi–product vendor–buyer integrated inventory system with rework. Advances in Production Engineering & Management 11(4), 333-344.
Chiu, Y-S.P., Liang, G-M., & Chiu, S.W. (2016c). Solving a fabrication lot-size and shipping frequency problem with an outsourcing policy and random scrap. Mathematical and Computational Applications, 21(4), art. no. 45.
Conley, W. (1985). Production scheduling with overtime considerations. International Journal on Policy and Information, 9(1), 149-157.
Dhaiban, A.K., Baten, M.A., & Aziz, N. (2017). A manufacturing-inventory control model with defective and deteriorating items. Far East Journal of Mathematical Sciences, 101(8), 1691-1709.
Dixon, P.S., Elder, M.D., Rand, G.K., & Silver, E.A. (1983) A heuristic algorithm for determining lot sizes of an item subject to regular and overtime production capacities. Journal of Operations Management, 3(3), 121-130.
Golhar, D., & Sarker, B. (1992). Economic manufacturing quantity in a just-in-time delivery system. International Journal of Production Research, 30(5), 961-972.
Grunder, O., Wang, D., & El Moudni, A. (2013). Production scheduling problem with delivery considerations in a mono-product supply chain environment to minimise the total joint cost. European Journal of Industrial Engineering, 7 (5), 615-634.
Hahm, J., & Yano, C.A. (1992). The economic lot and delivery scheduling problem: The single item case. International Journal of Production Economics, 28, 235-252.
Henig, M., & Gerchak, Y. (1990). Structure of periodic review policies in the presence of random yield. Operations Research, 38(4), 634-643.
Hill, R.M. (1995). On an optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy. Journal of the Operational Research Society, 46(2), 271-273.
Holm, P., & Kiander, J. (1993). The effects of work sharing on employment and overtime in Finnish manufacturing 1960-87: Comparison of three alternative models. Applied Economics, 25(6), 801-810.
Inderfurth, K., Janiak, A., Kovalyov, M.Y., & Werner, F. (2006). Batching work and rework processes with limited deterioration of reworkables. Computers and Operations Research, 33(6), 1595-1605.
Jindal, P., & Solanki, A. (2016). Integrated supply chain inventory model with quality improvement involving controllable lead time and backorder price discount. International Journal of Industrial Engineering Computations, 7(3), 463-480.
Jawla, P., & Singh, S.R. (2016). Multi-item economic production quantity model for imperfect items with multiple production setups and rework under the effect of preservation technology and learning environment. International Journal of Industrial Engineering Computations, 7(4), 703-716.
Khanna, A., Kishore, A., & Jaggi, C.K. (2017). Strategic production modeling for defective items with imperfect inspection process, rework, and sales return under two-level trade credit. International Journal of Industrial Engineering Computations, 8(1), 85-118.
Kim, K.R., Sung, C.O., Kwon, T.J., Lee, J., & Robboy, S.J. (2015). Defective pericyte recruitment of villous stromal vessels as the possible etiologic cause of hydropic change in complete hydatidiform mole. PLoS ONE, 10(4), art. no. e0122266.
Koley E, Verma K, & Ghosh S. (2015). An improved fault detection classification and location scheme based on wavelet transform and artificial neural network for six phase transmission line using single end data only. SpringerPlus, 4(1), art. no. 551.
Koren, R., & Palčič, I. (2015). The impact of technical and organisational innovation concepts on product characteristics. Advances in Production Engineering & Management, 10(1), 27-39.
Kuhn, H., & Liske, T. (2011). Simultaneous supply and production planning. International Journal of Production Research, 49 (13), 3795-3813.
Lemma, H.R., Singh, R., & Kaur, N. (2015). Determinants of supply chain coordination of milk and dairy industries in Ethiopia: a case of Addis Ababa and its surroundings. SpringerPlus, 4(1), art. no. 498.
Maddah, B., Moussawi, L., & Jaber, M.Y. (2010). Lot sizing with a Markov production process and imperfect items scrapped. International Journal of Production Economics, 124 (2), 340-347.
