How to cite this paper
Ghezavati, V. (2011). A new stochastic mixed integer programming to design integrated cellular manufacturing system: A supply chain framework.International Journal of Industrial Engineering Computations , 2(3), 563-574.
Refrences
Andres, C., Lozano, S., & Adenso-Diaz, B. (2007). Disassembly sequence planning in a Disassembly cell, Robotics and Computer-Integrated Manufacturing, 23(6), 690-695.
Apaioannou, G. P, & Wilson, J. M. (2008). Fuzzy extensions to integer programming of cell formation problem in machine scheduling. Annals of Operations Research, 1-19.
Badiru, A. B. (1992). Computational survey of univariate and multivariate learning curve models, IEEE Transactions on Engineering Management, 39, 176-188.
Balakrishnan, J., & Cheng C. H., (2005). Dynamic C.M. under multi-period planning horizon, Journal of Manufacturing Technology Management. 16(5), 516-530.
Balakrishnan, J., & Cheng, C.H., (2007). Multi-period planning and uncertainty issues in C.M.: a review and future directions, European Journal of Operational Research, 177(1), 281-309.
Ghosh, T., Sengupta, S., Chattopadhyay, M, & Dan, P. K. (2011). Meta-heuristics in cellular manufacturing: A state-of-the-art review, International Journal of Industrial Engineering Computations, 2, 87-122.
Ghezavati, V. R., & Saidi-Mehrabd, M. (2010). Designing integrated cellular manufacturing systems with scheduling considering stochastic processing time, The International Journal of Advanced Manufacturing Technology, 48 (5-8), 701-717.
Ghezavati, V. R., Jabal-Ameli, M. S., & Makui, A. (2009). A new heuristic method for distribution networks considering service level constraint and coverage radius, Expert Systems with Applications, 36(3), 5620-5629.
Gupta, S.M., & Kavusturucu, A. (1998). Modeling of finite buffer cellular manufacturing systems with unreliable machines. International Journal of Industrial Engineering: Theory Applications and Practice, 5(4), 265-277.
Hurley, S.F., & Whybark, C.D., (1999). Inventory and capacity trade-off in a manufacturing cell. International Journal of Production Economics Volume, 59(1), 203-212.
Kuroda, M., & Tomita, T., (2005). Robust design of a cellular–line production system with unreliable facilities. Computers and Industrial Engineering, 48(3), 537-551.
Lockwood, W. T., Mahmoodi, F., Ruben, R., Mosier, A., & Charles T. (2000). Scheduling unbalanced cellular manufacturing systems with lot splitting. International Journal of Production Research, 38(4). 951 – 965.
Mahdavi, I., Javadi, B., Fallah-Alipour, K., & Slomp, J. (2007). Designing a new mathematical model for cellular manufacturing system based on cell utilization, Applied Mathematics and Computation, 190, 662–670.
Mobasheri, F., Orren, L. H., & Sioshansi, F. P. (1989). Scenario planning at southern California Edison. INTERFACES, 19(5), 31-44.
Mulvey, J. M. (1996). Generating scenarios for the Towers Perrin investment system. INTERFACES, 26 (2), 1-15.
Shanker, R., & Vrat, P., (1998). Post design modeling for CMS with cost uncertainty, International Journal of Production Economics, 55(1), 97-109.
Shanker, R., & Vrat, P., (1999). Some design issues in C.M. using the fuzzy programming approach. International Journal of Production Research, 37(11), 2545-2563.
Snyder, L.V. (2006). Facility location under uncertainty: a review, IIE Transactions, 38, 537–554.
Solimanpur, M., Vrat. P., & Shankar, R. (2004). A heuristic to optimize makespan of cell scheduling problem. International Journal of Production Economics, 88, 231–241.
Szwarc, D., Rajamani, D., Bector, C.R, (1997). Cell formation considering fuzzy demand and machine capacity. International Journal of Advanced Manufacturing Technology, 13(2), 134-147.
Tsai, C. C., Chu, C. H., & Barta, T. (1997). Analysis and modeling of a manufacturing cell formation problem with 17. Fuzzy integer programming. IIE Transactions, 29(7), 533–547.
Tavakkoli-Moghaddam, R., Javadian, N., Javadi, B., & Safaei, N. (2007). Design of a facility layout problem in CMS with stochastic demand, Applied Mathematics and Computation, 184(2), 721-728.
Venkataramanaiah, S. (2007). Scheduling in cellular manufacturing systems: an heuristic approach. International Journal of Production Research, 1, 1-21.
