How to cite this paper
pour, A & Ghobadi, S. (2018). Optimal selling price, replenishment lot size and number of shipments for two-echelon supply chain model with deteriorating items.Decision Science Letters , 7(3), 311-322.
Refrences
Arshinder, K., Kanda, A., & Deshmukh, S. G. (2011). A review on supply chain coordination: coordination mechanisms, managing uncertainty and research directions. In Supply Chain Coordination under Uncertainty (pp. 39-82). Springer Berlin Heidelberg.
Chen, H., Chen, Y. F., Chiu, C. H., Choi, T. M., & Sethi, S. (2010) Coordination mechanism for the supply chain with lead-time consideration and price-dependent demand. European Journal of Operational Research, 203(1), 70-80.
Chen, X., & Simchi-Levi, D. (2012). Pricing and inventory management. The Oxford handbook of pricing management, 784-822.
Chen, X., Pang, Z., & Pan, L. (2014). Coordinating inventory control and pricing strategies for perishable products. Operations Research, 62(2), 284-300.
Chen, Z., & Sarker, B. R. (2015). Optimisation of multi-stage JIT production-pricing decision: centralised and decentralised models and algorithms. International Journal of Production Research, 53(20), 6210-6230.
Ding, H., Guo, B., & Liu, Z. (2011). Information sharing and profit allotment based on supply chain cooperation. International Journal of Production Economics, 133(1), 70-79.
Forghani, K., Mirzazadeh, A., & Rafiee, MA. (2012). price-dependent demand model in the single period inventory system with price adjustment. Journal of Industrial Engineering, 2013.
Glock, C. H. (2012). The joint economic lot size problem: A review. International Journal of Production Economics, 135(2), 671-686.
Grubbström, R. W. (2014). Dynamic lotsizing with a finite production rate. International Journal of Production Economics, 149, 68-79.
Hammami, R., Nouira, I., & Frein, Y. (2015). Carbon emissions in a multi-echelon production-inventory model with lead time constraints. International Journal of Production Economics, 164, 292-307.
Jaber, M. Y., & Zolfaghari, S. (2008). Quantitative models for centralized supply chain coordination. INTECH Open Access Publisher.
Jia, J., & Hu, Q. (2011). Dynamic ordering and pricing for a perishable goods supply chain. Computers & Industrial Engineering, 60(2), 302-309.
Jonas, C. P. (2013). A collaborative strategy for deteriorating inventory system with imperfect items and supplier credits. International Journal of Production Economics, 143(2), 403-409.
Kim, S. L., & Ha, D. (2003). A JIT lot-splitting model for supply chain management: Enhancing buyer–supplier linkage. International Journal of Production Economics, 86(1), 1-10.
Kumar, B. K., Nagaraju, D., & Narayanan, S. (2014). Optimality of Inventory Decisions and Shipment Policies in a Two-Echelon Inventory System under Quadratic Price Dependent Demand. Procedia Engineering, 97, 2279-2288.
Law, S. T., & Wee, H. M. (2006). An integrated production-inventory model for ameliorating and deteriorating items taking account of time discounting. Mathematical and Computer Modelling; 43(5), 673-685.
Lee, J. (2014). Dynamic pricing inventory control under fixed cost and lost sales. Applied Mathematical Modelling, 38(2), 712-721.
Lee, W. J. (1993). Determining Order Quantity and Selling Price by Geometric Programming: Optimal Solution, Bounds, and Sensitivity. Decision Sciences, 24(1), 76-87.
Nagaraju, D., Ramakrishnarao, A., & Narayanan, S (2012). Two-echelon supply chain with selling price dependent demand under wholesale price index and consumer price index. International Journal of Logistics Systems and Management, 13(4), 417-439.
Najafi Ghobadi, S., Nakhai Kamalabadi, I., & Aghdasi, M. (2013). Joint Pricing and Inventory Control for Non-instantaneous Deteriorating Items with Stochastic Demand. International Journal of Supply Chain Management, 1(3).
Pal, B., Sana, S. S., & Chaudhuri, K. (2012). A multi-echelon supply chain model for rework able items in multiple-markets with supply disruption. Economic Modelling, 29(5), 1891-1898.
Qin, Y., Tang, H., & Guo, C. (2007). Channel coordination and volume discounts with price-sensitive demand. International Journal of Production Economics, 105(1), 43-53.
Rahdar, M., & Nookabadi, A. S. (2014). Coordination mechanism for a deteriorating item in a two-level supply chain system. Applied Mathematical Modelling, 38(11), 2884-2900.
Roy, A., Sana, S. S., & Chaudhuri, K. (2012). Optimal replenishment order for uncertain demand in three layer supply chain. Economic Modelling, 29 (6), 2274-2282.
Simchi-Levi, D., Chen, X., & Bramel, J. (2014) Integration of inventory and pricing. In The Logic of Logistics. Springer New York, 177-209.
Taleizadeh, A. A., Noori-daryan, M., & Cárdenas-Barrón, L. E. (2015). Joint optimization of price, replenishment frequency, replenishment cycle and production rate in vendor managed inventory system with deteriorating items. International Journal of Production Economics, 159, 285-295.
Wang, S. P., Lee, W., & Chang, C. Y. (2012). Modeling the consignment inventory for a deteriorating item while the buyer has warehouse capacity constraint. International Journal of Production Economics, 138(2), 284-292.
Yang, P. C., & Wee, H. MA (2006). collaborative inventory system with permissible delay in payment for deteriorating items. Mathematical and computer modelling, 43(3), 209-221.
