How to cite this paper
Alvarez, G. (2023). Analysis of large-scale droughts in the energy field by using mathematical programming: The case of the Paraná River basin.Journal of Future Sustainability, 3(4), 183-200.
Refrences
Allaham, H., & Dalalah, D. (2022). MILP of multitask scheduling of geographically distributed maintenance tasks. International Journal of Industrial Engineering Computations, 13(1), 119-134.
https://doi.org/10.5267/j.ijiec.2021.7.001
Alvarez, G. (2022). Integrated modeling of the peer-to-peer markets in the energy industry. International Journal of Industrial Engineering Computations. 13, 101–118. https://doi.org/10.5267/j.ijiec.2021.7.002
Alvarez, G. (2020). Operation of pumped storage hydropower plants through optimization for power systems. Energy, 202, 117797. https://doi.org/10.1016/j.energy.2020.117797
Alvarez, G. (2020). An optimization model for operations of large scale hydro power plants. IEEE Latin America Transactions, 18(09), 1631-1638.
Aragão, L. E., Anderson, L. O., Fonseca, M. G., Rosan, T. M., Vedovato, L. B., Wagner, F. H., ... & Saatchi, S. (2018). 21st Century drought-related fires counteract the decline of Amazon deforestation carbon emissions. Nature communications, 9(1), 536.
BBC (2021a). Climate change: UN to reveal landmark IPCC report findings. Science-environment 1.
BBC (2021b). South America’s drought-hit Paraná river at 77-year low. News 1.
Bonizzi, B. (2013). Financialization in developing and emerging countries: a survey. International journal of political economy, 42(4), 83-107. https://doi.org/10.2753/IJP0891-1916420405
Borghetti, A., D'Ambrosio, C., Lodi, A., & Martello, S. (2008). An MILP approach for short-term hydro scheduling and unit commitment with head-dependent reservoir. IEEE Transactions on power systems, 23(3), 1115-1124.
https://doi.org/10.1109/TPWRS.2008.926704
Bozorg Haddad, O., Ashofteh, P. S., Rasoulzadeh-Gharibdousti, S., & Mariño, M. A. (2014a). Optimization model for design-operation of pumped-storage and hydropower systems. Journal of energy engineering, 140(2), 04013016.
https://doi.org/10.1061/(ASCE)EY.1943-7897.0000169
Catalao, J. P., Mariano, S. J., Mendes, V. M., & Ferreira, L. A. (2008). Scheduling of head-sensitive cascaded hydro systems: A nonlinear approach. IEEE Transactions on Power Systems, 24(1), 337-346.
https://doi.org/10.1109/TPWRS.2008.2005708
Li, C. A., Svoboda, A. J., Tseng, C. L., Johnson, R. B., & Hsu, E. (1997). Hydro unit commitment in hydro-thermal optimization. IEEE Transactions on Power Systems, 12(2), 764-769. https://doi.org/10.1109/59.589675
Chen, C. H., Chen, N., & Luh, P. B. (2016). Head dependence of pump-storage-unit model applied to generation scheduling. IEEE Transactions on Power Systems, 32(4), 2869-2877. https://doi.org/10.1109/TPWRS.2016.2629093
Cheng, C., Su, C., Wang, P., Shen, J., Lu, J., & Wu, X. (2018). An MILP-based model for short-term peak shaving operation of pumped-storage hydropower plants serving multiple power grids. Energy, 163, 722-733.
https://doi.org/10.1016/j.energy.2018.08.077
Cheng, C. T., Cheng, X., Shen, J. J., & Wu, X. Y. (2015). Short-term peak shaving operation for multiple power grids with pumped storage power plants. International Journal of Electrical Power & Energy Systems, 67, 570-581.
https://doi.org/10.1016/j.ijepes.2014.12.043
Cohen, A. I., & Wan, S. H. (1985). An algorithm for scheduling a large pumped storage plant. IEEE transactions on power apparatus and systems, 8, 2099-2104. https://doi.org/10.1109/MPER.1985.5526386
CONAE (2021). Catalog of images, Aqua - Modis.
Diamante, E. (2022). Millionaire losses. The Paraná’s low water level conspires against Argentina’s main income (in Spanish). La Nación Newsp. 1.
Fruhmann, C., Tuerk, A., Kulmer, V., & Gubina, A. F. (2019). Balancing environmental benefits and damages of small hydropower generation in policy-making: assessing the implementation of a contradicting EU policy framework in Austria and Slovenia. International Journal of Sustainable Energy, 38(1), 37-49. https://doi.org/10.1080/14786451.2018.1452741
Ghasemi, A. (2018). Coordination of pumped-storage unit and irrigation system with intermittent wind generation for intelligent energy management of an agricultural microgrid. Energy, 142, 1-13.
https://doi.org/10.1016/j.energy.2017.09.146
GLR (2022). Porto Primavera(Eng. Sérgio Motta) [WWW Document]. Glob. Lakes Reserv. Repos. URL http://www.worldlake-db.com/detail/?id=28&cid=2 (accessed 2.8.22).