Mak, K.L. (1985). Inventory control of defective products when the demand is partially captive. International Journal of Production Research, 23(3), 533-542.
Qu, S., & Ji, Y. (2016) The worst-case weighted multi-objective game with an application to supply chain competitions. PLoS ONE, 11(1), art. no. e0147341.
Rardin, R.L. (1998). Optimization in Operations Research, Prentice-Hall, New Jersey, 739-741.
Renna, P. (2017). Allocation improvement policies to reduce process time based on workload evaluation in job shop manufacturing systems. International Journal of Industrial Engineering Computations, 8(3), 373-384.
Robinson Jr., E.P., & Sahin, F. (2001). Economic production lot sizing with periodic costs and overtime. Decision Sciences, 32(3), 423-451.
Sarker, R.A., & Khan, L.R. (2001). An optimal batch size under a periodic delivery policy. International Journal of Systems Science, 32(9), 1089-1099.
Schank, T. (2005). Are overtime plants more efficient than standard-time plants? A stochastic production frontier analysis using the IAB Establishment Panel. Empirical Economics, 30(3), 693-710.
Setiawan, R. (2016). A game theory approach in vendor-buyer probabilistic inventory system with imperfect quality, inspection error, minimum service level constraint and partial backordering. Far East Journal of Mathematical Sciences, 100(10), 1695-1704.
Taft, E.W. (1918). The most economical production lot. Iron Age, 101, 1410–1412.
Taleizadeh, A.A., Wee, H-M., & Sadjadi, S.J. (2010). Multi-product production quantity model with repair failure and partial backordering. Computers and Industrial Engineering, 59, 45-54.
Yilmaz, O.F., Cevikcan, E., & Durmusoglu, M.B. (2016). Scheduling batches in multi hybrid cell manufacturing system considering worker resources: A case study from pipeline industry. Advances in Production Engineering and Management, 11(3), 192-206.
Yum, B.J. & McDowell, E.D. (1987). Optimal inspection policies in a serial production system including scrap, rework and repair: An MILP approach. International Journal of Production Research, 25(10), 1451-1464.
Yura, K. (1994) Production scheduling to satisfy worker's preferences for days off and overtime under due-date constraints. International Journal of Production Economics, 33(1-3), 265-270.
Zargar, A.M. (1995). Effect of rework strategies on cycle time. Computers and Industrial Engineering, 29(1-4), 239-243.
Zhang, D., Zhang, Y., & Yu, M. (2016). A machining process oriented modeling approach for reliability optimization of failure-prone manufacturing systems. Journal of Engineering Research, 4(3), 128-143.
Zobolas, G.I., Tarantilis, C.D., & Ioannou, G. (2008). Extending capacity planning by positive lead times and optional overtime, earliness and tardiness for effective master production scheduling. International Journal of Production Research, 46(12), 3359-3386.
Aboumasoudi, A.S., Mirzamohammadi, S., Makui, A., & Tamosaitiene, J. (2016). Development of network-ranking model to create the best production line value chain: A case study in Textile industry. Economic Computation and Economic Cybernetics Studies and Research, 50(1), 215-234.
Axsater, S. (1981). Economic order quantities and variations in production load: Interpretation of capacity costs as costs for regular capacity and overtime. International Journal of Production Research, 19(4), 439-440.
Balaji, M., Velmurugan, V., & Subashree, C. (2015). TADS: An assessment methodology for agile supply chains. Journal of Applied Research and Technology 13(5), 504-509.
Bazdar, A., Kazemzadeh, R.B., & Niaki, S.T.A. (2015). Variation source identification of multistage manufacturing processes through discriminant analysis and stream of variation methodology: A case study in automotive industry. Journal of Engineering Research, 3(2), 96-108.
Boone, T., Ganeshan, R., Guo, Y., & Ord, J.K. (2000). The impact of imperfect processes on production run times. Decision Sciences, 31(4), 773-785.
Campbell, G.M. (2012). On-call overtime for service workforce scheduling when demand is uncertain. Decision Sciences, 43(5), 817-850.
