How to cite this paper
Santos, A., Madureira, A & Varela, M. (2015). An ordered heuristic for the allocation of resources in unrelated parallel-machines.International Journal of Industrial Engineering Computations , 6(2), 145-156.
Refrences
Baker, K. R., & Trietsch, D. (2009). Principles of Sequencing and Scheduling (First Edition). Wiley.
Blazewicz, A.J., Ecker, K. H., Pesh, E., Schmidt, G., & Weglarz, J. (2001). Scheduling Computer and Manufacturing Process (Second Edition). Springer.
Braun, T. D., Siegel, H. J., Beck, N., B?l?ni, L. L., Maheswaran, M., Reuther, A. I., ... & Freund, R. F. (2001). A comparison of eleven static heuristics for mapping a class of independent tasks onto heterogeneous distributed computing systems. Journal of Parallel and Distributed computing, 61(6), 810-837.
Brice?o, L. D., Siegel, H. J., Maciejewski, A. A., & Oltikar, M. (2012). Characterization of the iterative application of makespan heuristics on non-makespan machines in a heterogeneous parallel and distributed environment. The Journal of Supercomputing, 62(1), 461-485.
Ebenlendr, T., Kr??l, M., & Sgall, J. (2014). Graph balancing: A special case of scheduling unrelated parallel machines. Algorithmica, 68(1), 62-80.
Chaturvedi, A. K., & Sahu, R. (2011). New heuristic for scheduling of independent tasks in computational grid. International Journal of Grid and Distributed Computing, 4(3), 25-36.
Fujimoto, N., & Hagihara, K. (2004). A Comparison among grid scheduling algorithms for independent coarse-grained tasks. SAINT Workshops, 674-680.
Glass, C. A., Potts, C. N., & Shade, P. (1994). Unrelated parallel machine scheduling using local search. mathematical. Computer Modeling, 20(2), 41-52.
Gupta, K., & Singh, M. (2012). Heuristic based task scheduling in grid. International Journal of Engineering and Technology, 4(4), 254-260.
Hariri, A., & Potts, C. (1991). Heuristics for scheduling unrelated parallel-machines. Computers and Operations Research, 18(3), 323–331.
Ibbara, O., & Kim, C. (1977). Heuristic algorithms for scheduling independent tasks of no identical processors. Journal of Association for Computing Machinery, 24(2), 280-289.
Lenstra, J. K., Shmoys, D. B., & Tardos, E. (1990). Approximation algorithms for scheduling unrelated parallel machines. Mathematical Programming, 46(1-3), 256-271.
Lin, Y. K., Pfund, M. E., & Flower, J. W. (2011). Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems. Computer & Operations Research, 38(6), 901-916.
Martello, S., Soumis, F., & Toth, P. (1997). Exact and approximation algorithms for makespan minimization on unrelated parallel machines. Discrete Applied Mathematics, 75(2), 169-188.
Paranhos, D., Cirne, W., & Brasileiro, F. V. (2003). Trading cycles for information: Using replication to schedule bag-of-tasks application on computational grids. International Conference on Parallel and Distributed Computing, 2790, 169-180.
Pfund, M., Flower, J. W., Jatinder, & Gupta, J. N. D. (2004). A survey of algorithms for single and multi-objective unrelated parallel-machine deterministic scheduling problems. Journal of the Chinese Institute of Industrial Engineers, 21(3), 230-241.
Pinedo, M. L. (2012). Scheduling Theory, Algorithms, and Systems (Fourth Edition). Springer.
Serra e Santos, & A., Madureira, A. M. (2014). Ordered minimum completion time heuristic for unrelated parallel-machines. Proceedings of the 9th Iberian Conference on Information Systems and Technologies (CISTI2014), 695-700.
Sivasankaran, P., Sornakumar, T., & Panneerselvam, R. (2010). Efficient heuristic to minimize makespan in single machine scheduling problem with unrelated parallel machines. Intelligent Information Management, 2, 188-198.
Sugavanam, P., Siegel, H. J., Maciejewski, A. A., Oltikar, M., Mehta, A., Pichel, R., ... & Pippin, A. (2007). Robust static allocation of resources for independent tasks under makespan and dollar cost constraints. Journal of Parallel and Distributed Computing, 67(4), 400-416.
