How to cite this paper
Roy, D & Khan, D. (2011). A new type of problem to stabilize an assembly setup.Management Science Letters , 1(3), 271-278.
Refrences
Agarwal, S. and Tiwari, M. K. (2008). A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem. International Journal of Production Research, 46(6), 1405-1429.
Amasaka, K. and Sakai, H. (1996). Improving the reliability of body assembly line equipment. International Journal of Reliability, Quality and Safety Engineering, 3(1), 11-24.
Berger, I., et al. (1992). Branch-and-bound algorithms for the multi-product assembly line balancing problem. European Journal of Operations Research, 168, 694-715.
Bowman, E.H. (1960). Assembly Line Balancing by Linear Programming. Operations Research, 8(3), 385-389.
Bryton, B. (1954). Balancing of a continuous production line. M.Sc.Thesis, North-Western University.Bukchin, Y. and Rabinowitch, I. (2006). A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs. European Journal of Operational Research, 174, 492-508.
Charlton, J.M. & Death, C.C. (1969). A general method for Machine scheduling. International Journal of Production Research, 7, 207.
Chernyi, A. G. (2007 ). Probabilistic analysis of the performance of a synchronous assembly line. Russian Engineering Research, 27(4), 199-201.
Erel, E., Sabuncuoglu, I. and Sekerci, H. (2005). Stochastic assembly line balancing using beam search. International Journal of Production Research, 43(7), 1411-1426.
Gamberini, R., Gebennini, E., Grassi, A. and Regattieri, A. (2009). A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem. International Journal of Production Research, 47(8), 2141-2164.
Geoffrion & Arthur M. (1976). The purpose of mathematical programming is insight, not numbers. Interface, 7(1), 81-92.
Grabau, M.R., Maurer, R.A., & Ott., D.P. (1997). Using Simulation to Generate the Data to Balance an Assembly Line. In Proceeding of the 1997 Winter Simulation Conference, WSC ’97, Atlanta, GA, December 7-10, 733-738.
Graves, S.C. & Lamer, B.W. (1983). An integer programming procedure for assembly system design problems. Operations Research, 31, 522-545.
Gu, L., Hennequin, S., Sava, A. and Xie, X (2007) Assembly line balancing problem solved by estimation of distribution. Automation science and Engineering, IEEE International Conference.Helgerson, N.B. & Birnie, D.P. (1961). Assembly Line balancing using the ranked positional weight technique. Journal of Industrial Engineering, 11(6), 394.Hoffmann, T.R. (1963). Assembly line balancing with precedence matrix. Management Science, 9, 551-562.
Kilbridge, K. & Wester, L. (1961). A heuristic method of assembly line balancing. Journal of Industrial Engineering, 11(4), 292.Mansoor, E.M. & Yadin, M. (1971). On the problem of assembly line balancing. Development in Operations Research, edited by B. Avi-ltzhak, Gordon and Breach, New York, 361.
Mansoor, E.M. (1968). Assembly line balancing: A heuristic algorithm for variable operator performance levels. Journal of Industrial Engineering, 19, 618.
Moodie, C.L. & Young, H.H. (1965). A heuristic method of assembly line balancing assumptions of constant or variable work element times. Journal of Industrial Engineering, 16, 23-29.
Nevins, A.J. (1972). Assembly Line Balancing using Best Bud search. Management Science, 18(9), 530.Nicosia et al. (2002). Optimally balancing assembly lines with different workstations. Discrete Applied Mathematics, 118, 99-113.
Pinnoi, A. and Wilhelm, W.E. (1998). Assembly system design: A branch and cut approach. Management Science, 44, 103-118.
Roy, D. & Khan, D. (2010). Assembly line balancing to minimize balancing loss and system loss. Journal of Industrial Engineering International, 6(11), 1-5.
Roy, D. & Khan, D. (2011a). Optimum assembly line balancing: A stochastic programming approach. International Journal of Industrial Engineering Computation, 2(2011), 329-336.
Roy, D. & Khan, D. (2011b). Optimum assembly line balancing by minimizing balancing loss and a range based measure for system loss. Management Science Letters, 1(2011), 13-22.
Salveson, M.E. (1955). The assembly line balancing problem. Transaction of American Society of Mechanical Engineering, 939.
Sarin, S. C., & Erel, E. (1990). Development of cost model for the single-model stochastic assembly line balancing problem. International Journal of Production Research, 28(7), 1305-16.
Scholl, A. (1999). Balancing and Sequencing of Assembly Lines. 2nd Edition, Physica-verlag Heidelberg, ISBN 3-7908-1180-7.
Suhail, A. (1983). Reliability and optimization considerations in a conveyor-paced assembly line system. International Journal of Production Research, 21(5), 627 – 640.
Suresh, G. & Sahu, S. (1994). Stochastic assembly line balancing using simulated annealing. International Journal of Production Research, 32(8), 1801-1810.
Wild, R. (2004). Operation Management. Thomson, Singapore.