Cao, J., Chen, Y., & Zhou, G. (2015). A novel statistical prediction technique based on the dynamic relationship identification algorithm to forecast supply chain demand. Economic Computation and Economic Cybernetics Studies and Research, 49(1), 5-22.
Cetinkaya, S., & Lee, C.Y. (2000). Stock replenishment and shipment scheduling for vendor managed inventory systems. Management Science, 46 (2), 217-232.
Chiu, Y.-S.P., Wu, M.-F., Chiu, S.W., & Chang, H.-H. (2015). A simplified approach to the multi-item economic production quantity model with scrap, rework, and multi-delivery. Journal of Applied Research and Technology, 13(4), 472-476.
Chiu, S.W., Chen, S.-W., Chiu, Y.-S.P., & Li, T.-W. (2016a). Producer–retailer integrated EMQ system with machine breakdown, rework failures, and a discontinuous inventory issuing policy. SpringerPlus, 5(1), art. no. 339.
Chiu, Y-S.P., Kuo, J-S., Chiu, S.W., & Hsieh, Y-T. (2016b). Effect of delayed differentiation on a multi–product vendor–buyer integrated inventory system with rework. Advances in Production Engineering & Management 11(4), 333-344.
Chiu, Y-S.P., Liang, G-M., & Chiu, S.W. (2016c). Solving a fabrication lot-size and shipping frequency problem with an outsourcing policy and random scrap. Mathematical and Computational Applications, 21(4), art. no. 45.
Conley, W. (1985). Production scheduling with overtime considerations. International Journal on Policy and Information, 9(1), 149-157.
Dhaiban, A.K., Baten, M.A., & Aziz, N. (2017). A manufacturing-inventory control model with defective and deteriorating items. Far East Journal of Mathematical Sciences, 101(8), 1691-1709.
Dixon, P.S., Elder, M.D., Rand, G.K., & Silver, E.A. (1983) A heuristic algorithm for determining lot sizes of an item subject to regular and overtime production capacities. Journal of Operations Management, 3(3), 121-130.
Golhar, D., & Sarker, B. (1992). Economic manufacturing quantity in a just-in-time delivery system. International Journal of Production Research, 30(5), 961-972.
Grunder, O., Wang, D., & El Moudni, A. (2013). Production scheduling problem with delivery considerations in a mono-product supply chain environment to minimise the total joint cost. European Journal of Industrial Engineering, 7 (5), 615-634.
Hahm, J., & Yano, C.A. (1992). The economic lot and delivery scheduling problem: The single item case. International Journal of Production Economics, 28, 235-252.
Henig, M., & Gerchak, Y. (1990). Structure of periodic review policies in the presence of random yield. Operations Research, 38(4), 634-643.
Hill, R.M. (1995). On an optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy. Journal of the Operational Research Society, 46(2), 271-273.
Holm, P., & Kiander, J. (1993). The effects of work sharing on employment and overtime in Finnish manufacturing 1960-87: Comparison of three alternative models. Applied Economics, 25(6), 801-810.
Inderfurth, K., Janiak, A., Kovalyov, M.Y., & Werner, F. (2006). Batching work and rework processes with limited deterioration of reworkables. Computers and Operations Research, 33(6), 1595-1605.
Jindal, P., & Solanki, A. (2016). Integrated supply chain inventory model with quality improvement involving controllable lead time and backorder price discount. International Journal of Industrial Engineering Computations, 7(3), 463-480.
Jawla, P., & Singh, S.R. (2016). Multi-item economic production quantity model for imperfect items with multiple production setups and rework under the effect of preservation technology and learning environment. International Journal of Industrial Engineering Computations, 7(4), 703-716.
Khanna, A., Kishore, A., & Jaggi, C.K. (2017). Strategic production modeling for defective items with imperfect inspection process, rework, and sales return under two-level trade credit. International Journal of Industrial Engineering Computations, 8(1), 85-118.