Vakhania, N., Hernandez, J. A., & Werner, F. (2014). Scheduling unrelated machines with two types of jobs. International Journal of Production Research, 52(13), 3793-3801.
Varela, L. R., & Ribeiro, R. A., (2003). Evaluation of simulated annealing to solve fuzzy optimization problems, Journal of Intelligent & Fuzzy Systems, 14(2), 59-71.
Varela, M.L.R., Apar?cio, J.N., & Silva, S.C. (2003), A web-based application for manufacturing scheduling. Proceedings of the International Conference on Intelligent Systems and Control (IASTED), 400- 405.
Varela, M. L. R., & Carmo-Silva, S. (2008). An ontology for a model of manufacturing scheduling problems to be solved on the web. Innovation in Manufacturing Networks, 8th IFIP International Conference on Information Technology for Balanced Automation Systems. Azevedo, A. (Ed.); Springer, 197-204.
Varela, M. L. R., Barbosa, R., & Putnik, Goran (2012). Experimental platform for collaborative inter and intra cellular fuzzy scheduling in an ubiquitous manufacturing system, Proceedings of the First International Conference on Virtual and Network Organizations Emergent Technologies and Tools (ViNOrg & apos; 11), 227-236.
Varela, M. L. R., Putnik G. D., & Cruz-Cunha M. M., (2012) Web-based technologies integration for distributed manufacturing scheduling in a virtual enterprise. International Journal of Web Portals, 4( 2), 19-39.
Varela, M. L. R., Putnik, G. D, & Ribeiro, R. A. (2012). A web-based platform for collaborative manufacturing scheduling in a virtual enterprise. Information and Communication Technologies for the Advanced Enterprise an international journal, 2, 87-108.
Varela, M. L. R., & Ribeiro, R. A. (2014), Distributed manufacturing scheduling based on a dynamic multi-criteria decision model. Studies in Fuzziness and Soft Computing, 317, 81-93.
Verschae, J., & Wiese, A. (2014). On the configuration-LP for scheduling on unrelated machines. Journal of Scheduling, 17, 371-383.
Xhafa, F., & Abraham, A. (2008). Metaheuristics for scheduling in industrial and manufacturing applications series: Studies in computational intelligence, 128, Springer.
Blazewicz, A.J., Ecker, K. H., Pesh, E., Schmidt, G., & Weglarz, J. (2001). Scheduling Computer and Manufacturing Process (Second Edition). Springer.
Braun, T. D., Siegel, H. J., Beck, N., B?l?ni, L. L., Maheswaran, M., Reuther, A. I., ... & Freund, R. F. (2001). A comparison of eleven static heuristics for mapping a class of independent tasks onto heterogeneous distributed computing systems. Journal of Parallel and Distributed computing, 61(6), 810-837.
Brice?o, L. D., Siegel, H. J., Maciejewski, A. A., & Oltikar, M. (2012). Characterization of the iterative application of makespan heuristics on non-makespan machines in a heterogeneous parallel and distributed environment. The Journal of Supercomputing, 62(1), 461-485.
Ebenlendr, T., Kr??l, M., & Sgall, J. (2014). Graph balancing: A special case of scheduling unrelated parallel machines. Algorithmica, 68(1), 62-80.
Chaturvedi, A. K., & Sahu, R. (2011). New heuristic for scheduling of independent tasks in computational grid. International Journal of Grid and Distributed Computing, 4(3), 25-36.
Fujimoto, N., & Hagihara, K. (2004). A Comparison among grid scheduling algorithms for independent coarse-grained tasks. SAINT Workshops, 674-680.
Glass, C. A., Potts, C. N., & Shade, P. (1994). Unrelated parallel machine scheduling using local search. mathematical. Computer Modeling, 20(2), 41-52.
Gupta, K., & Singh, M. (2012). Heuristic based task scheduling in grid. International Journal of Engineering and Technology, 4(4), 254-260.
Hariri, A., & Potts, C. (1991). Heuristics for scheduling unrelated parallel-machines. Computers and Operations Research, 18(3), 323–331.
Ibbara, O., & Kim, C. (1977). Heuristic algorithms for scheduling independent tasks of no identical processors. Journal of Association for Computing Machinery, 24(2), 280-289.
