How to cite this paper
Keramati, M & Bahmani, V. (2015). Ranking periodic ordering models on the basis of minimizing total inventory cost.Management Science Letters , 5(6), 619-628.
Refrences
Alam tabriz, A., & Sobhani fard, Y. (2013). Production and Operations Management. Tehran: academic book publishing (In Persian).
Bai, X., & Liu, Y. (2014). Robust optimization of supply chain network design in fuzzy decision system. Journal of Intelligent Manufacturing, 1-19.
Baker, K. R. (1989). Lot-sizing procedures and a standard data set: a reconciliation of the literature. Journal of Manufacturing and Operations Management, 2(3), 199-221.
Bollou, R.H. (1992). Business Logistics Management. 3rd ed., prentice- Hall, Englewood, Clios, NJ.
Samak-Kulkarni, S. M., & Rajhans, N. R. (2013). Determination of Optimum Inventory Model for Minimizing Total Inventory Cost. Procedia Engineering, 51, 803-809.
Chopra, S., & Meindel, P. (2007). Supply chain management. 3rd edition. New York: Prentice Hall.
DeMatteis, J. J. (1968). An economic lot-sizing technique, I: The part-period algorithm. IBM systems Journal, 7(1), 30-38.
Graves, S. C., & Willems, S. P. (2000). Optimizing strategic safety stock placement in supply chains. Manufacturing & Service Operations Management,2(1), 68-83.
Hajshirmohammadi, A. (2008). Principles of production and inventory planning and control. (In Persian).
Hosseini-Baharanchy, S. R. (2002). Production planning and inventory control and order. Tehran: Jam Jam world Publications (In Persian).
Khademi zarea, H. (2004). Comprehensive approach to inventory control. Tehran: knowledge Soroush publishing (In Persian).
Muller, M. (2003). Essentials of Inventory management. American management Association (AMACOM).
New, C. (1975). Safety stocks for requirements planning. Production and Inventory Management, 16(2), 1-18.
Orlicky, J. (1975). Material requirements planning. McGrawHill. New York.
Samak-Kulkarni, S. M., & Rajhans, N. R. (2013). Determination of Optimum Inventory Model for Minimizing Total Inventory Cost. Procedia Engineering, 51, 803-809.
Suri, R. (1998). Quick response manufacturing: a companywide approach to reducing lead times. Productivity Press.
Silver, E. A., & Meal, H. C. (1973). A heuristic for selecting lot size quantities for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment. Production and inventory management, 14(2), 64-74.
Wagner, H. M., & Whitin, T. M. (1958). Dynamic version of the economic lot size model. Management science, 5(1), 89-96.
Bai, X., & Liu, Y. (2014). Robust optimization of supply chain network design in fuzzy decision system. Journal of Intelligent Manufacturing, 1-19.
Baker, K. R. (1989). Lot-sizing procedures and a standard data set: a reconciliation of the literature. Journal of Manufacturing and Operations Management, 2(3), 199-221.
Bollou, R.H. (1992). Business Logistics Management. 3rd ed., prentice- Hall, Englewood, Clios, NJ.
Samak-Kulkarni, S. M., & Rajhans, N. R. (2013). Determination of Optimum Inventory Model for Minimizing Total Inventory Cost. Procedia Engineering, 51, 803-809.
Chopra, S., & Meindel, P. (2007). Supply chain management. 3rd edition. New York: Prentice Hall.
DeMatteis, J. J. (1968). An economic lot-sizing technique, I: The part-period algorithm. IBM systems Journal, 7(1), 30-38.
Graves, S. C., & Willems, S. P. (2000). Optimizing strategic safety stock placement in supply chains. Manufacturing & Service Operations Management,2(1), 68-83.
Hajshirmohammadi, A. (2008). Principles of production and inventory planning and control. (In Persian).
Hosseini-Baharanchy, S. R. (2002). Production planning and inventory control and order. Tehran: Jam Jam world Publications (In Persian).
Khademi zarea, H. (2004). Comprehensive approach to inventory control. Tehran: knowledge Soroush publishing (In Persian).
Muller, M. (2003). Essentials of Inventory management. American management Association (AMACOM).
New, C. (1975). Safety stocks for requirements planning. Production and Inventory Management, 16(2), 1-18.
Orlicky, J. (1975). Material requirements planning. McGrawHill. New York.
Samak-Kulkarni, S. M., & Rajhans, N. R. (2013). Determination of Optimum Inventory Model for Minimizing Total Inventory Cost. Procedia Engineering, 51, 803-809.
Suri, R. (1998). Quick response manufacturing: a companywide approach to reducing lead times. Productivity Press.
Silver, E. A., & Meal, H. C. (1973). A heuristic for selecting lot size quantities for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment. Production and inventory management, 14(2), 64-74.
Wagner, H. M., & Whitin, T. M. (1958). Dynamic version of the economic lot size model. Management science, 5(1), 89-96.