Gupta, R., & Harihar, S. (2022). Ilha Solteira Hydroelectric Power Plant Brazil [WWW Document]. Glob. Energy Obs. URL http://globalenergyobservatory.org/geoid/43356
Helleiner, E. (2011). Understanding the 2007–2008 global financial crisis: Lessons for scholars of international political economy. Annual review of political science, 14, 67-87. https://doi.org/10.1146/annurev-polisci-050409-112539
Hunt, J. D., Nascimento, A., ten Caten, C. S., Tomé, F. M. C., Schneider, P. S., Thomazoni, A. L. R., ... & Senne, R. (2022). Energy crisis in Brazil: Impact of hydropower reservoir level on the river flow. Energy, 239, 121927.
https://doi.org/10.1016/j.energy.2021.121927
IBM Corp. (2009). V12. 1: User’s Manual for CPLEX. Int. Bus. Mach. Corp. 12, 481.
IEA (2018). Energy Efficiency 2018. Analysis and Outlooks to 2040.
IPCC - Contribution of Working Group I to the Sixth Assessment Report of the Intergovernmental Panel on Climate Change, (2021). Summary for Policymakers. In: Climate Change 2021: The Physical Science Basis.
Itaipu (2022). PARANÁ RIVER [WWW Document]. Energy. URL https://www.itaipu.gov.br/en/energy/parana-river (accessed 2.24.22).
Lehtonen, E., Kaki, A., & Salo, A. (2015). Production planning of a pumped-storage hydropower plant. MS-E2108 Independent Research Projects in Systems Analysis, 23.
Li, X., Li, T., Wei, J., Wang, G., & Yeh, W. W. G. (2013). Hydro unit commitment via mixed integer linear programming: A case study of the three gorges project, China. IEEE Transactions on Power Systems, 29(3), 1232-1241.
https://doi.org/10.1109/TPWRS.2013.2288933
Lima, R. M., & Grossmann, I. E. (2011). Computational advances in solving mixed integer linear programming problems. his 65th Birthd. 151–160.
Margeta, J., & Đurin, B. (2014). Hydrological and hydro-energy indicators of the hybrid energy system using solar and pump storage hydroelectric plant. International Journal of Sustainable Energy, 33(4), 827-841.
https://doi.org/10.1080/14786451.2013.774002
Masud, M. H., Nuruzzaman, M., Ahamed, R., Ananno, A. A., & Tomal, A. A. (2020). Renewable energy in Bangladesh: current situation and future prospect. International Journal of Sustainable Energy, 39(2), 132-175.
https://doi.org/10.1080/14786451.2019.1659270
Meyer, N. I. (2003). Distributed generation and the problematic deregulation of energy markets in Europe. International Journal of Sustainable Energy, 23(4), 217-221. https://doi.org/10.1080/01425910412331290724
Ministry of Energy and Mining (MINEM) (2016). Inventory of Dams and Hydroelectric Power Plants of the Argentine Republic.
Narang, N., Dhillon, J. S., & Kothari, D. P. (2012). Multiobjective fixed head hydrothermal scheduling using integrated predator-prey optimization and Powell search method. Energy, 47(1), 237-252.
https://doi.org/10.1016/j.energy.2012.09.004
Operador Nacional do Sistema Eléctrico (2021). SINDAT - Sistema De Informações Geográficas Cadastrais do SIN [WWW Document]. Mapa Dinâmico Do Sin. URL http://www.ons.org.br/paginas/sobre-o-sin/mapas
Paine, N., Homans, F. R., Pollak, M., Bielicki, J. M., & Wilson, E. J. (2014). Why market rules matter: Optimizing pumped hydroelectric storage when compensation rules differ. Energy Economics, 46, 10-19.
https://doi.org/10.1016/j.eneco.2014.08.017
Pirbazari, A.M. (2010). Ancillary services definitions, markets and practices in the world, in: 2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA). IEEE, pp. 32–36. https://doi.org/10.1109/TDC-LA.2010.5762857
Sanaeepur, S., Sanaeepur, H., Kargari, A., & Habibi, M. H. (2014). Renewable energies: climate-change mitigation and international climate policy. International Journal of Sustainable Energy, 33(1), 203-212.
https://doi.org/10.1080/14786451.2012.755978
Singh, D., & Rao, R. (2011). A hybrid multiple attribute decision making method for solving problems of industrial environment. International Journal of Industrial Engineering Computations, 2(3), 631-644.
