How to cite this paper
Boctor, F., Zaatour, D & Renaud, J. (2024). Scheduling parallel extrusion lines.Journal of Project Management, 9(1), 1-16.
Refrences
Afzalirad, M., & Rezaeian J. (2016). Resource-constrained unrelated parallel machine scheduling problem with se-quence dependent setup times, precedence constraints and machine eligibility restrictions. Computers and Industrial Engineering, 98, 40-52.
Allahverdi A. (2015). The third comprehensive survey on scheduling problems with setup times/costs. European Jour-nal of Operational Research, 246(2), 345–378.
Bacalhau, J. B., & Cunha, T. M. (2017). Effect of NI content on the hardenability of bainitic steel for processing of plas-tics, 24th ABCM International Congress of Mechanical Engineering December 3-8, 2017, Curitiba, PR, Brazil.
Bean, J. (1994). Genetic algorithms and random keys for sequencing and optimization, INFORMS Journal on Compu-ting, 6(2), 154–160.
Bilge, Ü., Kiraç, F., Kurtulan, M., & Peküng P. (2004). A Tabu search algorithm for parallel machine total tardiness problem. Computers and operations research, 31(3), 397-414.
Bilyk, A., & Mönch, L. (2012). A variable neighborhood search approach for planning and scheduling of jobs on unrelated parallel machines, Journal of Intelligent Manufacturing, 23(10), 1621-1635.
Boctor, F.F. (1996). Resource-constrained project scheduling by simulated annealing, International Journal of Production Research, 34(8), 2335-2351.
Dastidar, S.G. & Nagi, R. (2005). Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs, Computers and Operations Research, 32(11), 2987-3005.
Fanjul-Peyro L. & Ruiz R. (2011) Size-reduction heuristics for the unrelated parallel machines scheduling problem. Computers and Operations Research, 38(1), 301-309.
Fanjul-Peyro L. (2020) Models and an exact method for the Unrelated Parallel Machine scheduling problem with setups and resources, Expert systems with application, 5, 1-15.
Framinan, J-M., Leisten R. & Ruiz Garcia R. (2014). Manufacturing Scheduling Systems. Springer.
Gokhale, R., & Mathirajan, M. (2012). Scheduling identical parallel machines with machine eligibility restrictions to minimize total weighted flow time in automobile gear manufacturing. International journal of Advanced Manufacturing Technology, 60, 1190-110.
Ko, H.H., Kim, J., Kim, S.S., & Beak J.G. (2010). Dispatching rule for non-identical parallel machines with sequence dependent setups and quality restrictions, Computers and Industrial Engineering, 59(3), 448-457.
Kramer, A., Lori, M., & Lacomme, Ph. (2021). Mathematical formulations for scheduling jobs on identical parallel machines with family setup times and total weighted completion time minimization, European Journal of Operational Research, 289(3), 464-474.
Lee, Y. H., & Pinedo, M. (1997). Scheduling jobs on parallel machines with sequence dependent setup times, European Journal of Operational Research, 100(3), 464-474.
Lee, J. Y., Kim, Y. D., & Lee, T.E. (2018). Minimizing total tardiness on parallel machines subject to flexible maintenance, International Journal of Industrial Engineering: Theory Applications and Practice, 25(4), 472- 489.
Logendran, R., McDonell, B., & Smucker, B. (2007). Scheduling unrelated parallel machines with sequence-dependent setups. Computers and operations research, 34(11), 3420 – 3438.
Mönch, L., Balasubramanian, H., Fowler, J. W., & Pfund, M. E. (2005). Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times, Computers and Operations Research, 32(11), 2731-2750.
Resende, M. G. C., & Ribeiro, C. C. (2008). Greedy Randomized adaptive search procedures: advances and applications, in Handbook of metaheuristics, Gendreau M. and Potvin J.Y. (eds.) Springer.
Rocha, P.L., Ravetti, M.G., Mateus, G.R. & Pardalos, P.M. (2008). Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times. Computers and Operations Research, 35(4), 1250 – 1264.
Rodriguez, F.J., Lozano, M., Blum, Ch., & Garcia-Martinez, C. (2013) An iterative greedy algorithm for the large-scale unrelated parallel machines scheduling problem. Computers and Operations Research, 40(6), 1829-1841.
Tavakkoli-Moghaddam, R., Taheri, F., Bazzazi, M., Izbad, M. & Sassani, F. (2009). Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup time and precedence constraints, Computers and Operations Research, 36(12), 3224-3230.
Unlu, Y., & Mason, S.J. (2010). Evaluation of mixed integer programming formulations for non-pre-emptive parallel machine scheduling problems, Computers and Industrial Engineering, 58(4), 785-800.
Wang, I.L., Wang, Y.C., & Chen, C.W. (2013). Scheduling unrelated parallel machines in semiconductors manufactur-ing by problem reduction and local search heuristics. Flexible Services and Manufacturing Journal, 25,343-366.
Wang, H., & Alidaee, B. (2019). Effective heuristic for large-scale unrelated parallel machines scheduling problem, Omega, 83(3), 261-274.