Zhao, X., Yeung, J.H.Y. and Xie, J. (2006). Sequence-to-customer goal with stochastic demands for a mixed-model assembly line. International Journal of Production Research, 44(24), 5279-5305.
Amasaka, K. and Sakai, H. (1996). Improving the reliability of body assembly line equipment. International Journal of Reliability, Quality and Safety Engineering, 3(1), 11-24.
Berger, I., et al. (1992). Branch-and-bound algorithms for the multi-product assembly line balancing problem. European Journal of Operations Research, 168, 694-715.
Bowman, E.H. (1960). Assembly Line Balancing by Linear Programming. Operations Research, 8(3), 385-389.
Bryton, B. (1954). Balancing of a continuous production line. M.Sc.Thesis, North-Western University.Bukchin, Y. and Rabinowitch, I. (2006). A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs. European Journal of Operational Research, 174, 492-508.
Charlton, J.M. & Death, C.C. (1969). A general method for Machine scheduling. International Journal of Production Research, 7, 207.
Chernyi, A. G. (2007 ). Probabilistic analysis of the performance of a synchronous assembly line. Russian Engineering Research, 27(4), 199-201.
Erel, E., Sabuncuoglu, I. and Sekerci, H. (2005). Stochastic assembly line balancing using beam search. International Journal of Production Research, 43(7), 1411-1426.
Gamberini, R., Gebennini, E., Grassi, A. and Regattieri, A. (2009). A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem. International Journal of Production Research, 47(8), 2141-2164.
Geoffrion & Arthur M. (1976). The purpose of mathematical programming is insight, not numbers. Interface, 7(1), 81-92.
Grabau, M.R., Maurer, R.A., & Ott., D.P. (1997). Using Simulation to Generate the Data to Balance an Assembly Line. In Proceeding of the 1997 Winter Simulation Conference, WSC ’97, Atlanta, GA, December 7-10, 733-738.
Graves, S.C. & Lamer, B.W. (1983). An integer programming procedure for assembly system design problems. Operations Research, 31, 522-545.
Gu, L., Hennequin, S., Sava, A. and Xie, X (2007) Assembly line balancing problem solved by estimation of distribution. Automation science and Engineering, IEEE International Conference.Helgerson, N.B. & Birnie, D.P. (1961). Assembly Line balancing using the ranked positional weight technique. Journal of Industrial Engineering, 11(6), 394.Hoffmann, T.R. (1963). Assembly line balancing with precedence matrix. Management Science, 9, 551-562.
Kilbridge, K. & Wester, L. (1961). A heuristic method of assembly line balancing. Journal of Industrial Engineering, 11(4), 292.Mansoor, E.M. & Yadin, M. (1971). On the problem of assembly line balancing. Development in Operations Research, edited by B. Avi-ltzhak, Gordon and Breach, New York, 361.
Mansoor, E.M. (1968). Assembly line balancing: A heuristic algorithm for variable operator performance levels. Journal of Industrial Engineering, 19, 618.
Moodie, C.L. & Young, H.H. (1965). A heuristic method of assembly line balancing assumptions of constant or variable work element times. Journal of Industrial Engineering, 16, 23-29.
Nevins, A.J. (1972). Assembly Line Balancing using Best Bud search. Management Science, 18(9), 530.Nicosia et al. (2002). Optimally balancing assembly lines with different workstations. Discrete Applied Mathematics, 118, 99-113.
Pinnoi, A. and Wilhelm, W.E. (1998). Assembly system design: A branch and cut approach. Management Science, 44, 103-118.
Roy, D. & Khan, D. (2010). Assembly line balancing to minimize balancing loss and system loss. Journal of Industrial Engineering International, 6(11), 1-5.
Roy, D. & Khan, D. (2011a). Optimum assembly line balancing: A stochastic programming approach. International Journal of Industrial Engineering Computation, 2(2011), 329-336.
Roy, D. & Khan, D. (2011b). Optimum assembly line balancing by minimizing balancing loss and a range based measure for system loss. Management Science Letters, 1(2011), 13-22.
Salveson, M.E. (1955). The assembly line balancing problem. Transaction of American Society of Mechanical Engineering, 939.
Sarin, S. C., & Erel, E. (1990). Development of cost model for the single-model stochastic assembly line balancing problem. International Journal of Production Research, 28(7), 1305-16.
Scholl, A. (1999). Balancing and Sequencing of Assembly Lines. 2nd Edition, Physica-verlag Heidelberg, ISBN 3-7908-1180-7.
Suhail, A. (1983). Reliability and optimization considerations in a conveyor-paced assembly line system. International Journal of Production Research, 21(5), 627 – 640.
Suresh, G. & Sahu, S. (1994). Stochastic assembly line balancing using simulated annealing. International Journal of Production Research, 32(8), 1801-1810.
Wild, R. (2004). Operation Management. Thomson, Singapore.
Zhao, X., Yeung, J.H.Y. and Xie, J. (2006). Sequence-to-customer goal with stochastic demands for a mixed-model assembly line. International Journal of Production Research, 44(24), 5279-5305.