How to cite this paper
Khanna, A., Kishore, A & Jaggi, C. (2017). Strategic production modeling for defective items with imperfect inspection process, rework, and sales return under two-level trade credit.International Journal of Industrial Engineering Computations , 8(1), 85-118.
Refrences
Aggarwal, S. P., & Jaggi, C. K. (1995). Ordering policies of deteriorating items under permissible delay in payments. Journal of the Operational Research Society, 46(5), 658-662.
Chang, C. T., Cheng, M. C., & Soong, P. Y. (2016). Impacts of inspection errors and trade credits on the economic order quantity model for items with imperfect quality. International Journal of Systems Science: Operations & Logistics, 3(1), 34-48.
Chiu, Y. P. (2003). Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization, 35(4), 427-437.
Chiu, S. W., Ting, C. K., & Chiu, Y. S. P. (2007). Optimal production lot sizing with rework, scrap rate, and service level constraint. Mathematical and Computer Modelling, 46(3), 535-549.
Cárdenas-Barrón, L. E. (2009). Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Computers & Industrial Engineering, 57(3), 1105-1113.
Chiu, S. W. (2010). Robust planning in optimization for production system subject to random machine breakdown and failure in rework. Computers & Operations Research, 37(5), 899-908.
Chung, K. J. (2011). The economic production quantity with rework process in supply chain management. Computers & Mathematics with Applications, 62(6), 2547-2550.
Chung, K. J., & Liao, J. J. (2011). The simplified solution algorithm for an integrated supplier–buyer inventory model with two-part trade credit in a supply chain system. European Journal of Operational Research, 213(1), 156-165.
Duffuaa, S. O., & Khan, M. (2005). Impact of inspection errors on the performance measures of a general repeat inspection plan. International Journal of Production Research, 43(23), 4945-4967.
Goyal, S. K. (1985). Economic order quantity under conditions of permissible delay in payments. Journal of the Operational Research Society, 36(4), 335–338.
Haley, C. W. & Higgins, R. C. (1973). Inventory policy and trade financing. Management Science, 20(4), 464–471.
Hayek, P. A., & Salameh, M. K. (2001). Production lot sizing with the reworking of imperfect quality items produced. Production Planning & Control, 12(6), 584-590.
Hsu, J. T., & Hsu, L. F. (2013a). An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns. International Journal of Production Economics, 143(1), 162-170.
Hsu, J. T., & Hsu, L. F. (2013b). Two EPQ models with imperfect production processes, inspection errors, planned backorders, and sales returns. Computers & Industrial Engineering, 64(1), 389-402.
Ho, C. H., Ouyang, L. Y., & Su, C. H. (2008). Optimal pricing, shipment and payment policy for an integrated supplier–buyer inventory model with two-part trade credit. European Journal of Operational Research, 187(2), 496-510.
Jaggi, C. K., Goyal, S. K., & Goel, S. K. (2008). Retailer’s optimal replenishment decisions with credit-linked demand under permissible delay in payments. European Journal of Operational Research, 190(1), 130-135.
Jaggi, C. K., Khanna, A., & Kishore, A. (2016). Production inventory policies for defective items with inspection errors, sales return, imperfect rework process and backorders. In Advancement in Science and Technology: Proceedings of the 2nd International Conference on Communication Systems (ICCS-2015) (Vol. 1715, p. 020062). AIP Publishing.
Jaggi, C. K., Tiwari, S., & Shafi, A. (2015). Effect of deterioration on two-warehouse inventory model with imperfect quality. Computers & Industrial Engineering, 88, 378-385.
Jamal, A. M. M., Sarker, B. R., & Wang, S. (1997). An ordering policy for deteriorating items with allowable shortage and permissible delay in payment. Journal of the Operational Research Society, 48(8), 826-833.
Khan, M., Jaber, M. Y., & Bonney, M. (2011). An economic order quantity (EOQ) for items with imperfect quality and inspection errors. International Journal of Production Economics, 133(1), 113-118.
Kim, J., Hwang, H., & Shinn, S. (1995). An optimal credit policy to increase supplier's profits with price-dependent demand functions. Production Planning & Control, 6(1), 45-50.
Kreng, V. B., & Tan, S. J. (2011). Optimal replenishment decision in an EPQ model with defective items under supply chain trade credit policy. Expert Systems with Applications, 38(8), 9888-9899.
Lee, H. L., & Rosenblatt, M. J. (1987). Simultaneous determination of production cycle and inspection schedules in a production system. Management Science, 33(9), 1125-1136.
Liu, N., Kim, Y., & Hwang, H. (2009). An optimal operating policy for the production system with rework. Computers & Industrial Engineering, 56(3), 874-887.
Ouyang, L. Y., & Chang, C. T. (2013). Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging. International Journal of Production Economics, 144(2), 610-617.
Papachristos, S., & Konstantaras, I. (2006). Economic ordering quantity models for items with imperfect quality. International Journal of Production Economics, 100(1), 148-154.
Porteus, E. L. (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Operations research, 34(1), 137-144.
Rosenblatt, M. J., & Lee, H. L. (1986). Economic production cycles with imperfect production processes. IIE transactions, 18(1), 48-55.
