How to cite this paper
Rabbani, M & Tanhaie, F. (2015). A Markov chain analysis of the effectiveness of drum-buffer-rope material flow management in job shop environment.International Journal of Industrial Engineering Computations , 6(4), 457-468.
Refrences
Babu, T. R., Rao, K. S. P., & Maheshwaran, C. U. (2007). Application of TOC embedded ILP for increasing throughput of production lines. The International Journal of Advanced Manufacturing Technology, 33(7-8), 812-818.
Betterton, C. E., & Cox, J. F. (2009). Espoused drum-buffer-rope flow control in serial lines: A comparative study of simulation models. International Journal of Production Economics, 117(1), 66-79.
Bozzone, V. (2002). The Theory of Delays, A Tool For Improving Performance And Profitability: In Job Shops & Custom Manufacturing Environment. New York: AMACON/American Management.
Chakravorty, S. S. (2001). An evaluation of the DBR control mechanism in a job shop environment. Omega, 29(4), 335-342.
Chakravorty, S. S., & Atwater, J. B. (2005). The impact of free goods on the performance of drum-buffer-rope scheduling systems. International Journal of Production Economics, 95(3), 347-357.
Chakravorty, S. S., & Verhoeven, P. R. (1996). Learning the theory of constraints with a simulation game. Simulation & Gaming, 27(2), 223-237.
Chakravorty, S. S., & Verhoeven, P. R. (1996). Learning the theory of constraints with a simulation game. Simulation & Gaming, 27(2), 223-237.
Cheraghi, S. H., Dadashzadeh, M., & Soppin, M. (2011). Comparative analysis of production control systems through simulation. Journal of Business & Economics Research (JBER), 6(5), 87-104.
Georgiadis, P., & Politou, A. (2013). Dynamic Drum-Buffer-Rope approach for production planning and control in capacitated flow-shop manufacturing systems. Computers & Industrial Engineering, 65(4), 689-703.
Goldratt, E. (1997). Critical chain. Great Barrington, MA: North River Press.
Goldratt, E. (1988). Computerized shop floor scheduling. International Journal of Production Research, 26(3), 443-455.
Goldratt, E. (1990). What is this thing called theory of constraints and how should it be implemented?. Croton-on-Hudson, N.Y.: North River Press.
Goldratt, E., & Fox, R. (1986). The race. Croton-on-Hudson, NY: North River Press.
Grinstead, C., Snell, J., & Snell, J. (1997). Introduction to probability. Providence, RI: American Mathematical Society.
Gupta, M. (2003). Constraints management--recent advances and practices. International Journal of Production Research, 41(4), 647-659.
Gupta, M., & Snyder, D. (2009). Comparing TOC with MRP and JIT: a literature review. International Journal of Production Research, 47(13), 3705-3739.
Kemeny, J., & Snell, J. (1960). Finite markov chains. Princeton, N.J.: Van Nostrand.
Lee, J., Chang, J., Tsai, C., & Li, R. (2010). Research on enhancement of TOC Simplified Drum-Buffer-Rope system using novel generic procedures. Expert Systems with Applications, 37(5), 3747-3754.
Miltenburg, J. (1997). Comparing JIT, MRP and TOC, and embedding TOC into MRP. International Journal of Production Research, 35(4), 1147-1169.
Pegels, C., & Watrous, C. (2005). Application of the theory of constraints to a bottleneck operation in a manufacturing plant. Journal of Manufacturing Technology Management, 16(3), 302-311.
Radovilsky, Z. (1998). A quantitative approach to estimate the size of the time buffer in the theory of constraints. International Journal of Production Economics, 55(2), 113-119.
Rahman, S. (1998). Theory of constraints. International Journal of Operations & Production Management, 18(4), 336-355.
Rand, G. (2000). Critical chain: the theory of constraints applied to project management. International Journal of Project Management, 18(3), 173-177.
Ray, A., Sarkar, B., & Sanyal, S. (2010). The TOC-Based algorithm for solving multiple constraint resources. IEEE Transactions on Engineering Management, 57(2), 301-309.
Ray, A., Sarkar, B., & Sanyal, S. (2008). An improved theory of constraints. International Journal of Accounting & Information Management, 16(2), 155-165.
Sale, M., & Inman, R. (2003). Survey-based comparison of performance and change in performance of firms using traditional manufacturing, JIT and TOC. International Journal of Production Research, 41(4), 829-844.
Schragenheim, E., & Boaz, R. (1990). The Drum-Buffer-Rope shop floor control. Production and Inventory Management Journal, 31(3), 18-23.
Schragenheim, E. and Dettmer, H. (2000). Manufacturing at warp speed. Boca Raton, FL: St. Lucie Press.
Steele, D., Philipoom, P., Malhotra, M., & Fry, T. (2005). Comparisons between drum–buffer–rope and material requirements planning: a case study. International Journal of Production Research, 43(15), 3181-3208.