Kim, K.R., Sung, C.O., Kwon, T.J., Lee, J., & Robboy, S.J. (2015). Defective pericyte recruitment of villous stromal vessels as the possible etiologic cause of hydropic change in complete hydatidiform mole. PLoS ONE, 10(4), art. no. e0122266.
Koley E, Verma K, & Ghosh S. (2015). An improved fault detection classification and location scheme based on wavelet transform and artificial neural network for six phase transmission line using single end data only. SpringerPlus, 4(1), art. no. 551.
Koren, R., & Palčič, I. (2015). The impact of technical and organisational innovation concepts on product characteristics. Advances in Production Engineering & Management, 10(1), 27-39.
Kuhn, H., & Liske, T. (2011). Simultaneous supply and production planning. International Journal of Production Research, 49 (13), 3795-3813.
Lemma, H.R., Singh, R., & Kaur, N. (2015). Determinants of supply chain coordination of milk and dairy industries in Ethiopia: a case of Addis Ababa and its surroundings. SpringerPlus, 4(1), art. no. 498.
Maddah, B., Moussawi, L., & Jaber, M.Y. (2010). Lot sizing with a Markov production process and imperfect items scrapped. International Journal of Production Economics, 124 (2), 340-347.
Mak, K.L. (1985). Inventory control of defective products when the demand is partially captive. International Journal of Production Research, 23(3), 533-542.
Qu, S., & Ji, Y. (2016) The worst-case weighted multi-objective game with an application to supply chain competitions. PLoS ONE, 11(1), art. no. e0147341.
Rardin, R.L. (1998). Optimization in Operations Research, Prentice-Hall, New Jersey, 739-741.
Renna, P. (2017). Allocation improvement policies to reduce process time based on workload evaluation in job shop manufacturing systems. International Journal of Industrial Engineering Computations, 8(3), 373-384.
Robinson Jr., E.P., & Sahin, F. (2001). Economic production lot sizing with periodic costs and overtime. Decision Sciences, 32(3), 423-451.
Sarker, R.A., & Khan, L.R. (2001). An optimal batch size under a periodic delivery policy. International Journal of Systems Science, 32(9), 1089-1099.
Schank, T. (2005). Are overtime plants more efficient than standard-time plants? A stochastic production frontier analysis using the IAB Establishment Panel. Empirical Economics, 30(3), 693-710.
Setiawan, R. (2016). A game theory approach in vendor-buyer probabilistic inventory system with imperfect quality, inspection error, minimum service level constraint and partial backordering. Far East Journal of Mathematical Sciences, 100(10), 1695-1704.
Taft, E.W. (1918). The most economical production lot. Iron Age, 101, 1410–1412.
Taleizadeh, A.A., Wee, H-M., & Sadjadi, S.J. (2010). Multi-product production quantity model with repair failure and partial backordering. Computers and Industrial Engineering, 59, 45-54.
Yilmaz, O.F., Cevikcan, E., & Durmusoglu, M.B. (2016). Scheduling batches in multi hybrid cell manufacturing system considering worker resources: A case study from pipeline industry. Advances in Production Engineering and Management, 11(3), 192-206.
Yum, B.J. & McDowell, E.D. (1987). Optimal inspection policies in a serial production system including scrap, rework and repair: An MILP approach. International Journal of Production Research, 25(10), 1451-1464.
Yura, K. (1994) Production scheduling to satisfy worker's preferences for days off and overtime under due-date constraints. International Journal of Production Economics, 33(1-3), 265-270.
Zargar, A.M. (1995). Effect of rework strategies on cycle time. Computers and Industrial Engineering, 29(1-4), 239-243.
Zhang, D., Zhang, Y., & Yu, M. (2016). A machining process oriented modeling approach for reliability optimization of failure-prone manufacturing systems. Journal of Engineering Research, 4(3), 128-143.
Zobolas, G.I., Tarantilis, C.D., & Ioannou, G. (2008). Extending capacity planning by positive lead times and optional overtime, earliness and tardiness for effective master production scheduling. International Journal of Production Research, 46(12), 3359-3386.