https://doi.org/10.5267/j.ijiec.2011.02.001
Smink, V. (2021). 3 unexpected problems being generated in South America by the historic drought of the Paraná River. BBC News Mundo (in spanish) 1. https://doi.org/https://www.bbc.com/mundo/noticias-america-latina-58771149
https://doi.org/10.5267/j.ijiec.2021.7.001
Alvarez, G. (2022). Integrated modeling of the peer-to-peer markets in the energy industry. International Journal of Industrial Engineering Computations. 13, 101–118. https://doi.org/10.5267/j.ijiec.2021.7.002
Alvarez, G. (2020). Operation of pumped storage hydropower plants through optimization for power systems. Energy, 202, 117797. https://doi.org/10.1016/j.energy.2020.117797
Alvarez, G. (2020). An optimization model for operations of large scale hydro power plants. IEEE Latin America Transactions, 18(09), 1631-1638.
Aragão, L. E., Anderson, L. O., Fonseca, M. G., Rosan, T. M., Vedovato, L. B., Wagner, F. H., ... & Saatchi, S. (2018). 21st Century drought-related fires counteract the decline of Amazon deforestation carbon emissions. Nature communications, 9(1), 536.
BBC (2021a). Climate change: UN to reveal landmark IPCC report findings. Science-environment 1.
BBC (2021b). South America’s drought-hit Paraná river at 77-year low. News 1.
Bonizzi, B. (2013). Financialization in developing and emerging countries: a survey. International journal of political economy, 42(4), 83-107. https://doi.org/10.2753/IJP0891-1916420405
Borghetti, A., D'Ambrosio, C., Lodi, A., & Martello, S. (2008). An MILP approach for short-term hydro scheduling and unit commitment with head-dependent reservoir. IEEE Transactions on power systems, 23(3), 1115-1124.
https://doi.org/10.1109/TPWRS.2008.926704
Bozorg Haddad, O., Ashofteh, P. S., Rasoulzadeh-Gharibdousti, S., & Mariño, M. A. (2014a). Optimization model for design-operation of pumped-storage and hydropower systems. Journal of energy engineering, 140(2), 04013016.
https://doi.org/10.1061/(ASCE)EY.1943-7897.0000169
Catalao, J. P., Mariano, S. J., Mendes, V. M., & Ferreira, L. A. (2008). Scheduling of head-sensitive cascaded hydro systems: A nonlinear approach. IEEE Transactions on Power Systems, 24(1), 337-346.
https://doi.org/10.1109/TPWRS.2008.2005708
Li, C. A., Svoboda, A. J., Tseng, C. L., Johnson, R. B., & Hsu, E. (1997). Hydro unit commitment in hydro-thermal optimization. IEEE Transactions on Power Systems, 12(2), 764-769. https://doi.org/10.1109/59.589675
Chen, C. H., Chen, N., & Luh, P. B. (2016). Head dependence of pump-storage-unit model applied to generation scheduling. IEEE Transactions on Power Systems, 32(4), 2869-2877. https://doi.org/10.1109/TPWRS.2016.2629093
Cheng, C., Su, C., Wang, P., Shen, J., Lu, J., & Wu, X. (2018). An MILP-based model for short-term peak shaving operation of pumped-storage hydropower plants serving multiple power grids. Energy, 163, 722-733.
https://doi.org/10.1016/j.energy.2018.08.077
Cheng, C. T., Cheng, X., Shen, J. J., & Wu, X. Y. (2015). Short-term peak shaving operation for multiple power grids with pumped storage power plants. International Journal of Electrical Power & Energy Systems, 67, 570-581.
https://doi.org/10.1016/j.ijepes.2014.12.043
Cohen, A. I., & Wan, S. H. (1985). An algorithm for scheduling a large pumped storage plant. IEEE transactions on power apparatus and systems, 8, 2099-2104. https://doi.org/10.1109/MPER.1985.5526386
CONAE (2021). Catalog of images, Aqua - Modis.
Diamante, E. (2022). Millionaire losses. The Paraná’s low water level conspires against Argentina’s main income (in Spanish). La Nación Newsp. 1.
Fruhmann, C., Tuerk, A., Kulmer, V., & Gubina, A. F. (2019). Balancing environmental benefits and damages of small hydropower generation in policy-making: assessing the implementation of a contradicting EU policy framework in Austria and Slovenia. International Journal of Sustainable Energy, 38(1), 37-49. https://doi.org/10.1080/14786451.2018.1452741
Ghasemi, A. (2018). Coordination of pumped-storage unit and irrigation system with intermittent wind generation for intelligent energy management of an agricultural microgrid. Energy, 142, 1-13.
https://doi.org/10.1016/j.energy.2017.09.146
GLR (2022). Porto Primavera(Eng. Sérgio Motta) [WWW Document]. Glob. Lakes Reserv. Repos. URL http://www.worldlake-db.com/detail/?id=28&cid=2 (accessed 2.8.22).