Wu, S., Morris, J., & Gordon, T. (1994). A simulation analysis of the effectiveness of drum-buffer-rope scheduling in furniture manufacturing. Computers & Industrial Engineering, 26(4), 757-764.
Betterton, C. E., & Cox, J. F. (2009). Espoused drum-buffer-rope flow control in serial lines: A comparative study of simulation models. International Journal of Production Economics, 117(1), 66-79.
Bozzone, V. (2002). The Theory of Delays, A Tool For Improving Performance And Profitability: In Job Shops & Custom Manufacturing Environment. New York: AMACON/American Management.
Chakravorty, S. S. (2001). An evaluation of the DBR control mechanism in a job shop environment. Omega, 29(4), 335-342.
Chakravorty, S. S., & Atwater, J. B. (2005). The impact of free goods on the performance of drum-buffer-rope scheduling systems. International Journal of Production Economics, 95(3), 347-357.
Chakravorty, S. S., & Verhoeven, P. R. (1996). Learning the theory of constraints with a simulation game. Simulation & Gaming, 27(2), 223-237.
Chakravorty, S. S., & Verhoeven, P. R. (1996). Learning the theory of constraints with a simulation game. Simulation & Gaming, 27(2), 223-237.
Cheraghi, S. H., Dadashzadeh, M., & Soppin, M. (2011). Comparative analysis of production control systems through simulation. Journal of Business & Economics Research (JBER), 6(5), 87-104.
Georgiadis, P., & Politou, A. (2013). Dynamic Drum-Buffer-Rope approach for production planning and control in capacitated flow-shop manufacturing systems. Computers & Industrial Engineering, 65(4), 689-703.
Goldratt, E. (1997). Critical chain. Great Barrington, MA: North River Press.
Goldratt, E. (1988). Computerized shop floor scheduling. International Journal of Production Research, 26(3), 443-455.
Goldratt, E. (1990). What is this thing called theory of constraints and how should it be implemented?. Croton-on-Hudson, N.Y.: North River Press.
Goldratt, E., & Fox, R. (1986). The race. Croton-on-Hudson, NY: North River Press.
Grinstead, C., Snell, J., & Snell, J. (1997). Introduction to probability. Providence, RI: American Mathematical Society.
Gupta, M. (2003). Constraints management--recent advances and practices. International Journal of Production Research, 41(4), 647-659.
Gupta, M., & Snyder, D. (2009). Comparing TOC with MRP and JIT: a literature review. International Journal of Production Research, 47(13), 3705-3739.
Kemeny, J., & Snell, J. (1960). Finite markov chains. Princeton, N.J.: Van Nostrand.
Lee, J., Chang, J., Tsai, C., & Li, R. (2010). Research on enhancement of TOC Simplified Drum-Buffer-Rope system using novel generic procedures. Expert Systems with Applications, 37(5), 3747-3754.
Miltenburg, J. (1997). Comparing JIT, MRP and TOC, and embedding TOC into MRP. International Journal of Production Research, 35(4), 1147-1169.
Pegels, C., & Watrous, C. (2005). Application of the theory of constraints to a bottleneck operation in a manufacturing plant. Journal of Manufacturing Technology Management, 16(3), 302-311.
Radovilsky, Z. (1998). A quantitative approach to estimate the size of the time buffer in the theory of constraints. International Journal of Production Economics, 55(2), 113-119.
Rahman, S. (1998). Theory of constraints. International Journal of Operations & Production Management, 18(4), 336-355.
Rand, G. (2000). Critical chain: the theory of constraints applied to project management. International Journal of Project Management, 18(3), 173-177.
Ray, A., Sarkar, B., & Sanyal, S. (2010). The TOC-Based algorithm for solving multiple constraint resources. IEEE Transactions on Engineering Management, 57(2), 301-309.
Ray, A., Sarkar, B., & Sanyal, S. (2008). An improved theory of constraints. International Journal of Accounting & Information Management, 16(2), 155-165.
Sale, M., & Inman, R. (2003). Survey-based comparison of performance and change in performance of firms using traditional manufacturing, JIT and TOC. International Journal of Production Research, 41(4), 829-844.
Schragenheim, E., & Boaz, R. (1990). The Drum-Buffer-Rope shop floor control. Production and Inventory Management Journal, 31(3), 18-23.
Schragenheim, E. and Dettmer, H. (2000). Manufacturing at warp speed. Boca Raton, FL: St. Lucie Press.
Steele, D., Philipoom, P., Malhotra, M., & Fry, T. (2005). Comparisons between drum–buffer–rope and material requirements planning: a case study. International Journal of Production Research, 43(15), 3181-3208.
Wu, S., Morris, J., & Gordon, T. (1994). A simulation analysis of the effectiveness of drum-buffer-rope scheduling in furniture manufacturing. Computers & Industrial Engineering, 26(4), 757-764.