Lenstra, J. K., Shmoys, D. B., & Tardos, E. (1990). Approximation algorithms for scheduling unrelated parallel machines. Mathematical Programming, 46(1-3), 256-271.
Lin, Y. K., Pfund, M. E., & Flower, J. W. (2011). Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems. Computer & Operations Research, 38(6), 901-916.
Martello, S., Soumis, F., & Toth, P. (1997). Exact and approximation algorithms for makespan minimization on unrelated parallel machines. Discrete Applied Mathematics, 75(2), 169-188.
Paranhos, D., Cirne, W., & Brasileiro, F. V. (2003). Trading cycles for information: Using replication to schedule bag-of-tasks application on computational grids. International Conference on Parallel and Distributed Computing, 2790, 169-180.
Pfund, M., Flower, J. W., Jatinder, & Gupta, J. N. D. (2004). A survey of algorithms for single and multi-objective unrelated parallel-machine deterministic scheduling problems. Journal of the Chinese Institute of Industrial Engineers, 21(3), 230-241.
Pinedo, M. L. (2012). Scheduling Theory, Algorithms, and Systems (Fourth Edition). Springer.
Serra e Santos, & A., Madureira, A. M. (2014). Ordered minimum completion time heuristic for unrelated parallel-machines. Proceedings of the 9th Iberian Conference on Information Systems and Technologies (CISTI2014), 695-700.
Sivasankaran, P., Sornakumar, T., & Panneerselvam, R. (2010). Efficient heuristic to minimize makespan in single machine scheduling problem with unrelated parallel machines. Intelligent Information Management, 2, 188-198.
Sugavanam, P., Siegel, H. J., Maciejewski, A. A., Oltikar, M., Mehta, A., Pichel, R., ... & Pippin, A. (2007). Robust static allocation of resources for independent tasks under makespan and dollar cost constraints. Journal of Parallel and Distributed Computing, 67(4), 400-416.
Vakhania, N., Hernandez, J. A., & Werner, F. (2014). Scheduling unrelated machines with two types of jobs. International Journal of Production Research, 52(13), 3793-3801.
Varela, L. R., & Ribeiro, R. A., (2003). Evaluation of simulated annealing to solve fuzzy optimization problems, Journal of Intelligent & Fuzzy Systems, 14(2), 59-71.
Varela, M.L.R., Apar?cio, J.N., & Silva, S.C. (2003), A web-based application for manufacturing scheduling. Proceedings of the International Conference on Intelligent Systems and Control (IASTED), 400- 405.
Varela, M. L. R., & Carmo-Silva, S. (2008). An ontology for a model of manufacturing scheduling problems to be solved on the web. Innovation in Manufacturing Networks, 8th IFIP International Conference on Information Technology for Balanced Automation Systems. Azevedo, A. (Ed.); Springer, 197-204.
Varela, M. L. R., Barbosa, R., & Putnik, Goran (2012). Experimental platform for collaborative inter and intra cellular fuzzy scheduling in an ubiquitous manufacturing system, Proceedings of the First International Conference on Virtual and Network Organizations Emergent Technologies and Tools (ViNOrg & apos; 11), 227-236.
Varela, M. L. R., Putnik G. D., & Cruz-Cunha M. M., (2012) Web-based technologies integration for distributed manufacturing scheduling in a virtual enterprise. International Journal of Web Portals, 4( 2), 19-39.
Varela, M. L. R., Putnik, G. D, & Ribeiro, R. A. (2012). A web-based platform for collaborative manufacturing scheduling in a virtual enterprise. Information and Communication Technologies for the Advanced Enterprise an international journal, 2, 87-108.
Varela, M. L. R., & Ribeiro, R. A. (2014), Distributed manufacturing scheduling based on a dynamic multi-criteria decision model. Studies in Fuzziness and Soft Computing, 317, 81-93.
Verschae, J., & Wiese, A. (2014). On the configuration-LP for scheduling on unrelated machines. Journal of Scheduling, 17, 371-383.
Xhafa, F., & Abraham, A. (2008). Metaheuristics for scheduling in industrial and manufacturing applications series: Studies in computational intelligence, 128, Springer.