Authors: K. A. Halim, B. C. Giri, K. S. Chaudhuri
DOI: 10.5267/j.ijiec.2010.05.001
Keywords: Inventory, production planning, Imperfect production, Fuzzy number, Graded mean integration representation method
Journal: IJIEC | Year: 2011 | Volume: 2 | Issue: 1 | Views: 2387 | Reviews: 0
Authors: Soheil Sadi-Nezhad, Shima Memar Nahavandi, Jamshid Nazemi
DOI: 10.5267/j.ijiec.2010.05.001
Keywords: Fuzzy inventory, Periodic review inventory model, Continuous review inventory model Signed distance method
Journal: IJIEC | Year: 2011 | Volume: 2 | Issue: 1 | Views: 2850 | Reviews: 0
Authors: Seyed Ahmad Yazdian, Kamran Shahanaghi
DOI: 10.5267/j.ijiec.2010.03.003
Keywords: Facility location, Distribution center, Supply chain, Fuzzy number, Possibilistic programming
Journal: IJIEC | Year: 2011 | Volume: 2 | Issue: 1 | Views: 2337 | Reviews: 0
Authors: Tam Bang Vu, Eric Iksoon Im
DOI: 10.5267/j.ijiec.2010.04.003
Keywords: Model specification, Approximations, Box-Cox test, US-China study
Journal: IJIEC | Year: 2011 | Volume: 2 | Issue: 1 | Views: 1834 | Reviews: 0
Authors: Thang Diep, Jean-Pierre Kenné, Thien-My Dao
DOI: 10.5267/j.ijiec.2010.02.001
Keywords: Semi-Markov process, Optimality conditions, Flow-shop system, Numerical method, Heuristic method
Journal: IJIEC | Year: 2010 | Volume: 1 | Issue: 2 | Views: 1931 | Reviews: 0
Authors: Maryam Mokhlesian, Seyyed Mohammad Taghi Fatemi Ghomi, Fariborz Jolai
DOI: 10.5267/j.ijiec.2010.02.002
Keywords: Economic lot scheduling problem, Discount cash flow, Genetic algorithm, Sequence dependent, Hybrid method, Metaheuristic
Journal: IJIEC | Year: 2010 | Volume: 1 | Issue: 2 | Views: 2203 | Reviews: 0
Authors: Dilip Roy, Debdip khan
DOI: 10.5267/j.ijiec.2010.02.003
Keywords: Supply chain, Assembly Line, Balancing Loss, Market Demand, Line Balancing
Journal: IJIEC | Year: 2010 | Volume: 1 | Issue: 2 | Views: 1902 | Reviews: 0
Authors: Mohammad Mahavi Mazdeh, Farzad Zaerpour, Farzad Firouzi Jahantigh
DOI: 10.5267/j.ijiec.2010.02.004
Keywords: Scheduling, Sequencing, Single machine, Work in process, Job deterioration, Bi-objective, Fuzzy decision making
Journal: IJIEC | Year: 2010 | Volume: 1 | Issue: 2 | Views: 2229 | Reviews: 0
Authors: Yee Ming Chen, Wen-Shiang Wang
DOI: 10.5267/j.ijiec.2010.02.005
Keywords: Meta-heuristic, Particle swarm optimization, Economic dispatch, Emission controlled, Unit commitment, Multi-objective optimization
Journal: IJIEC | Year: 2010 | Volume: 1 | Issue: 2 | Views: 3313 | Reviews: 0
Authors: Mohammad Modarres, Soheil Sadi-Nezhad, Arabi Arabi
DOI: 10.5267/j.ijiec.2010.02.006
Keywords: FAHP, Preference ratio, MADM, Fuzzy numbers, Consistency ratio, AHP
Journal: IJIEC | Year: 2010 | Volume: 1 | Issue: 2 | Views: 2263 | Reviews: 0
® 2010-2024 GrowingScience.Com