How to cite this paper
Lin, H., Chiu, T., Hwang, M & Chiu, Y. (2022). Multi-item fabrication-shipment decision model featuring multi-delivery, postponement, quality assurance, and overtime.Uncertain Supply Chain Management, 10(3), 1041-1054.
Refrences
Abukhader, K.M.S., & Onbaşıoğlu, D.Ç. (2021). The effects of total quality management practices on employee performance and the effect of training as a moderating variable. Uncertain Supply Chain Management, 9(3), 521-528.
Budiman, S.D., & Rau, H. (2019). A mixed-integer model for the implementation of postponement strategies in the globalized green supply chain network. Computers and Industrial Engineering, 137, Art. No. 106054.
Chiu, S.W., Kuo, J-S., Chiu, V., & Chiu, Y-S.P. (2016). Cost minimization for a multi-product fabrication-distribution problem with commonality, postponement, and quality assurance. Mathematical and Computational Applications, 21(3), Art. No. 38, 1-17.
Chiu, Y.-S.P., Chang, H.-H., Chiu, T., & Chiu, S.W. (2021). A multi-item batch fabrication problem featuring delayed product differentiation, outsourcing, and quality assurance. International Journal of Industrial Engineering Computations, 12(1), 63-78.
Conway, N., & Sturges, J. (2014). Investigating unpaid overtime working among the part-time workforce. British Journal of Management, 25(4), 755-771.
Duan, J., Li, H., & Zhang, Q. (2021) Multiobjective optimization of buffer capacity allocation in multiproduct unreliable production lines using improved adaptive NSGA-II algorithm. Kuwait Journal of Science, 48(1), 72-84.
Farmand, N., Zarei, H., & Rasti-Barzoki, M. (2021). Two meta-heuristic algorithms for optimizing a multi-objective supply chain scheduling problem in an identical parallel machines environment. International Journal of Industrial Engineering Computations, 12(3), 249-272.
Glock, C.H., & Jaber, M.Y. (2013) A multi-stage production-inventory model with learning and forgetting effects, rework and scrap. Computers and Industrial Engineering, 64(2), 708-720.
Graman, G.A., & Magazine, M.J. (2002). A numerical analysis of capacitated postponement, Production and Operations Management, 11(3), 340-356.
Guericke, S., Koberstein, A., Schwartz, F., & Voß, S. (2012). A stochastic model for the implementation of postponement strategies in global distribution networks. Decision Support Systems, 53, 294-305.
Jeunet, J., & Bou Orm, M. (2020). Optimizing temporary work and overtime in the time cost quality trade-off oroblem. European Journal of Operational Research, 284, 743-761.
Jha, J.K., & Shanker, K. (2013) Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints. Applied Mathematical Modelling, 37(4), 1753-1767.
Keyvanshokooh, E., Shi, C., & van Oyen, M.P. (2021). Online advance scheduling with overtime: A primal-dual approach. Manufacturing and Service Operations Management, 23(1), 246-266.
Krishnan, V., & Ulrich, K.T. (2001) Product development decisions: A review of the literature, Management Science, 47(1), 1-21.
Lambooij, M., Flache, A., Sanders, K., & Siegers, J. (2007). Encouraging employees to co-operate: The effects of sponsored training and promotion practices on employees' willingness to work overtime. International Journal of Human Resource Management, 18(10), 1748-1767.
Mabrouk, N.B. (2020). Green supplier selection using fuzzy Delphi method for developing sustainable supply chain. Decision Science Letters, 10 (1), 63-70.
Moin, C.J., Iqbal, M., Malek, A.B.M.A., & Haque, R. (2020). Time-based process mapping for lead time compression in the apparel supply chain: A case study. International Journal of Mathematical, Engineering and Management Sciences, 5(1), 96-107.
Moussawi-Haidar, L., Salameh, M., & Nasr, W. (2016). Production lot sizing with quality screening and rework. Applied Mathematical Modelling 40(4), 3242-3256.
Nahmias, S. (2009). Production & Operations Analysis. McGraw-Hill Inc. New York.
Nogueira, T.H., Bettoni, A.B., Mendes, G.T.D.O., dos Santos, A.G., & Ravetti, M.G. (2020). Problem on the integration between production and delivery with parallel batching machines of generic job sizes and processing times. Computers and Industrial Engineering, 146, Art. No. 106573.