Yang, Y., Chen, Y., & Zhou, Y. (2014). Coordinating inventory control and pricing strategies under batch ordering. Operations Research, 62(1), 25-37.
Zhou, S. X., & Chao, X. (2014), Dynamic pricing and inventory management with regular and expedited supplies. Production and Operations Management, 23(1), 65-80.
Chen, H., Chen, Y. F., Chiu, C. H., Choi, T. M., & Sethi, S. (2010) Coordination mechanism for the supply chain with lead-time consideration and price-dependent demand. European Journal of Operational Research, 203(1), 70-80.
Chen, X., & Simchi-Levi, D. (2012). Pricing and inventory management. The Oxford handbook of pricing management, 784-822.
Chen, X., Pang, Z., & Pan, L. (2014). Coordinating inventory control and pricing strategies for perishable products. Operations Research, 62(2), 284-300.
Chen, Z., & Sarker, B. R. (2015). Optimisation of multi-stage JIT production-pricing decision: centralised and decentralised models and algorithms. International Journal of Production Research, 53(20), 6210-6230.
Ding, H., Guo, B., & Liu, Z. (2011). Information sharing and profit allotment based on supply chain cooperation. International Journal of Production Economics, 133(1), 70-79.
Forghani, K., Mirzazadeh, A., & Rafiee, MA. (2012). price-dependent demand model in the single period inventory system with price adjustment. Journal of Industrial Engineering, 2013.
Glock, C. H. (2012). The joint economic lot size problem: A review. International Journal of Production Economics, 135(2), 671-686.
Grubbström, R. W. (2014). Dynamic lotsizing with a finite production rate. International Journal of Production Economics, 149, 68-79.
Hammami, R., Nouira, I., & Frein, Y. (2015). Carbon emissions in a multi-echelon production-inventory model with lead time constraints. International Journal of Production Economics, 164, 292-307.
Jaber, M. Y., & Zolfaghari, S. (2008). Quantitative models for centralized supply chain coordination. INTECH Open Access Publisher.
Jia, J., & Hu, Q. (2011). Dynamic ordering and pricing for a perishable goods supply chain. Computers & Industrial Engineering, 60(2), 302-309.
Jonas, C. P. (2013). A collaborative strategy for deteriorating inventory system with imperfect items and supplier credits. International Journal of Production Economics, 143(2), 403-409.
Kim, S. L., & Ha, D. (2003). A JIT lot-splitting model for supply chain management: Enhancing buyer–supplier linkage. International Journal of Production Economics, 86(1), 1-10.
Kumar, B. K., Nagaraju, D., & Narayanan, S. (2014). Optimality of Inventory Decisions and Shipment Policies in a Two-Echelon Inventory System under Quadratic Price Dependent Demand. Procedia Engineering, 97, 2279-2288.
Law, S. T., & Wee, H. M. (2006). An integrated production-inventory model for ameliorating and deteriorating items taking account of time discounting. Mathematical and Computer Modelling; 43(5), 673-685.
Lee, J. (2014). Dynamic pricing inventory control under fixed cost and lost sales. Applied Mathematical Modelling, 38(2), 712-721.
Lee, W. J. (1993). Determining Order Quantity and Selling Price by Geometric Programming: Optimal Solution, Bounds, and Sensitivity. Decision Sciences, 24(1), 76-87.
Nagaraju, D., Ramakrishnarao, A., & Narayanan, S (2012). Two-echelon supply chain with selling price dependent demand under wholesale price index and consumer price index. International Journal of Logistics Systems and Management, 13(4), 417-439.
Najafi Ghobadi, S., Nakhai Kamalabadi, I., & Aghdasi, M. (2013). Joint Pricing and Inventory Control for Non-instantaneous Deteriorating Items with Stochastic Demand. International Journal of Supply Chain Management, 1(3).
Pal, B., Sana, S. S., & Chaudhuri, K. (2012). A multi-echelon supply chain model for rework able items in multiple-markets with supply disruption. Economic Modelling, 29(5), 1891-1898.
Qin, Y., Tang, H., & Guo, C. (2007). Channel coordination and volume discounts with price-sensitive demand. International Journal of Production Economics, 105(1), 43-53.
Rahdar, M., & Nookabadi, A. S. (2014). Coordination mechanism for a deteriorating item in a two-level supply chain system. Applied Mathematical Modelling, 38(11), 2884-2900.
Roy, A., Sana, S. S., & Chaudhuri, K. (2012). Optimal replenishment order for uncertain demand in three layer supply chain. Economic Modelling, 29 (6), 2274-2282.
Simchi-Levi, D., Chen, X., & Bramel, J. (2014) Integration of inventory and pricing. In The Logic of Logistics. Springer New York, 177-209.
Taleizadeh, A. A., Noori-daryan, M., & Cárdenas-Barrón, L. E. (2015). Joint optimization of price, replenishment frequency, replenishment cycle and production rate in vendor managed inventory system with deteriorating items. International Journal of Production Economics, 159, 285-295.
Wang, S. P., Lee, W., & Chang, C. Y. (2012). Modeling the consignment inventory for a deteriorating item while the buyer has warehouse capacity constraint. International Journal of Production Economics, 138(2), 284-292.
Yang, P. C., & Wee, H. MA (2006). collaborative inventory system with permissible delay in payment for deteriorating items. Mathematical and computer modelling, 43(3), 209-221.
Yang, Y., Chen, Y., & Zhou, Y. (2014). Coordinating inventory control and pricing strategies under batch ordering. Operations Research, 62(1), 25-37.
Zhou, S. X., & Chao, X. (2014), Dynamic pricing and inventory management with regular and expedited supplies. Production and Operations Management, 23(1), 65-80.