How to cite this paper
Shirdeli, A. (2012). Probable maximum precipitation 24 hours estimation: A case study of Zanjan province of Iran.Management Science Letters , 2(6), 2237-2242.
Refrences
Chow, V. T., Maidment, D. R., & Mays, L. W. )1988(. Applied Hydrology, McGraw-Hill, USA
Desa M, M.N., Noriah, A.B., & Rakhecha, P.R. Probable maximum precipitation for 24 h duration over southeast Asian monsoon region—Selangor, Malaysia. Atmospheric Research, 58(1), 41-54.
Eliason, J. (1997). A statistical model for extreme precipitation. Water Resources Research,33(3), 449-455.
Gahraman, B. (2007). The estimation of one day duration probable precipitation over Atrak watershed in Iran. Iranian Journal of Science and Technology, 32, 175-179.
Hansen, E. M., L. C. Schreiner, & Miller, J. F. (1982). Application of probable maximum precipitation estimates, United States east of the 105th meridian. Hydrometeorological Rep. 52, National Weather Service, Silver Spring, MD, 176.
Hershfield, D. M. (1961). Estimating the probable maximum precipitation. Journal of Hydraulic Engineering, 87, 99–106.
Hershfield, D.M. (1965) Method for estimating probable maximum precipitation.
Journal of American Water Works Association, 57, 965–972.
Koutsoyainnis, D. (1999). A probabilistic view of Hershfield’s method for estimating probable maximum precipitation”, water Resource , Res.
Maidment, D.R. (1992). Handbook of Hydrology. McGraw–Hill, USA.
Rezacova, D., Pesice, P., & Sokol, Z. (2005). An estimation of the probable maximum precipitation for river basins in the Czech Republic. Atmospheric Research, 77(1-4), 407-421.
Tingsanchali, T., Tanmanee, S. (2012). Assessment of hydrological safety of Mae Sruai Dam, Thailand. Procedia Engineering, 32, 1198-1204
World meteorological Organization (WMO) (1986). Manual for Estimation of Probable Maximum Precipitation: summary. 2nd,WMO 332, 1.
Desa M, M.N., Noriah, A.B., & Rakhecha, P.R. Probable maximum precipitation for 24 h duration over southeast Asian monsoon region—Selangor, Malaysia. Atmospheric Research, 58(1), 41-54.
Eliason, J. (1997). A statistical model for extreme precipitation. Water Resources Research,33(3), 449-455.
Gahraman, B. (2007). The estimation of one day duration probable precipitation over Atrak watershed in Iran. Iranian Journal of Science and Technology, 32, 175-179.
Hansen, E. M., L. C. Schreiner, & Miller, J. F. (1982). Application of probable maximum precipitation estimates, United States east of the 105th meridian. Hydrometeorological Rep. 52, National Weather Service, Silver Spring, MD, 176.
Hershfield, D. M. (1961). Estimating the probable maximum precipitation. Journal of Hydraulic Engineering, 87, 99–106.
Hershfield, D.M. (1965) Method for estimating probable maximum precipitation.
Journal of American Water Works Association, 57, 965–972.
Koutsoyainnis, D. (1999). A probabilistic view of Hershfield’s method for estimating probable maximum precipitation”, water Resource , Res.
Maidment, D.R. (1992). Handbook of Hydrology. McGraw–Hill, USA.
Rezacova, D., Pesice, P., & Sokol, Z. (2005). An estimation of the probable maximum precipitation for river basins in the Czech Republic. Atmospheric Research, 77(1-4), 407-421.
Tingsanchali, T., Tanmanee, S. (2012). Assessment of hydrological safety of Mae Sruai Dam, Thailand. Procedia Engineering, 32, 1198-1204
World meteorological Organization (WMO) (1986). Manual for Estimation of Probable Maximum Precipitation: summary. 2nd,WMO 332, 1.