Polotski, V., Kenné, J.-P., & Gharbi, A. (2019). Production control of hybrid manufacturing–remanufacturing systems under demand and return variations. International Journal of Production Research, 57(1), 100-123.
Rardin R.L. (1998). Optimization in Operations Research. Prentice-Hall, New Jersey, USA.
Sahebi, I.G., Masoomi, B., Ghorbani, S., & Uslu, T. (2019). Scenario-based designing of closed-loop supply chain with uncertainty in returned products. Decision Science Letters, 8 (4), 505-518.
Singamsetty, P., & Thenepalle, J.K. (2021). Designing optimal route for the distribution chain of a rural LPG delivery system. International Journal of Industrial Engineering Computations, 12(2), 221-234.
Singer, M., & Obach, J.J. (2013). Listening to workers: The overtime versus hiring dilemma. Journal of Business Research, 66 (10), 1771-1779.
Singh, A. (2003) Accelerated work-schedule design considering efficiency losses for overtime and overmanning. Engineering, Construction and Architectural Management, 10(5), 312-321.
Son, N.H., & Van Hop, N. (2021). A hybrid meta-heuristics approach for supplier selection and order allocation problem for supplying risks of recyclable raw materials. International Journal of Industrial Engineering Computations, 12(2), 177-190.
Soriano, J., Jalao, E.R., & Martinez, I.A. (2020). Integrated employee scheduling with known employee demand, including breaks, overtime, and employee preferences. Journal of Industrial Engineering and Management, 13(3), 451-463
Sumrit, D. (2020). Supplier selection for vendor-managed inventory in healthcare using fuzzy multi-criteria decision-making approach. Decision Science Letters, 9(2), 233-256.
Tran, M.D., Phan, T.T.H., Ha, H.H., & Hoang, T.T.H. (2020). The impact of supply chain quality integration on green supply chain management and environmental performance in Vietnam’s tourism industries. Uncertain Supply Chain Management, 8(4), 693-704.
Ullah, M., & Sarkar, B. (2020). Recovery-channel selection in a hybrid manufacturing- remanufacturing production model with RFID and product quality. International Journal of Production Economics, 219, 360-374.
Van Mieghem, J.A. (2004) Note - Commonality Strategies: Value Drivers and Equivalence with Flexible Capacity and Inventory Substitution, Management Science, 50(3), 419-424.
Weber, T.A. (2008) Delayed multiattribute product differentiation, Decision Support Systems, 44(2), 447-468.
Budiman, S.D., & Rau, H. (2019). A mixed-integer model for the implementation of postponement strategies in the globalized green supply chain network. Computers and Industrial Engineering, 137, Art. No. 106054.
Chiu, S.W., Kuo, J-S., Chiu, V., & Chiu, Y-S.P. (2016). Cost minimization for a multi-product fabrication-distribution problem with commonality, postponement, and quality assurance. Mathematical and Computational Applications, 21(3), Art. No. 38, 1-17.
Chiu, Y.-S.P., Chang, H.-H., Chiu, T., & Chiu, S.W. (2021). A multi-item batch fabrication problem featuring delayed product differentiation, outsourcing, and quality assurance. International Journal of Industrial Engineering Computations, 12(1), 63-78.
Conway, N., & Sturges, J. (2014). Investigating unpaid overtime working among the part-time workforce. British Journal of Management, 25(4), 755-771.
Duan, J., Li, H., & Zhang, Q. (2021) Multiobjective optimization of buffer capacity allocation in multiproduct unreliable production lines using improved adaptive NSGA-II algorithm. Kuwait Journal of Science, 48(1), 72-84.
Farmand, N., Zarei, H., & Rasti-Barzoki, M. (2021). Two meta-heuristic algorithms for optimizing a multi-objective supply chain scheduling problem in an identical parallel machines environment. International Journal of Industrial Engineering Computations, 12(3), 249-272.
Glock, C.H., & Jaber, M.Y. (2013) A multi-stage production-inventory model with learning and forgetting effects, rework and scrap. Computers and Industrial Engineering, 64(2), 708-720.
Graman, G.A., & Magazine, M.J. (2002). A numerical analysis of capacitated postponement, Production and Operations Management, 11(3), 340-356.
Guericke, S., Koberstein, A., Schwartz, F., & Voß, S. (2012). A stochastic model for the implementation of postponement strategies in global distribution networks. Decision Support Systems, 53, 294-305.
