Authors: Ashkan Hafezalkotob, Arian Hafezalkotob
Keywords: Bi-level distributed program-ming problem, Project client, Project contractors, Leader-follower interaction, Game theory
Journal: JPM | Year: 2018 | Volume: 3 | Issue: 2 | Views: 1837 | Reviews: 0
Authors: Mohammad Reza Ghaeli
Keywords: Project risk management, Risk management process
Journal: JPM | Year: 2018 | Volume: 3 | Issue: 2 | Views: 2486 | Reviews: 0
Authors: Armin Jabbarzadeh
Keywords: Contractor selection, AHP, TOPSIS
Journal: JPM | Year: 2018 | Volume: 3 | Issue: 2 | Views: 3435 | Reviews: 0
Authors: Ahmad Makui, Pooria Moein Zadeh, Morteza Bagherpour, Armin Jabbarzadeh
DOI: 10.5267/j.jpm.2017.12.001
Keywords: Structural equation modeling, Project Management, Project Complexity, Competency Standards, Project Manager
Journal: JPM | Year: 2018 | Volume: 3 | Issue: 1 | Views: 2360 | Reviews: 0
Authors: Saheed Akande, Ayodeji Emmanuel Oluleye, Elkanah Oyetunji
DOI: 10.5267/j.jpm.2017.11.001
Keywords: Heuristics, Branch and Bound, Total Tardiness, Efficient solution, Effective
Journal: JPM | Year: 2018 | Volume: 3 | Issue: 1 | Views: 1407 | Reviews: 0
Authors: P. Hashemi, R. Yazdanparast, A. Ghavamifar, A. Azadeh
DOI: 10.5267/j.jpm.2017.10.002
Keywords: Resilience engineering, Construction project manage-ment, Performance assessment, Artificial neural networks, Job security
Journal: JPM | Year: 2018 | Volume: 3 | Issue: 1 | Views: 1828 | Reviews: 0
Authors: V.K. Chawla, Arindam Kumar Chanda, Surjit Angra
DOI: 10.5267/j.jpm.2017.10.001
Keywords: Flexible Manufacturing System, Memetic Algorithm, Modified Memetic Particle Swarm Optimization, Multi Load AGVs, Particle Swarm Optimization, Scheduling
Journal: JPM | Year: 2018 | Volume: 3 | Issue: 1 | Views: 2476 | Reviews: 0
® 2010-2024 GrowingScience.Com