Schwaller, R.L. (1988). EOQ under inspection costs. Production and Inventory Management, 29(3), 22-24.
Raouf, A., Jain, J. K., & Sathe, P. T. (1983). A cost-minimization model for multicharacteristic component inspection. IIE Transactions, 15(3), 187–194.
Salameh, M. K., & Jaber, M. Y. (2000). Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 64(1), 59-64.
Sana, S. S. (2010). An economic production lot size model in an imperfect production system. European Journal of Operational Research, 201(1), 158-170.
Schrady DA (1967). A deterministic inventory model for repairable items. Naval Research Logistics, 14(3), 391-398.
Sarkar, B., Cárdenas-Barrón, L. E., Sarkar, M., & Singgih, M. L. (2014). An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. Journal of Manufacturing Systems, 33(3), 423-435.
Taft, E. W. (1918). The most economical production lot. Iron Age, 101(18), 1410-1412.
Teng, J. T. (2002). On the economic order quantity under conditions of permissible delay in payments. Journal of the Operational Research Society, 53(8), 915-918.
Teng, J. T., & Chang, C. T. (2009). Optimal manufacturer’s replenishment policies in the EPQ model under two levels of trade credit policy. European Journal of Operational Research, 195(2), 358-363.
Thangam, A., & Uthayakumar, R. (2009). Two-echelon trade credit financing for perishable items in a supply chain when demand depends on both selling price and credit period. Computers & Industrial Engineering, 57(3), 773-786.
Tiwari, S., Cárdenas-Barrón, L. E., Khanna, A., & Jaggi, C. K. (2016). Impact of trade credit and inflation on retailer's ordering policies for non-instantaneous deteriorating items in a two-warehouse environment.International Journal of Production Economics, 176, 154-169.
Vörös, J. (2013). Economic order and production quantity models without constraint on the percentage of defective items. Central European Journal of Operations Research, 21(4), 867-885.
Wee, H. M., & Widyadana, G. A. (2013). A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule. Omega, 41(6), 941-954.
Yoo, S. H., Kim, D., & Park, M. S. (2009). Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return. International Journal of Production Economics, 121(1), 255-265.
Yoo, S. H., Kim, D., & Park, M. S. (2012). Inventory models for imperfect production and inspection processes with various inspection options under one-time and continuous improvement investment. Computers & Operations Research, 39(9), 2001-2015.
Zhang, X., & Gerchak, Y. (1990). Joint lot sizing and inspection policy in an EOQ model with random yield. IIE transactions, 22(1), 41-47.
Zhou, Y., Chen, C., Li, C., & Zhong, Y. (2016). A synergic economic order quantity model with trade credit, shortages, imperfect quality and inspection errors. Applied Mathematical Modelling, 40(2), 1012-1028.
Chang, C. T., Cheng, M. C., & Soong, P. Y. (2016). Impacts of inspection errors and trade credits on the economic order quantity model for items with imperfect quality. International Journal of Systems Science: Operations & Logistics, 3(1), 34-48.
Chiu, Y. P. (2003). Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization, 35(4), 427-437.
Chiu, S. W., Ting, C. K., & Chiu, Y. S. P. (2007). Optimal production lot sizing with rework, scrap rate, and service level constraint. Mathematical and Computer Modelling, 46(3), 535-549.
Cárdenas-Barrón, L. E. (2009). Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Computers & Industrial Engineering, 57(3), 1105-1113.
Chiu, S. W. (2010). Robust planning in optimization for production system subject to random machine breakdown and failure in rework. Computers & Operations Research, 37(5), 899-908.
Chung, K. J. (2011). The economic production quantity with rework process in supply chain management. Computers & Mathematics with Applications, 62(6), 2547-2550.
Chung, K. J., & Liao, J. J. (2011). The simplified solution algorithm for an integrated supplier–buyer inventory model with two-part trade credit in a supply chain system. European Journal of Operational Research, 213(1), 156-165.
Duffuaa, S. O., & Khan, M. (2005). Impact of inspection errors on the performance measures of a general repeat inspection plan. International Journal of Production Research, 43(23), 4945-4967.
Goyal, S. K. (1985). Economic order quantity under conditions of permissible delay in payments. Journal of the Operational Research Society, 36(4), 335–338.
Haley, C. W. & Higgins, R. C. (1973). Inventory policy and trade financing. Management Science, 20(4), 464–471.
Hayek, P. A., & Salameh, M. K. (2001). Production lot sizing with the reworking of imperfect quality items produced. Production Planning & Control, 12(6), 584-590.
Hsu, J. T., & Hsu, L. F. (2013a). An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns. International Journal of Production Economics, 143(1), 162-170.
Hsu, J. T., & Hsu, L. F. (2013b). Two EPQ models with imperfect production processes, inspection errors, planned backorders, and sales returns. Computers & Industrial Engineering, 64(1), 389-402.
Ho, C. H., Ouyang, L. Y., & Su, C. H. (2008). Optimal pricing, shipment and payment policy for an integrated supplier–buyer inventory model with two-part trade credit. European Journal of Operational Research, 187(2), 496-510.