Gupta, R., & Harihar, S. (2022). Ilha Solteira Hydroelectric Power Plant Brazil [WWW Document]. Glob. Energy Obs. URL http://globalenergyobservatory.org/geoid/43356
Helleiner, E. (2011). Understanding the 2007–2008 global financial crisis: Lessons for scholars of international political economy. Annual review of political science, 14, 67-87. https://doi.org/10.1146/annurev-polisci-050409-112539
Hunt, J. D., Nascimento, A., ten Caten, C. S., Tomé, F. M. C., Schneider, P. S., Thomazoni, A. L. R., ... & Senne, R. (2022). Energy crisis in Brazil: Impact of hydropower reservoir level on the river flow. Energy, 239, 121927.
https://doi.org/10.1016/j.energy.2021.121927
IBM Corp. (2009). V12. 1: User’s Manual for CPLEX. Int. Bus. Mach. Corp. 12, 481.
IEA (2018). Energy Efficiency 2018. Analysis and Outlooks to 2040.
IPCC - Contribution of Working Group I to the Sixth Assessment Report of the Intergovernmental Panel on Climate Change, (2021). Summary for Policymakers. In: Climate Change 2021: The Physical Science Basis.
Itaipu (2022). PARANÁ RIVER [WWW Document]. Energy. URL https://www.itaipu.gov.br/en/energy/parana-river (accessed 2.24.22).
Lehtonen, E., Kaki, A., & Salo, A. (2015). Production planning of a pumped-storage hydropower plant. MS-E2108 Independent Research Projects in Systems Analysis, 23.
Li, X., Li, T., Wei, J., Wang, G., & Yeh, W. W. G. (2013). Hydro unit commitment via mixed integer linear programming: A case study of the three gorges project, China. IEEE Transactions on Power Systems, 29(3), 1232-1241.
https://doi.org/10.1109/TPWRS.2013.2288933
Lima, R. M., & Grossmann, I. E. (2011). Computational advances in solving mixed integer linear programming problems. his 65th Birthd. 151–160.
Margeta, J., & Đurin, B. (2014). Hydrological and hydro-energy indicators of the hybrid energy system using solar and pump storage hydroelectric plant. International Journal of Sustainable Energy, 33(4), 827-841.
https://doi.org/10.1080/14786451.2013.774002
Masud, M. H., Nuruzzaman, M., Ahamed, R., Ananno, A. A., & Tomal, A. A. (2020). Renewable energy in Bangladesh: current situation and future prospect. International Journal of Sustainable Energy, 39(2), 132-175.
https://doi.org/10.1080/14786451.2019.1659270
Meyer, N. I. (2003). Distributed generation and the problematic deregulation of energy markets in Europe. International Journal of Sustainable Energy, 23(4), 217-221. https://doi.org/10.1080/01425910412331290724
Ministry of Energy and Mining (MINEM) (2016). Inventory of Dams and Hydroelectric Power Plants of the Argentine Republic.
Narang, N., Dhillon, J. S., & Kothari, D. P. (2012). Multiobjective fixed head hydrothermal scheduling using integrated predator-prey optimization and Powell search method. Energy, 47(1), 237-252.
https://doi.org/10.1016/j.energy.2012.09.004
Operador Nacional do Sistema Eléctrico (2021). SINDAT - Sistema De Informações Geográficas Cadastrais do SIN [WWW Document]. Mapa Dinâmico Do Sin. URL http://www.ons.org.br/paginas/sobre-o-sin/mapas
Paine, N., Homans, F. R., Pollak, M., Bielicki, J. M., & Wilson, E. J. (2014). Why market rules matter: Optimizing pumped hydroelectric storage when compensation rules differ. Energy Economics, 46, 10-19.
https://doi.org/10.1016/j.eneco.2014.08.017
Pirbazari, A.M. (2010). Ancillary services definitions, markets and practices in the world, in: 2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA). IEEE, pp. 32–36. https://doi.org/10.1109/TDC-LA.2010.5762857
Sanaeepur, S., Sanaeepur, H., Kargari, A., & Habibi, M. H. (2014). Renewable energies: climate-change mitigation and international climate policy. International Journal of Sustainable Energy, 33(1), 203-212.
https://doi.org/10.1080/14786451.2012.755978
Singh, D., & Rao, R. (2011). A hybrid multiple attribute decision making method for solving problems of industrial environment. International Journal of Industrial Engineering Computations, 2(3), 631-644.
https://doi.org/10.5267/j.ijiec.2011.02.001
Smink, V. (2021). 3 unexpected problems being generated in South America by the historic drought of the Paraná River. BBC News Mundo (in spanish) 1. https://doi.org/https://www.bbc.com/mundo/noticias-america-latina-58771149