How to cite this paper
Piya, S. (2015). Dealing with customers enquiries simultaneously under contingent situation.International Journal of Industrial Engineering Computations , 6(3), 391-404.
Refrences
Bac, M. (2001). On creating and claiming value in negotiations. Group Decision and Negotiation, 10(3), 237-251.
Baker, K. R. (1984). Sequencing rules and due-date assignments in a job shop. Management science, 30(9), 1093-1104.
Bertrand, J. W. M. (1983). The effect of workload dependent due-dates on job shop performance. Management Science, 29(7), 799-816.
Cakravastia, A., & Nakamura, N. (2002). Model for negotiating the price and due date for a single order with multiple suppliers in a make-to-order environment. International journal of production research, 40(14), 3425-3440.
Cakravastia, A., & Takahashi, K. (2003). Integrated bidding and manufacturing planning decisions with contingent orders in a make-to-order environment. Journal of JIMA, 54(5), 291-301.
Chaharsooghi, S. K., Honarvar, M., Modarres, M., & Kamalabadi, I. N. (2011). Developing a two stage stochastic programming model of the price and lead-time decision problem in the multi-class make-to-order firm. Computers & Industrial Engineering, 61(4), 1086-1097.
Chand, S., & Chhajed, D. (1992). A single machine model for determination of optimal due dates and sequence. Operations Research, 40(3), 596-602.
Charnsirisakskul, K., Griffin, P. M., & Keskinocak, P. (2006). Pricing and scheduling decisions with leadtime flexibility. European Journal of Operational Research, 171(1), 153-169.
Corti, D., Pozzetti, A., & Zorzini, M. (2006). A capacity-driven approach to establish reliable due dates in a MTO environment. International Journal of Production Economics, 104(2), 536-554.
Easton, F. F., & Moodie, D. R. (1999). Pricing and lead time decisions for make-to-order firms with contingent orders. European Journal of Operational Research, 116(2), 305-318.
ElHafsi, M. (2000). An operational decision model for lead-time and price quotation in congested manufacturing systems. European Journal of Operational Research, 126(2), 355-370.
Enns, S. T. (1995). An economic approach to job shop performance analysis. International journal of production economics, 38(2-3), 117-131.
Kaminsky, P., & Kaya, O. (2008). Scheduling and due?date quotation in a make?to?order supply chain. Naval Research Logistics (NRL), 55(5), 444-458.
Keskinocak, P., Ravi, R., & Tayur, S. (2001). Scheduling and reliable lead-time quotation for orders with availability intervals and lead-time sensitive revenues. Management Science, 47(2), 264-279.
Lawrence, S. R. (1995). Estimating flowtimes and setting due-dates in complex production systems. IIE transactions, 27(5), 657-668.
Liu, L., Parlar, M., & Zhu, S. X. (2007). Pricing and lead time decisions in decentralized supply chains. Management Science, 53(5), 713-725.
Moodie, D. R., & Bobrowski, P. M. (1999). Due date demand management: negotiating the trade-off between price and delivery. International Journal of Production Research, 37(5), 997-1021.
Piya, S., Takahashi, K. & Morikawa, K. (2009a), Introducing quotation and negotiation structure in the order acceptance decision model. International Journal of Operations and Quantitative Management, 15 (4), 293-318.
Piya, S., Takahashi, K., & Morikawa, K. (2009b), Quotation and capacity planning with contingent orders in make-to-order system. Proceeding of 20th International Conference on Production Research, Shanghai, China. (in CD-ROM).
Piya, S., Takahashi, K., & Morikawa, K. (2010). Negotiation with Customer Priority and Dynamic Aspiration Level for Order Acceptance Decision. Australian Society for Operations Research Bulletin, 29 (4), 21-47.
Ragatz, G. L., & Mabert, V. A. (1984). A framework for the study of due date management in job shops. The International Journal of Production Research, 22(4), 685-695.
Seidmann, A., & Smith, M. L. (1981). Due date assignment for production systems. Management Science, 27(5), 571-581.
Shantikumar, J. G., & Sumita, U. (1988). Approximations for the time spent in a dynamic job shop with applications to due-date assignment. The International Journal of Production Research, 26(8), 1329-1352.
Slotnick, S. A. (2011). Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size. European Journal of Operational Research, 210(3), 527-536.
Sujan, P., Takahashi, K., & Morikawa, K. (2009). Introducing quotation and negotiation structure in the order acceptance decision model. International Journal of Operations and Quantitative Management, 15 (4), 293-318.
Van Delft, A., & Nijkamp, P. (1977). Multi-criteria analysis and regional decision-making (Vol. 8). Springer.
Van Ooijen, H. P. G., & Bertrand, J. W. M. (2001). Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions. International Journal of Production Economics, 74(1), 261-268.
Watanapa, B., & Techanitisawad, A. (2005a). Simultaneous price and due date settings for multiple customer classes. European Journal of Operational Research, 166(2), 351-368.
Watanapa, B., & Techanitisawad, A. (2005b). A genetic algorithm for the multi-class contingent bidding model. OR Spectrum, 27(4), 525-549.
Wein, L. M. (1991). Due-date setting and priority sequencing in a multiclass M/G/1 queue. Management Science, 37(7), 834-850.
Xianfei, J., Kunpeng, L., & Appa, I.S. (2013). Scheduling and optimal delivery time quotation for the customers with time sensitive demand. International Journal of Production Economics, 145(1), 349- 358.