Wisner, J.D., & Siferd, S.P. (1995). A survey of US manufacturing practices in make-to-order machine shops. Produc-tion and Inventory Management Journal, 36(1), 1–7.
Allahverdi A. (2015). The third comprehensive survey on scheduling problems with setup times/costs. European Jour-nal of Operational Research, 246(2), 345–378.
Bacalhau, J. B., & Cunha, T. M. (2017). Effect of NI content on the hardenability of bainitic steel for processing of plas-tics, 24th ABCM International Congress of Mechanical Engineering December 3-8, 2017, Curitiba, PR, Brazil.
Bean, J. (1994). Genetic algorithms and random keys for sequencing and optimization, INFORMS Journal on Compu-ting, 6(2), 154–160.
Bilge, Ü., Kiraç, F., Kurtulan, M., & Peküng P. (2004). A Tabu search algorithm for parallel machine total tardiness problem. Computers and operations research, 31(3), 397-414.
Bilyk, A., & Mönch, L. (2012). A variable neighborhood search approach for planning and scheduling of jobs on unrelated parallel machines, Journal of Intelligent Manufacturing, 23(10), 1621-1635.
Boctor, F.F. (1996). Resource-constrained project scheduling by simulated annealing, International Journal of Production Research, 34(8), 2335-2351.
Dastidar, S.G. & Nagi, R. (2005). Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs, Computers and Operations Research, 32(11), 2987-3005.
Fanjul-Peyro L. & Ruiz R. (2011) Size-reduction heuristics for the unrelated parallel machines scheduling problem. Computers and Operations Research, 38(1), 301-309.
Fanjul-Peyro L. (2020) Models and an exact method for the Unrelated Parallel Machine scheduling problem with setups and resources, Expert systems with application, 5, 1-15.
Framinan, J-M., Leisten R. & Ruiz Garcia R. (2014). Manufacturing Scheduling Systems. Springer.
Gokhale, R., & Mathirajan, M. (2012). Scheduling identical parallel machines with machine eligibility restrictions to minimize total weighted flow time in automobile gear manufacturing. International journal of Advanced Manufacturing Technology, 60, 1190-110.
Ko, H.H., Kim, J., Kim, S.S., & Beak J.G. (2010). Dispatching rule for non-identical parallel machines with sequence dependent setups and quality restrictions, Computers and Industrial Engineering, 59(3), 448-457.
Kramer, A., Lori, M., & Lacomme, Ph. (2021). Mathematical formulations for scheduling jobs on identical parallel machines with family setup times and total weighted completion time minimization, European Journal of Operational Research, 289(3), 464-474.
Lee, Y. H., & Pinedo, M. (1997). Scheduling jobs on parallel machines with sequence dependent setup times, European Journal of Operational Research, 100(3), 464-474.
Lee, J. Y., Kim, Y. D., & Lee, T.E. (2018). Minimizing total tardiness on parallel machines subject to flexible maintenance, International Journal of Industrial Engineering: Theory Applications and Practice, 25(4), 472- 489.
Logendran, R., McDonell, B., & Smucker, B. (2007). Scheduling unrelated parallel machines with sequence-dependent setups. Computers and operations research, 34(11), 3420 – 3438.
Mönch, L., Balasubramanian, H., Fowler, J. W., & Pfund, M. E. (2005). Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times, Computers and Operations Research, 32(11), 2731-2750.
Resende, M. G. C., & Ribeiro, C. C. (2008). Greedy Randomized adaptive search procedures: advances and applications, in Handbook of metaheuristics, Gendreau M. and Potvin J.Y. (eds.) Springer.
Rocha, P.L., Ravetti, M.G., Mateus, G.R. & Pardalos, P.M. (2008). Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times. Computers and Operations Research, 35(4), 1250 – 1264.
Rodriguez, F.J., Lozano, M., Blum, Ch., & Garcia-Martinez, C. (2013) An iterative greedy algorithm for the large-scale unrelated parallel machines scheduling problem. Computers and Operations Research, 40(6), 1829-1841.
Tavakkoli-Moghaddam, R., Taheri, F., Bazzazi, M., Izbad, M. & Sassani, F. (2009). Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup time and precedence constraints, Computers and Operations Research, 36(12), 3224-3230.
Unlu, Y., & Mason, S.J. (2010). Evaluation of mixed integer programming formulations for non-pre-emptive parallel machine scheduling problems, Computers and Industrial Engineering, 58(4), 785-800.
Wang, I.L., Wang, Y.C., & Chen, C.W. (2013). Scheduling unrelated parallel machines in semiconductors manufactur-ing by problem reduction and local search heuristics. Flexible Services and Manufacturing Journal, 25,343-366.
Wang, H., & Alidaee, B. (2019). Effective heuristic for large-scale unrelated parallel machines scheduling problem, Omega, 83(3), 261-274.
Wisner, J.D., & Siferd, S.P. (1995). A survey of US manufacturing practices in make-to-order machine shops. Produc-tion and Inventory Management Journal, 36(1), 1–7.