Wu, X. D., Chu, C. H., Wang, Y. F., & Yan, W. L. (2006). Concurrent design of cellular manufacturing systems: A genetic algorithm approach. International Journal of Production Research, 44(6), 1217–1241.
Apaioannou, G. P, & Wilson, J. M. (2008). Fuzzy extensions to integer programming of cell formation problem in machine scheduling. Annals of Operations Research, 1-19.
Badiru, A. B. (1992). Computational survey of univariate and multivariate learning curve models, IEEE Transactions on Engineering Management, 39, 176-188.
Balakrishnan, J., & Cheng C. H., (2005). Dynamic C.M. under multi-period planning horizon, Journal of Manufacturing Technology Management. 16(5), 516-530.
Balakrishnan, J., & Cheng, C.H., (2007). Multi-period planning and uncertainty issues in C.M.: a review and future directions, European Journal of Operational Research, 177(1), 281-309.
Ghosh, T., Sengupta, S., Chattopadhyay, M, & Dan, P. K. (2011). Meta-heuristics in cellular manufacturing: A state-of-the-art review, International Journal of Industrial Engineering Computations, 2, 87-122.
Ghezavati, V. R., & Saidi-Mehrabd, M. (2010). Designing integrated cellular manufacturing systems with scheduling considering stochastic processing time, The International Journal of Advanced Manufacturing Technology, 48 (5-8), 701-717.
Ghezavati, V. R., Jabal-Ameli, M. S., & Makui, A. (2009). A new heuristic method for distribution networks considering service level constraint and coverage radius, Expert Systems with Applications, 36(3), 5620-5629.
Gupta, S.M., & Kavusturucu, A. (1998). Modeling of finite buffer cellular manufacturing systems with unreliable machines. International Journal of Industrial Engineering: Theory Applications and Practice, 5(4), 265-277.
Hurley, S.F., & Whybark, C.D., (1999). Inventory and capacity trade-off in a manufacturing cell. International Journal of Production Economics Volume, 59(1), 203-212.
Kuroda, M., & Tomita, T., (2005). Robust design of a cellular–line production system with unreliable facilities. Computers and Industrial Engineering, 48(3), 537-551.
Lockwood, W. T., Mahmoodi, F., Ruben, R., Mosier, A., & Charles T. (2000). Scheduling unbalanced cellular manufacturing systems with lot splitting. International Journal of Production Research, 38(4). 951 – 965.
Mahdavi, I., Javadi, B., Fallah-Alipour, K., & Slomp, J. (2007). Designing a new mathematical model for cellular manufacturing system based on cell utilization, Applied Mathematics and Computation, 190, 662–670.
Mobasheri, F., Orren, L. H., & Sioshansi, F. P. (1989). Scenario planning at southern California Edison. INTERFACES, 19(5), 31-44.
Mulvey, J. M. (1996). Generating scenarios for the Towers Perrin investment system. INTERFACES, 26 (2), 1-15.
Shanker, R., & Vrat, P., (1998). Post design modeling for CMS with cost uncertainty, International Journal of Production Economics, 55(1), 97-109.
Shanker, R., & Vrat, P., (1999). Some design issues in C.M. using the fuzzy programming approach. International Journal of Production Research, 37(11), 2545-2563.
Snyder, L.V. (2006). Facility location under uncertainty: a review, IIE Transactions, 38, 537–554.
Solimanpur, M., Vrat. P., & Shankar, R. (2004). A heuristic to optimize makespan of cell scheduling problem. International Journal of Production Economics, 88, 231–241.
Szwarc, D., Rajamani, D., Bector, C.R, (1997). Cell formation considering fuzzy demand and machine capacity. International Journal of Advanced Manufacturing Technology, 13(2), 134-147.
Tsai, C. C., Chu, C. H., & Barta, T. (1997). Analysis and modeling of a manufacturing cell formation problem with 17. Fuzzy integer programming. IIE Transactions, 29(7), 533–547.
Tavakkoli-Moghaddam, R., Javadian, N., Javadi, B., & Safaei, N. (2007). Design of a facility layout problem in CMS with stochastic demand, Applied Mathematics and Computation, 184(2), 721-728.
Venkataramanaiah, S. (2007). Scheduling in cellular manufacturing systems: an heuristic approach. International Journal of Production Research, 1, 1-21.
Wu, X. D., Chu, C. H., Wang, Y. F., & Yan, W. L. (2006). Concurrent design of cellular manufacturing systems: A genetic algorithm approach. International Journal of Production Research, 44(6), 1217–1241.