Jaggi, C. K., Goyal, S. K., & Goel, S. K. (2008). Retailer’s optimal replenishment decisions with credit-linked demand under permissible delay in payments. European Journal of Operational Research, 190(1), 130-135.
Jaggi, C. K., Khanna, A., & Kishore, A. (2016). Production inventory policies for defective items with inspection errors, sales return, imperfect rework process and backorders. In Advancement in Science and Technology: Proceedings of the 2nd International Conference on Communication Systems (ICCS-2015) (Vol. 1715, p. 020062). AIP Publishing.
Jaggi, C. K., Tiwari, S., & Shafi, A. (2015). Effect of deterioration on two-warehouse inventory model with imperfect quality. Computers & Industrial Engineering, 88, 378-385.
Jamal, A. M. M., Sarker, B. R., & Wang, S. (1997). An ordering policy for deteriorating items with allowable shortage and permissible delay in payment. Journal of the Operational Research Society, 48(8), 826-833.
Khan, M., Jaber, M. Y., & Bonney, M. (2011). An economic order quantity (EOQ) for items with imperfect quality and inspection errors. International Journal of Production Economics, 133(1), 113-118.
Kim, J., Hwang, H., & Shinn, S. (1995). An optimal credit policy to increase supplier's profits with price-dependent demand functions. Production Planning & Control, 6(1), 45-50.
Kreng, V. B., & Tan, S. J. (2011). Optimal replenishment decision in an EPQ model with defective items under supply chain trade credit policy. Expert Systems with Applications, 38(8), 9888-9899.
Lee, H. L., & Rosenblatt, M. J. (1987). Simultaneous determination of production cycle and inspection schedules in a production system. Management Science, 33(9), 1125-1136.
Liu, N., Kim, Y., & Hwang, H. (2009). An optimal operating policy for the production system with rework. Computers & Industrial Engineering, 56(3), 874-887.
Ouyang, L. Y., & Chang, C. T. (2013). Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging. International Journal of Production Economics, 144(2), 610-617.
Papachristos, S., & Konstantaras, I. (2006). Economic ordering quantity models for items with imperfect quality. International Journal of Production Economics, 100(1), 148-154.
Porteus, E. L. (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Operations research, 34(1), 137-144.
Rosenblatt, M. J., & Lee, H. L. (1986). Economic production cycles with imperfect production processes. IIE transactions, 18(1), 48-55.
Schwaller, R.L. (1988). EOQ under inspection costs. Production and Inventory Management, 29(3), 22-24.
Raouf, A., Jain, J. K., & Sathe, P. T. (1983). A cost-minimization model for multicharacteristic component inspection. IIE Transactions, 15(3), 187–194.
Salameh, M. K., & Jaber, M. Y. (2000). Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 64(1), 59-64.
Sana, S. S. (2010). An economic production lot size model in an imperfect production system. European Journal of Operational Research, 201(1), 158-170.
Schrady DA (1967). A deterministic inventory model for repairable items. Naval Research Logistics, 14(3), 391-398.
Sarkar, B., Cárdenas-Barrón, L. E., Sarkar, M., & Singgih, M. L. (2014). An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. Journal of Manufacturing Systems, 33(3), 423-435.
Taft, E. W. (1918). The most economical production lot. Iron Age, 101(18), 1410-1412.
Teng, J. T. (2002). On the economic order quantity under conditions of permissible delay in payments. Journal of the Operational Research Society, 53(8), 915-918.
Teng, J. T., & Chang, C. T. (2009). Optimal manufacturer’s replenishment policies in the EPQ model under two levels of trade credit policy. European Journal of Operational Research, 195(2), 358-363.
Thangam, A., & Uthayakumar, R. (2009). Two-echelon trade credit financing for perishable items in a supply chain when demand depends on both selling price and credit period. Computers & Industrial Engineering, 57(3), 773-786.
Tiwari, S., Cárdenas-Barrón, L. E., Khanna, A., & Jaggi, C. K. (2016). Impact of trade credit and inflation on retailer's ordering policies for non-instantaneous deteriorating items in a two-warehouse environment.International Journal of Production Economics, 176, 154-169.
Vörös, J. (2013). Economic order and production quantity models without constraint on the percentage of defective items. Central European Journal of Operations Research, 21(4), 867-885.
Wee, H. M., & Widyadana, G. A. (2013). A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule. Omega, 41(6), 941-954.
Yoo, S. H., Kim, D., & Park, M. S. (2009). Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return. International Journal of Production Economics, 121(1), 255-265.
Yoo, S. H., Kim, D., & Park, M. S. (2012). Inventory models for imperfect production and inspection processes with various inspection options under one-time and continuous improvement investment. Computers & Operations Research, 39(9), 2001-2015.
Zhang, X., & Gerchak, Y. (1990). Joint lot sizing and inspection policy in an EOQ model with random yield. IIE transactions, 22(1), 41-47.
Zhou, Y., Chen, C., Li, C., & Zhong, Y. (2016). A synergic economic order quantity model with trade credit, shortages, imperfect quality and inspection errors. Applied Mathematical Modelling, 40(2), 1012-1028.