How to cite this paper
Issa, S & Tu, Y. (2017). Integrated multi-resource planning and scheduling in engineering project.Journal of Project Management, 2(1), 11-26.
Refrences
Ahuja, H. N. (1976). Construction performance control by networks. New York; Toronto: Wiley.
Akpan, E. O. (2000). Resource smoothing: A cost minimization approach. Production Planning & Control, 11(8), 775-780.
Bandelloni, M., Tucci, M., & Rinaldi, R. (1994). Optimal resource leveling using non-serial dyanamic programming. European Journal of Operational Research, 78(2), 162-177.
Bell, C. E., & Park, K. (1990). Solving resource‐constrained project scheduling problems by a* search. Naval Research Logistics (NRL), 37(1), 61-84.
Burgess, A. R., & Killebrew, J. B. (1962). Variation in activity level on a cyclical arrow dia-gram. Journal of Industrial Engineering, 13(2), 76-83.
Burns, S. A., Liu, L., & Feng, C. W. (1996). The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management & Economics, 14(3), 265-276.
Chan, W. T., Chua, D. K., & Kannan, G. (1996). Construction resource scheduling with genetic algo-rithms. Journal of Construction Engineering and Management, 122(2), 125-132.
Christodoulou, S. E., Ellinas, G., & Michaelidou-Kamenou, A. (2009). Minimum moment method for resource leveling using entropy maximization. Journal of Construction Engineering and Manage-ment, 136(5), 518-527.
Chua, D. K. H., Chan, W. T., & Kannan, G. (1996). Scheduling with co-evolving resource availability profiles. Civil Engineering Systems, 13(4), 311-329.
Easa, S. M. (1989). Resource leveling in construction by optimization. Journal of construction engi-neering and management, 115(2), 302-316.
Elmaghraby, S. E. (1993). Resource allocation via dynamic programming in activity net-works. European Journal of Operational Research, 64(2), 199-215.
El-Rayes, K., & Jun, D. H. (2009). Optimizing resource leveling in construction projects. Journal of Construction Engineering and Management, 135(11), 1172-1180.
Feng, C. W., Liu, L., & Burns, S. A. (1997). Using genetic algorithms to solve construction time-cost trade-off problems. Journal of Computing in Civil Engineering, 11(3), 184-189.
Gagnon, M. (2004). A tabu search algorithm for the resource constrained project scheduling problem. In In Proceedings of Administrative Sciences Association of Canada Annual Conference (ASAC).
Harris, R. (1978). Resource and arrow networking techniques for construction.
Hariga, M., & El-Sayegh, S. M. (2010). Cost optimization model for the multiresource leveling prob-lem with allowed activity splitting. Journal of Construction Engineering and Management, 137(1), 56-64.
Hegazy, T. (1999). Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management, 125(3), 167-175.
Hiyassat, M. A. S. (2000). Modification of minimum moment approach in resource leveling. Journal of Construction Engineering and Management, 126(4), 278-284.
Hiyassat, M. A. S. (2001). Applying modified minimum moment method to multiple resource level-ing. Journal of Construction Engineering and Management, 127(3), 192-198.
Hossein Hashemi Doulabi, S., Seifi, A., & Shariat, S. Y. (2010). Efficient hybrid genetic algorithm for resource leveling via activity splitting. Journal of Construction Engineering and Manage-ment, 137(2), 137-146.
Karaa, F. A., & Nasr, A. Y. (1986). Resource management in construction. Journal of Construction Engineering and Management, 112(3), 346-357.
Lee, H., & Kim, S. S. (2001). Integration of process planning and scheduling using simulation based genetic algorithms. The International Journal of Advanced Manufacturing Technology, 18(8), 586-590.
Mattila, K. G., & Abraham, D. M. (1998). Resource leveling of linear schedules using integer linear programming. Journal of Construction Engineering and Management, 124(3), 232-244.
Myers, K. L., & Smith, S. F. (1999, November). Issues in the integration of planning and scheduling for enterprise control. In Proc. DARPA Symposium on Advances in Enterprise Control.
Senouci, A. B., & Adeli, H. (2001). Resource scheduling using neural dynamics model of Adeli and Park. Journal of Construction Engineering and Management, 127(1), 28-34.
Senouci, A. B., & Eldin, N. N. (2004). Use of genetic algorithms in resource scheduling of construc-tion projects. Journal of Construction Engineering and Management, 130(6), 869-877.
Shanmuganayagam, V. (1989). Current float techniques for resources scheduling. Journal of Con-struction Engineering and Management, 115(3), 401-411.
Son, J., & Mattila, K. G. (2004). Binary resource leveling model: Activity splitting allowed. Journal of Construction Engineering and Mmanagement, 130(6), 887-894.