Jeunet, J., & Bou Orm, M. (2020). Optimizing temporary work and overtime in the time cost quality trade-off oroblem. European Journal of Operational Research, 284, 743-761.
Jha, J.K., & Shanker, K. (2013) Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints. Applied Mathematical Modelling, 37(4), 1753-1767.
Keyvanshokooh, E., Shi, C., & van Oyen, M.P. (2021). Online advance scheduling with overtime: A primal-dual approach. Manufacturing and Service Operations Management, 23(1), 246-266.
Krishnan, V., & Ulrich, K.T. (2001) Product development decisions: A review of the literature, Management Science, 47(1), 1-21.
Lambooij, M., Flache, A., Sanders, K., & Siegers, J. (2007). Encouraging employees to co-operate: The effects of sponsored training and promotion practices on employees' willingness to work overtime. International Journal of Human Resource Management, 18(10), 1748-1767.
Mabrouk, N.B. (2020). Green supplier selection using fuzzy Delphi method for developing sustainable supply chain. Decision Science Letters, 10 (1), 63-70.
Moin, C.J., Iqbal, M., Malek, A.B.M.A., & Haque, R. (2020). Time-based process mapping for lead time compression in the apparel supply chain: A case study. International Journal of Mathematical, Engineering and Management Sciences, 5(1), 96-107.
Moussawi-Haidar, L., Salameh, M., & Nasr, W. (2016). Production lot sizing with quality screening and rework. Applied Mathematical Modelling 40(4), 3242-3256.
Nahmias, S. (2009). Production & Operations Analysis. McGraw-Hill Inc. New York.
Nogueira, T.H., Bettoni, A.B., Mendes, G.T.D.O., dos Santos, A.G., & Ravetti, M.G. (2020). Problem on the integration between production and delivery with parallel batching machines of generic job sizes and processing times. Computers and Industrial Engineering, 146, Art. No. 106573.
Polotski, V., Kenné, J.-P., & Gharbi, A. (2019). Production control of hybrid manufacturing–remanufacturing systems under demand and return variations. International Journal of Production Research, 57(1), 100-123.
Rardin R.L. (1998). Optimization in Operations Research. Prentice-Hall, New Jersey, USA.
Sahebi, I.G., Masoomi, B., Ghorbani, S., & Uslu, T. (2019). Scenario-based designing of closed-loop supply chain with uncertainty in returned products. Decision Science Letters, 8 (4), 505-518.
Singamsetty, P., & Thenepalle, J.K. (2021). Designing optimal route for the distribution chain of a rural LPG delivery system. International Journal of Industrial Engineering Computations, 12(2), 221-234.
Singer, M., & Obach, J.J. (2013). Listening to workers: The overtime versus hiring dilemma. Journal of Business Research, 66 (10), 1771-1779.
Singh, A. (2003) Accelerated work-schedule design considering efficiency losses for overtime and overmanning. Engineering, Construction and Architectural Management, 10(5), 312-321.
Son, N.H., & Van Hop, N. (2021). A hybrid meta-heuristics approach for supplier selection and order allocation problem for supplying risks of recyclable raw materials. International Journal of Industrial Engineering Computations, 12(2), 177-190.
Soriano, J., Jalao, E.R., & Martinez, I.A. (2020). Integrated employee scheduling with known employee demand, including breaks, overtime, and employee preferences. Journal of Industrial Engineering and Management, 13(3), 451-463
Sumrit, D. (2020). Supplier selection for vendor-managed inventory in healthcare using fuzzy multi-criteria decision-making approach. Decision Science Letters, 9(2), 233-256.
Tran, M.D., Phan, T.T.H., Ha, H.H., & Hoang, T.T.H. (2020). The impact of supply chain quality integration on green supply chain management and environmental performance in Vietnam’s tourism industries. Uncertain Supply Chain Management, 8(4), 693-704.
Ullah, M., & Sarkar, B. (2020). Recovery-channel selection in a hybrid manufacturing- remanufacturing production model with RFID and product quality. International Journal of Production Economics, 219, 360-374.
Van Mieghem, J.A. (2004) Note - Commonality Strategies: Value Drivers and Equivalence with Flexible Capacity and Inventory Substitution, Management Science, 50(3), 419-424.
Weber, T.A. (2008) Delayed multiattribute product differentiation, Decision Support Systems, 44(2), 447-468.