Zorzini, M., Corti, D., & Pozzetti, A. (2008). Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis. International Journal of Production Economics, 112(2), 919-933.
Baker, K. R. (1984). Sequencing rules and due-date assignments in a job shop. Management science, 30(9), 1093-1104.
Bertrand, J. W. M. (1983). The effect of workload dependent due-dates on job shop performance. Management Science, 29(7), 799-816.
Cakravastia, A., & Nakamura, N. (2002). Model for negotiating the price and due date for a single order with multiple suppliers in a make-to-order environment. International journal of production research, 40(14), 3425-3440.
Cakravastia, A., & Takahashi, K. (2003). Integrated bidding and manufacturing planning decisions with contingent orders in a make-to-order environment. Journal of JIMA, 54(5), 291-301.
Chaharsooghi, S. K., Honarvar, M., Modarres, M., & Kamalabadi, I. N. (2011). Developing a two stage stochastic programming model of the price and lead-time decision problem in the multi-class make-to-order firm. Computers & Industrial Engineering, 61(4), 1086-1097.
Chand, S., & Chhajed, D. (1992). A single machine model for determination of optimal due dates and sequence. Operations Research, 40(3), 596-602.
Charnsirisakskul, K., Griffin, P. M., & Keskinocak, P. (2006). Pricing and scheduling decisions with leadtime flexibility. European Journal of Operational Research, 171(1), 153-169.
Corti, D., Pozzetti, A., & Zorzini, M. (2006). A capacity-driven approach to establish reliable due dates in a MTO environment. International Journal of Production Economics, 104(2), 536-554.
Easton, F. F., & Moodie, D. R. (1999). Pricing and lead time decisions for make-to-order firms with contingent orders. European Journal of Operational Research, 116(2), 305-318.
ElHafsi, M. (2000). An operational decision model for lead-time and price quotation in congested manufacturing systems. European Journal of Operational Research, 126(2), 355-370.
Enns, S. T. (1995). An economic approach to job shop performance analysis. International journal of production economics, 38(2-3), 117-131.
Kaminsky, P., & Kaya, O. (2008). Scheduling and due?date quotation in a make?to?order supply chain. Naval Research Logistics (NRL), 55(5), 444-458.
Keskinocak, P., Ravi, R., & Tayur, S. (2001). Scheduling and reliable lead-time quotation for orders with availability intervals and lead-time sensitive revenues. Management Science, 47(2), 264-279.
Lawrence, S. R. (1995). Estimating flowtimes and setting due-dates in complex production systems. IIE transactions, 27(5), 657-668.
Liu, L., Parlar, M., & Zhu, S. X. (2007). Pricing and lead time decisions in decentralized supply chains. Management Science, 53(5), 713-725.
Moodie, D. R., & Bobrowski, P. M. (1999). Due date demand management: negotiating the trade-off between price and delivery. International Journal of Production Research, 37(5), 997-1021.
Piya, S., Takahashi, K. & Morikawa, K. (2009a), Introducing quotation and negotiation structure in the order acceptance decision model. International Journal of Operations and Quantitative Management, 15 (4), 293-318.
Piya, S., Takahashi, K., & Morikawa, K. (2009b), Quotation and capacity planning with contingent orders in make-to-order system. Proceeding of 20th International Conference on Production Research, Shanghai, China. (in CD-ROM).
Piya, S., Takahashi, K., & Morikawa, K. (2010). Negotiation with Customer Priority and Dynamic Aspiration Level for Order Acceptance Decision. Australian Society for Operations Research Bulletin, 29 (4), 21-47.
Ragatz, G. L., & Mabert, V. A. (1984). A framework for the study of due date management in job shops. The International Journal of Production Research, 22(4), 685-695.
Seidmann, A., & Smith, M. L. (1981). Due date assignment for production systems. Management Science, 27(5), 571-581.
Shantikumar, J. G., & Sumita, U. (1988). Approximations for the time spent in a dynamic job shop with applications to due-date assignment. The International Journal of Production Research, 26(8), 1329-1352.
Slotnick, S. A. (2011). Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size. European Journal of Operational Research, 210(3), 527-536.
Sujan, P., Takahashi, K., & Morikawa, K. (2009). Introducing quotation and negotiation structure in the order acceptance decision model. International Journal of Operations and Quantitative Management, 15 (4), 293-318.
Van Delft, A., & Nijkamp, P. (1977). Multi-criteria analysis and regional decision-making (Vol. 8). Springer.
Van Ooijen, H. P. G., & Bertrand, J. W. M. (2001). Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions. International Journal of Production Economics, 74(1), 261-268.
Watanapa, B., & Techanitisawad, A. (2005a). Simultaneous price and due date settings for multiple customer classes. European Journal of Operational Research, 166(2), 351-368.
Watanapa, B., & Techanitisawad, A. (2005b). A genetic algorithm for the multi-class contingent bidding model. OR Spectrum, 27(4), 525-549.
Wein, L. M. (1991). Due-date setting and priority sequencing in a multiclass M/G/1 queue. Management Science, 37(7), 834-850.
Xianfei, J., Kunpeng, L., & Appa, I.S. (2013). Scheduling and optimal delivery time quotation for the customers with time sensitive demand. International Journal of Production Economics, 145(1), 349- 358.
Zorzini, M., Corti, D., & Pozzetti, A. (2008). Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis. International Journal of Production Economics, 112(2), 919-933.