Son, J., & Skibniewski, M. J. (1999). Multiheuristic approach for resource leveling problem in con-struction engineering: Hybrid approach. Journal of Construction Engineering and Manage-ment, 125(1), 23-31.
Akpan, E. O. (2000). Resource smoothing: A cost minimization approach. Production Planning & Control, 11(8), 775-780.
Bandelloni, M., Tucci, M., & Rinaldi, R. (1994). Optimal resource leveling using non-serial dyanamic programming. European Journal of Operational Research, 78(2), 162-177.
Bell, C. E., & Park, K. (1990). Solving resource‐constrained project scheduling problems by a* search. Naval Research Logistics (NRL), 37(1), 61-84.
Burgess, A. R., & Killebrew, J. B. (1962). Variation in activity level on a cyclical arrow dia-gram. Journal of Industrial Engineering, 13(2), 76-83.
Burns, S. A., Liu, L., & Feng, C. W. (1996). The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management & Economics, 14(3), 265-276.
Chan, W. T., Chua, D. K., & Kannan, G. (1996). Construction resource scheduling with genetic algo-rithms. Journal of Construction Engineering and Management, 122(2), 125-132.
Christodoulou, S. E., Ellinas, G., & Michaelidou-Kamenou, A. (2009). Minimum moment method for resource leveling using entropy maximization. Journal of Construction Engineering and Manage-ment, 136(5), 518-527.
Chua, D. K. H., Chan, W. T., & Kannan, G. (1996). Scheduling with co-evolving resource availability profiles. Civil Engineering Systems, 13(4), 311-329.
Easa, S. M. (1989). Resource leveling in construction by optimization. Journal of construction engi-neering and management, 115(2), 302-316.
Elmaghraby, S. E. (1993). Resource allocation via dynamic programming in activity net-works. European Journal of Operational Research, 64(2), 199-215.
El-Rayes, K., & Jun, D. H. (2009). Optimizing resource leveling in construction projects. Journal of Construction Engineering and Management, 135(11), 1172-1180.
Feng, C. W., Liu, L., & Burns, S. A. (1997). Using genetic algorithms to solve construction time-cost trade-off problems. Journal of Computing in Civil Engineering, 11(3), 184-189.
Gagnon, M. (2004). A tabu search algorithm for the resource constrained project scheduling problem. In In Proceedings of Administrative Sciences Association of Canada Annual Conference (ASAC).
Harris, R. (1978). Resource and arrow networking techniques for construction.
Hariga, M., & El-Sayegh, S. M. (2010). Cost optimization model for the multiresource leveling prob-lem with allowed activity splitting. Journal of Construction Engineering and Management, 137(1), 56-64.
Hegazy, T. (1999). Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management, 125(3), 167-175.
Hiyassat, M. A. S. (2000). Modification of minimum moment approach in resource leveling. Journal of Construction Engineering and Management, 126(4), 278-284.
Hiyassat, M. A. S. (2001). Applying modified minimum moment method to multiple resource level-ing. Journal of Construction Engineering and Management, 127(3), 192-198.
Hossein Hashemi Doulabi, S., Seifi, A., & Shariat, S. Y. (2010). Efficient hybrid genetic algorithm for resource leveling via activity splitting. Journal of Construction Engineering and Manage-ment, 137(2), 137-146.
Karaa, F. A., & Nasr, A. Y. (1986). Resource management in construction. Journal of Construction Engineering and Management, 112(3), 346-357.
Lee, H., & Kim, S. S. (2001). Integration of process planning and scheduling using simulation based genetic algorithms. The International Journal of Advanced Manufacturing Technology, 18(8), 586-590.
Mattila, K. G., & Abraham, D. M. (1998). Resource leveling of linear schedules using integer linear programming. Journal of Construction Engineering and Management, 124(3), 232-244.
Myers, K. L., & Smith, S. F. (1999, November). Issues in the integration of planning and scheduling for enterprise control. In Proc. DARPA Symposium on Advances in Enterprise Control.
Senouci, A. B., & Adeli, H. (2001). Resource scheduling using neural dynamics model of Adeli and Park. Journal of Construction Engineering and Management, 127(1), 28-34.
Senouci, A. B., & Eldin, N. N. (2004). Use of genetic algorithms in resource scheduling of construc-tion projects. Journal of Construction Engineering and Management, 130(6), 869-877.
Shanmuganayagam, V. (1989). Current float techniques for resources scheduling. Journal of Con-struction Engineering and Management, 115(3), 401-411.
Son, J., & Mattila, K. G. (2004). Binary resource leveling model: Activity splitting allowed. Journal of Construction Engineering and Mmanagement, 130(6), 887-894.
Son, J., & Skibniewski, M. J. (1999). Multiheuristic approach for resource leveling problem in con-struction engineering: Hybrid approach. Journal of Construction Engineering and Manage-ment, 125(1), 23-31.